LG Electronics LGENBOX-01, LGxxxA1C-B3 installation instructions Accessories, Diagram Details

Page 30

5 Accessories

 

 

 

Item

 

Model Number

Diagram

Details

 

 

LTC10-M3

1.0 m

 

 

Male

(1.0m)

(39.37 inch)

 

 

LTC15-M3

1.5 m

 

 

 

- Used to connect

Transition

 

(1.5m)

(59.06 inch)

 

 

 

the first module in

Cable

 

LTC10-F3

1.0 m

the array to the AC

 

 

junction box.

 

Female

(1.0m)

(39.37 inch)

 

 

 

 

 

 

 

LTC15-F3

1.5 m

 

 

 

(1.5m)

(59.06 inch)

 

 

Male

 

1.6 m

 

 

 

(62.99 in.)

 

 

+

LEC16-MM3

 

 

 

Male

 

 

 

 

 

 

1.6 m

 

Extension

Female

LEC16-FF3

(62.99 in.)

- Used to connect to

 

Cable

+

 

remote modules.

 

Female

 

 

 

 

 

 

3.2 m

 

 

Female

 

(125.98 in.)

 

 

+

LEC32-FM3

 

 

 

Male

 

 

 

 

Male

LECAP-M3

 

- Seal the unused

 

 

 

 

connector of the

 

 

 

 

last AC module.

End Cap

 

 

 

- Dust prevention.

 

 

 

 

 

Female

LECAP-F3

 

- Waterproof.

 

 

 

Unlocking Tool

LAC-UNLOCK

 

- Used for

 

disassembly of the

 

 

 

 

connector.

30

Image 30
Contents AC Module System Installation Instructions Table of Contents RevisionsSafety Safety SymbolsImportant Safety Instructions For Micro inverter & Communication Gateway Circuit SymbolsFCC Guidelines For Communication Gateway Indoor use onlyAC Module System IntroductionAdvantages of AC Module System Communication gatewayBefore Installation Inspecting the Area of InstallationAC Module Inspecting Components of the AC Module Measuring AC Voltage of the UtilityWiring Diagram of AC Module System Installing the AC Junction Box and PV Rack Product SpecificationMounting the AC module Fix AC module to the PV rack in the following order Mounting According to the Type of PV rack Trunk connector removal Connecting AC Modules Trunk CableTrunk connector insertion Trunk cable usage and maintenancePage Checking the Accessories Checking AccessoryCable Usages According to AC Junction Box Locations Grounding Samples for Grounding Male transition cable AC output single phase 240VAC Connect the general AC cables in the following orderAC output three phase 208VAC merge type AC output three phase 208VAC split type Maintenance OperationEnerBoxTM Communication Gateway Checking Components of the Communication GatewayConnecting to the Communication Gateway LED status TroubleshootingConfiguring the Installation App Checking installed AC modules LGElectronics Checking conditions of installed AC modules Setting the grid configurationSetting System Configuration WebsiteAccessories Diagram DetailsParameter Section Value Product SpecificationsAC Module Section 240VAC 208VACDimensions EnerBox Internal Communication with AC moduleResponse to Abnormal Conditions Dedicated CablesRange Clearing Time s Contact WarrantyTransporting and Storage Disclaimer of Liability
Related manuals
Manual 24 pages 22.32 Kb