Getting Started
Eurotech Communication team is glad you have chosen to use the Eurotechs
This chapter is your Map for installation, configuration and monitoring tasks and includes a short explanation on each stage as well as references for more elaborated explanations, drawings and examples in other chapters. The following is a list of tasks you shall perform, where you shall go over it sequentially or skip tasks that are optional and not required for your current needs. It is advised that you will use the following tasks as your Do To List.
Make a print of this chapter and put notes on each stage when completed (e.g. V mark when done).
∙Mandatory - Check that all Package items are included
Refer to “Check your Package Items״ chapter for checking that all items that should be in your package.
∙Mandatory ‒ Install The Management Application
On the PC / Laptop allocated for the system management install the
Refer to “Chapter 2: Installing the Manager Application״ chapter for all items that should be in your package.
∙Mandatory connections
oInstall Power Cable o Install Ground Cable o Install Antennas
o Install ISDN cable
o Install
Refer to “Chapter 1: Connecting the Cables״ for specific and detailed guidelines.
∙Mandatory ‒ General configurations
In order to operate the system a mandatory basic setups should be performed in one of the two
optional connections, serial
Refer to Chapter 3: Basic configurations with the management application.
∙Mandatory - 1׳st time system configuration via
Use the
the option to manage your PRI GSM Gateway system via IP is highly recommended as you can have the management done remotely from the system via internet connection.
Refer to Chapter 3.1: Management via
“Chapter 3: Basic configurations with the management application״ and
PRI – GSM | 5 |