LG Electronics LGENBOX-01, LGxxxA1C-B3 Checking conditions of installed AC modules

Page 28

Step 4. Checking conditions of installed AC modules

1Enter into AC Module Status to check the operating status of the AC module system.

2If all AC modules status is not updated, press Back button and wait about 15 minutes until the next sync period. (Information is updated every 15 minutes.)

3Enter into AC Module Status to check the operating status of the AC module system again.

• If ground fault occurs, AC module automatically detects and stops.

Step 5. Setting the grid configuration

1Enter into Grid Configuration and set the grid configuration to suit your environment. If the grid configuration is wrong, AC modules may not operate correctly.

2Press the Set button. It takes about 5 seconds per module for setting.

3Press the Update button and check that the selected grid setting is correct. If all AC modules are not updated, please try again.

3

Factory setting

1

2

28

Image 28
Contents AC Module System Installation Instructions Table of Contents RevisionsSafety Symbols SafetyImportant Safety Instructions Circuit Symbols FCC GuidelinesFor Micro inverter & Communication Gateway For Communication Gateway Indoor use onlyIntroduction Advantages of AC Module SystemAC Module System Communication gatewayInspecting the Area of Installation Before InstallationAC Module Inspecting Components of the AC Module Measuring AC Voltage of the UtilityWiring Diagram of AC Module System Product Specification Installing the AC Junction Box and PV RackMounting the AC module Fix AC module to the PV rack in the following order Mounting According to the Type of PV rack Connecting AC Modules Trunk Cable Trunk connector insertionTrunk connector removal Trunk cable usage and maintenancePage Checking the Accessories Checking AccessoryCable Usages According to AC Junction Box Locations Grounding Samples for Grounding Male transition cable AC output single phase 240VAC Connect the general AC cables in the following orderAC output three phase 208VAC merge type AC output three phase 208VAC split type Maintenance OperationEnerBoxTM Communication Gateway Checking Components of the Communication GatewayConnecting to the Communication Gateway LED status TroubleshootingConfiguring the Installation App Checking installed AC modules LGElectronics Checking conditions of installed AC modules Setting the grid configurationSetting System Configuration WebsiteAccessories Diagram DetailsProduct Specifications AC ModuleParameter Section Value Section 240VAC 208VACDimensions EnerBox Internal Communication with AC moduleDedicated Cables Response to Abnormal ConditionsRange Clearing Time s Warranty Transporting and StorageContact Disclaimer of Liability