LG Electronics LGxxxA1C-B3, LGENBOX-01 Website, Setting System Configuration

Page 29

 

Default Mode

Hawaii Mode1)

Frequency

59.3 ~ 60.5 Hz

57.0 ~ 60.5 Hz

1)In Hawaii mode, Transient Over-Voltage (TOV) mitigation is applied. For details, refer to Chapter 6-3. Response to Abnormal Conditions.

CAUTION

• Set the grid configuration best suited to the installation area. PV system may malfunction otherwise.

Step 6. Setting System Configuration

Entering System Configuration, you can select Ethernet, NTP sever, web server or service type.

1

2

3

4

5

67

To preventing set up error, it is recommended to set in the following order.

1After running the app, click Time Synchronization to sync the time zone of the gateway and web server .

2If the IP address is assigned from the broadband router automatically . Check that it has been assigned.

3Network time protocol.

4Enter URL, press Set button.

5Check Web server connection after pressing the Set button.

When connected it will read, “Web Server has been connected”. If not connected it will read, “Web Server is not connected”.

6Determine the web server communication. If you do not accept the personal information agreement, set OFF in order to disable the Ethernet communication.

7Next, press Set button to finish web server activation.

4-4 Website

For more information on monitoring, please refer to AC module web server manual at http://enervu.lg-solar.com/support/downloads.

29

Image 29
Contents AC Module System Installation Instructions Revisions Table of ContentsImportant Safety Instructions SafetySafety Symbols FCC Guidelines Circuit SymbolsFor Micro inverter & Communication Gateway For Communication Gateway Indoor use onlyAdvantages of AC Module System IntroductionAC Module System Communication gatewayAC Module Before InstallationInspecting the Area of Installation Measuring AC Voltage of the Utility Inspecting Components of the AC ModuleWiring Diagram of AC Module System Mounting the AC module Installing the AC Junction Box and PV RackProduct Specification Fix AC module to the PV rack in the following order Mounting According to the Type of PV rack Trunk connector insertion Connecting AC Modules Trunk CableTrunk connector removal Trunk cable usage and maintenancePage Checking Accessory Checking the AccessoriesCable Usages According to AC Junction Box Locations Grounding Samples for Grounding Male transition cable Connect the general AC cables in the following order AC output single phase 240VACAC output three phase 208VAC merge type AC output three phase 208VAC split type Operation MaintenanceChecking Components of the Communication Gateway EnerBoxTM Communication GatewayLED status Troubleshooting Connecting to the Communication GatewayConfiguring the Installation App Checking installed AC modules LGElectronics Setting the grid configuration Checking conditions of installed AC modulesWebsite Setting System ConfigurationDiagram Details AccessoriesAC Module Product SpecificationsParameter Section Value Section 240VAC 208VACDimensions Internal Communication with AC module EnerBoxRange Clearing Time s Response to Abnormal ConditionsDedicated Cables Transporting and Storage WarrantyContact Disclaimer of Liability