LG Electronics LGxxxA1C-B3, LGENBOX-01 installation instructions Configuring the Installation App

Page 25

4-3 Configuring the Installation App

After installation of the gateway is completed, you can monitor the solar system by installation app. To check and configure AC module system, follow the steps below.

Step 1. Running the Installation App

Connect mobile device (phone or tablet) to the gateway via wireless connection and run the installation app.

• Default SSID : LGE_EnerBox

• Default password : 87654321

When changing SSID, do not include any special characters, symbols or spaces. When running the app via other gateway, please exit the running app.

Step 2. Entering installer mode

Press the title bar for 3-5 seconds to enter installer mode.

CAUTION

Only certified installers should enter the installer mode.

PV system may malfunction.

MAC Address List (Step 3)

Register Installed AC modules.

AC Module Status (Step 4)

Check conditions of installed AC modules.

Grid Configuration (Step 5)

Check/Change the grid configuration.

System Status

Check conditions of installed solar system.

System Update

Update firmware for the gateway.

System Configuration (Step 6)

Check the Ethernet and set the NTP, web server, service type.

LGE Mode

Engineer-only mode.

[Installer Mode]

• For reliable communication, it is not recommended to access through satellite Internet or 3G mobile Internet.

25

Image 25
Contents AC Module System Installation Instructions Revisions Table of ContentsSafety Symbols SafetyImportant Safety Instructions FCC Guidelines Circuit SymbolsFor Micro inverter & Communication Gateway For Communication Gateway Indoor use onlyAdvantages of AC Module System IntroductionAC Module System Communication gatewayInspecting the Area of Installation Before InstallationAC Module Measuring AC Voltage of the Utility Inspecting Components of the AC ModuleWiring Diagram of AC Module System Product Specification Installing the AC Junction Box and PV RackMounting the AC module Fix AC module to the PV rack in the following order Mounting According to the Type of PV rack Trunk connector insertion Connecting AC Modules Trunk CableTrunk connector removal Trunk cable usage and maintenancePage Checking Accessory Checking the AccessoriesCable Usages According to AC Junction Box Locations Grounding Samples for Grounding Male transition cable Connect the general AC cables in the following order AC output single phase 240VACAC output three phase 208VAC merge type AC output three phase 208VAC split type Operation MaintenanceChecking Components of the Communication Gateway EnerBoxTM Communication GatewayLED status Troubleshooting Connecting to the Communication GatewayConfiguring the Installation App Checking installed AC modules LGElectronics Setting the grid configuration Checking conditions of installed AC modulesWebsite Setting System ConfigurationDiagram Details AccessoriesAC Module Product SpecificationsParameter Section Value Section 240VAC 208VACDimensions Internal Communication with AC module EnerBoxDedicated Cables Response to Abnormal ConditionsRange Clearing Time s Transporting and Storage WarrantyContact Disclaimer of Liability