Sterling SCW Series installation manual Using the Advanced, Touchscreen Interface

Page 48

 

Using the Advanced

8

Touchscreen Interface

 

 

8-1 Touchscreen Interface Introduction (MMI)

The Advanced touchscreen interfaces let you control your SCW

Series central chilling station. You can do such things as:

• Control compressors and optional pumps

• View current statuses of operation, such as pressures, temperatures, and capacities

• Handle alarm conditions

The sections in this chapter list special instructions for operating either touchscreen interfaces.

Note: The screens shown in this chapter are sample screens. Actual screen representations may be slightly different in appearance, but are no different in operation. Also, the PLC is configured based on options and system configuration at the time of order. These screens are the basic ones to startup the chiller.

Page 48 of 77

SCW Series Central Chilling Stations

Image 48
Contents SCW Series Central Chilling Stations SCW Series Central Chilling Stations Safety Considerations Wear Safety Glasses and Work GlovesTable of Contents Startup Checklists Indicator Lights and Control Switches MMIViewing and Operating Chiller Pumps Charts and Figures Introduction Necessary DocumentsStandard Features Models CoveredStandard Features on Remote Condensers Available OptionsModel Number Nomeclature Typical Two-Circuit 60-195 Ton Water Cooled Chiller Nominal water flow gpm460/3/60 Vf Typical Two-Circuit 60-195 Ton Remote Air Cooled Chiller 460/3/60Scwr Series Remote Condenser Models Unpacking and Inspection Event of Shipping DamagesIf the Shipment is Not Complete If the Shipment is Not CorrectReturns Bill of lading Packing listUncrating Your New Chiller SCW Series Central Chilling Stations Installation Location Considerations Making Electrical ConnectionsCheck Compressor Rotation Before Starting Unit Piping Considerations Making Process Water ConnectionsTo Process Making Tank Piping Connections Water Connection Sizing Considerations Galvanic Corrosion ConsiderationsWater Treatment Considerations Making Water-Cooled Condenser ConnectionsInstalling the Remote Air-Cooled Condenser Condenser WaterCondenser Water Out Checking Motor Direction CompressorWater Pump Condenser Fan Alarms StagingLead-Lag Compressors Lead-Lag PumpsChilled Water Circuit Refrigeration CircuitFreezestat Control Freezing Protection Curve Percent byFlow Switch High pressure cutout settingHigh Pressure Cutout Low Pressure CutoutControl Nozzle Control ProbeChilled Water Manifold Optional Condenser Water ManifoldSCW Series Central Chilling Stations Startup Checklists Water-Cooled SCW Series Startup ChecklistSCW Series Central Chilling Stations Water-Cooled SCW Series Startup Remote Air-Cooled SCW Series Startup Checklist SCW Series Central Chilling Stations Remote Air-Cooled SCW Series Startup Fan Set on Set off Number Psi KPa BarsDetermining Flow Rate ShutdownIndicator Lights and Control Switches MMI Graphic Panel DevicesSCW Series Central Chilling Stations Using the Standard Operator InterfaceOperator Interface Introduction Using the SCW Series Standard Operator Interface SCW Series Standard Control PanelViewing and Operating Chiller Pumps Viewing Active Alarms and Handling Alarm Conditions Viewing and Setting System TemperaturesSetting System Temperatures Using the Advanced Touchscreen InterfaceTouchscreen Interface Introduction MMI Using the SCW Series Advanced Touchscreen Interface Viewing Compressor Status Main Menu ScreenChiller Status Screen Chiller Configuration Screen SCW Series Central Chilling Stations Compressor Run Time Display Screen Viewing Chiller Pump Status Pump Status Screen Pump Enables Screen Pump Run Time Display Screen Pumps Alarm Condition Screen Viewing and Setting System Temperatures System Status Screen Temperature Input Display Screen Condenser Maintenance LubricationRemote Air-Cooled Water-CooledEvaporator Maintenance Pump Motor SealMakeup Valve Recommended Pump Tank Spare PartsPreventive Maintenance Service SCW Series Central Chilling Stations Troubleshooting Problem Possible Cause Solution Verify proper rotation if Service Notes Index Determining Flow RateSCW Series Central Chilling Stations Service Notes Service Notes Service Notes Technical Assistance Parts Department