LG Electronics LGENBOX-01, LGxxxA1C-B3 installation instructions Checking installed AC modules

Page 26

Step 3. Checking installed AC modules

 

 

 

LGElectronics

 

 

 

 

 

 

 

1

After connecting the AC module system at the grid,

2

If all are displayed, press the Registration button.

 

press MAC Address List. Within 15 minutes,

 

Otherwise, press Back button. After waiting 2~3

 

check that all installed AC modules are displayed.

 

minutes, check that all modules are synced.

 

After 15 minutes, the AC modules may enter sleep

 

 

 

 

mode.

 

 

 

The PLC LED will turn to orange during updates. Do not press the Registration button. Allow about 5 seconds per module for update.

If modules are still not detected, turn off then turn back on the circuit breaker for AC module system to wake up modules in sleep mode. If this does not work, try plugging in the PLC cable to a different outlet near the distribution panel.

3Go to the next step and check that all modules have been registered.

Hitting the Registration button will configure the AC module system group that is visible to that gateway only. Any AC modules not registered to the group need to be re-registered after returning the gateway into the initial condition.

Add, Import, Export buttons can be used when replacing the gateway.

Note 1.

Adding AC modules:

If you pressed Registration button before listing all AC modules, or you need to add the unlisted AC module, follow steps below.

1Enter LGElectronics (initial password) on the blank box in figure and press EnerBox Group chage button to return the gateway into the initial condition.

Check PLC LED. It should turn red.

2Press the Back button. Wait for a minute and check that the PLC LED has changed green. Then, press MAC Address List and check if the additional AC modules have been listed.

If you can’t check the additional AC modules, connect the gateway to another outlet near the distribution panel and search for the unlisted AC modules.

3Press Registration button to finish.

LGElectronics

26

Image 26
Contents AC Module System Installation Instructions Table of Contents RevisionsImportant Safety Instructions SafetySafety Symbols For Micro inverter & Communication Gateway Circuit SymbolsFCC Guidelines For Communication Gateway Indoor use onlyAC Module System IntroductionAdvantages of AC Module System Communication gatewayAC Module Before InstallationInspecting the Area of Installation Inspecting Components of the AC Module Measuring AC Voltage of the UtilityWiring Diagram of AC Module System Mounting the AC module Installing the AC Junction Box and PV RackProduct Specification Fix AC module to the PV rack in the following order Mounting According to the Type of PV rack Trunk connector removal Connecting AC Modules Trunk CableTrunk connector insertion Trunk cable usage and maintenancePage Checking the Accessories Checking AccessoryCable Usages According to AC Junction Box Locations Grounding Samples for Grounding Male transition cable AC output single phase 240VAC Connect the general AC cables in the following orderAC output three phase 208VAC merge type AC output three phase 208VAC split type Maintenance OperationEnerBoxTM Communication Gateway Checking Components of the Communication GatewayConnecting to the Communication Gateway LED status TroubleshootingConfiguring the Installation App Checking installed AC modules LGElectronics Checking conditions of installed AC modules Setting the grid configurationSetting System Configuration WebsiteAccessories Diagram DetailsParameter Section Value Product SpecificationsAC Module Section 240VAC 208VACDimensions EnerBox Internal Communication with AC moduleRange Clearing Time s Response to Abnormal ConditionsDedicated Cables Contact WarrantyTransporting and Storage Disclaimer of Liability