LG Electronics LGxxxA1C-B3, LGENBOX-01 AC output three phase 208VAC split type

Page 21
Connect the hot conductors and neutral conductor in a general AC cable from the AC junction box to the designated terminal in the distribution panel.
Then, connect conductors in transition cables to the AC junction box as shown above.

AC output three phase 208VAC - split type

To form balanced three phases, it is recommended to use 3-array equal to the number of AC modules in each array . Below is other example for AC output cables connection of three phase 208VAC.

 

 

0 0 0 0 0

Meter

 

 

 

2-pole

3-pole

 

 

 

(Determined

 

 

20A

 

 

according to the

 

 

 

 

 

 

total current)

X11

 

 

 

 

X11

 

 

 

 

X11

 

 

 

 

 

 

N L1L2L3

G

 

 

 

An array of AC modules

AC junction box

Distribution panel

 

 

 

 

 

Transition Cable (Array ÷ AC Junction Box)

Conductor

Color

 

Description

L1

Black

 

Line to neutral voltage 120VAC.

L2

Red

 

Line to neutral voltage 120VAC.

Neutral

White

 

Common conductor used in the AC module for voltage measurements.

 

 

External Equipment Grounding Conductor (Array ÷ Distribution Panel)

Ground

Green

 

Conductor to connect normally non–current carrying metal parts of equipment together.

 

 

 

General Cable (AC Junction Box ÷ Distribution Panel)

L1

Black

 

Line to neutral voltage 120VAC.

L2

Red

 

Line to neutral voltage 120VAC.

L3

Blue

 

Line to neutral voltage 120VAC.

L1-L2

-

 

Line to line voltage 208VAC.

L2-L3

-

 

Line to line voltage 208VAC.

L3-L1

-

 

Line to line voltage 208VAC.

Neutral

White

 

Neutral wire.

Step 1. Connect the equipment grounding conductor from arrays of the AC modules system to the terminal for grounding in the distribution panel.

Step 2. 1

2

Step 3. Check the cables to verify they have not been pulled too tight or are hanging too loose. If necessary, fixate them using the cable fixing holes on PV module frame with fixing holders, such as cable ties, so that the cables do not touch the ground.

21

Image 21
Contents AC Module System Installation Instructions Revisions Table of ContentsSafety Safety SymbolsImportant Safety Instructions FCC Guidelines Circuit SymbolsFor Micro inverter & Communication Gateway For Communication Gateway Indoor use onlyAdvantages of AC Module System IntroductionAC Module System Communication gatewayBefore Installation Inspecting the Area of InstallationAC Module Measuring AC Voltage of the Utility Inspecting Components of the AC ModuleWiring Diagram of AC Module System Installing the AC Junction Box and PV Rack Product SpecificationMounting the AC module Fix AC module to the PV rack in the following order Mounting According to the Type of PV rack Trunk connector insertion Connecting AC Modules Trunk CableTrunk connector removal Trunk cable usage and maintenancePage Checking Accessory Checking the AccessoriesCable Usages According to AC Junction Box Locations Grounding Samples for Grounding Male transition cable Connect the general AC cables in the following order AC output single phase 240VACAC output three phase 208VAC merge type AC output three phase 208VAC split type Operation MaintenanceChecking Components of the Communication Gateway EnerBoxTM Communication GatewayLED status Troubleshooting Connecting to the Communication GatewayConfiguring the Installation App Checking installed AC modules LGElectronics Setting the grid configuration Checking conditions of installed AC modulesWebsite Setting System ConfigurationDiagram Details AccessoriesAC Module Product SpecificationsParameter Section Value Section 240VAC 208VACDimensions Internal Communication with AC module EnerBoxResponse to Abnormal Conditions Dedicated CablesRange Clearing Time s Transporting and Storage WarrantyContact Disclaimer of Liability