;Check the water level in the pump tank to be sure the pump does not run dry while the system piping is being filled.
;Check your work and proceed to the Startup procedure in the following section.
5-5 Remote Air-Cooled SCW Series Startup
1.Start the chiller by pushing the Start button on the control panel of the unit.
2.The touchscreen will display the Main Menu screen.
3.If your chiller has been setup to control the pump tank, the recirculation pump will turn on first, then after 5 seconds the process pump will turn on. If configured with a standby pump, the lead/lag will control which pump turns on.
4.Fifteen (15) seconds after the last pump turns on, the first compressor will turn on. Based on the temperature of the water, the controller will turn on compressors every 15 seconds.
5.Adjust the Freezestat
Note: If the recirculation pump does not turn on (or that the flow switch is not satisfied) the compressors will not be allowed to turn on.
6.Check the pump(s) amp draws and pressures. The amp draws must be within the pump(s) running load and service factor amps.
7.Operate the chiller, looking for leaks and listening for unusual noises or vibrations that could indicate improper operation.
8.Check condenser fans for pressure switch settings as shown in the table below:
Fan |
| Set on |
|
| Set off |
| |
number | psi | kPa | bars | psi | kPa |
| bars |
1 |
| Not applicable; Fan 1 is a |
| ||||
2 | 155 | 1,069 | 10.7 | 120 | 828 |
| 8.3 |
3 | 170 | 1,172 | 11.7 | 135 | 931 |
| 9.3 |
4 | 185 | 1,276 | 12.8 | 150 | 1035 |
| 10.3 |
5 | 200 | 1,379 | 13.8 | 165 | 1,138 |
| 11.4 |
SCW Series Central Chilling Stations | Page 39 of 77 |