3.Loosen the two collar nuts (1) which retain the screen holder.

2a 1

2b

4.Lower the link screws (2a, 2b) against the screen and lift out the screen holder.

5.Lower the link screws against the inside (as for 2b) of the cutter housing and lift out the screen for cleaning or changing the knives.

Hopper:

1.Release the protective cover or inlet funnel by pushing down the locking clamp (2) and pulling the funnel axially over the locking clamp. The safety switch's locking clamp is released, which cuts off the current to the screw motor and prevents the granulator from being operated with the hopper open.

5.3Electrical connection

The granulator should be connected up by an authorised

electrician.

Connect the granulator to the mains supply. See Electrical scheme, chapterÊ 9, connecting (Q1).

All connected electric motors have been set up with the intended rotation direction by setting up the internal electrical connection for clockwise rotating field.

Using a phase-sequence indicator, check that the incoming phases are connected to the granulator so that the intended, clockwise rotating field is maintained.

0 5 - 1 5 - 9 6

7 9

9

Image 9
Contents Manual Contents Introduction Dimensions Technical specificationsData Serial NumberOverview Functional descriptionSafety system = WARNING! Risk of being cut or caught in the machinery Safety regulationsPre-start checks InstallationTwo hours after first start Opening and closing the hopper and screenboxHopper Electrical connectionStarting and stopping Operation and daily maintenanceInspection Daily inspectionTrouble-shooting CleaningOr at least once every 300 hours If the granulator does not startServicing Changing the knivesChanging the fixed and rotating knives Assembling the upper fixed knife Assembling the rotating knivesOverview Sharpening the knivesSharpening the fixed and rotating knives Fixed knivesRotating knives Disassembling/assembling the screw DisassemblingAssembling Lubrication Spare parts list 1a 79, Diagram Pos Qty 1b 79, Table2 79, Knives, fixed and rotating Electrical scheme Layout Options 11.1.1 79, Air-veyor Delay time interval T2 the time Pause/pulse relay when emptying with Air-veyorLevel control, capacitive Setting the sensitivityStoring Transporting and storing