Greenheck Fan Part #470655 manual Maintenance - Fall, High Limit, Burner, Gas Train, Start-Up

Page 26
Maintenance - Fall

Maintenance - Fall

Start-Up

Repeat the Blower Start-Up Step #5 and Direct Gas Start-Up Step #1, 2 and 4a or 4b. This will ensure that the gas and air are set properly before the heating season begins and should lead to trouble free operation all winter.

High Limit

The high limit switch may have tripped over the summer, it should be checked and reset if necessary.

Burner

Inspect the burner for accumulation of scales on both the upstream and downstream sides of the mixing plates. Any scaling or foreign material should be removed with a wire brush. Refer to image below.

Visually check that all holes in the mixing plates are clear. If any burner ports are plugged (even partially), clear them with a piece of wire or another appropriate tool.

Replace or tighten any loose or missing fasteners on the mixing plates. Always use zinc plated or stainless steel fasteners.

Flame Rod

Spark Rod

Mixing Plate Holes

Burner Ports

Burner

Inspect and clean the flame and spark rod. Occasional replacement of the flame rod and spark rod may be necessary to ensure optimum unit performance.

If a UV sensor is used instead of a flame rod, the sensor’s lens should be cleaned at least once a year. The sensor may require more frequent cleaning, depending on the operating environment and should be checked periodically over the heating season.

warning

Do not enlarge burner ports when clearing a blockage, performance could be affected.

note

Flame rods can last many years, but because of thermal expansion of the porcelain, flame rods can fail over time.

Gas Train

The gas connections, joints and valves should be checked annually for tightness. Apply a soap and water solution to all piping; watch for bubbling which indicates a leak. Other leak testing methods can be used.

26 DGX Industrial Space Heating

®

Image 26
Contents If you smell gas 1.Open windows General Safety Information2.Do not touch electrical switches 3.Extinguish any open flameUnpacking Inspection and Maintenance during StorageReceiving HandlingInstallation Table of ContentsClearance to Combustibles / Service Clearances Troubleshooting2. Install Unit Installation of Indoor Unit1. Install Hangers 3. Seal Wall Opening2. Install Ductwork Installation of Arrangement DB / HZ1.Install Curb and/or Equipment Supports 4. Install Unit2. Install TSCP Installation of Diffuser and Remote Panel TSCP1. Install Diffuser Airflow3.Connect the Main Power Installation of Electrical Wiring1.Determine the Size of the Main Power Lines 4. Wire the Optional Convenience Outlet1.Determine the Supply Gas Requirements Installation of Gas Piping2.Install Additional Regulator if Required 3. Connect the Supply Gas Line5. Test the System for Leaks Start-Up- Blower4. Pipe the Optional Vent Line Pre Start-UpCheck3. Check for Vibration 5.Air Volume Measurement and Check2.Check the Blower Rotation 4. Motor Check1. Check the Supply Gas Pressure Start-UpDirect GasStart-UpDirect Gas • 100% Outside Air 4a. Set the Burner Air Pressure Differential5. Set the Low Fire Time Delay Start-UpDirect Gas 50/50 Recirculation4b. Set the Burner Air Pressure Differential 6. Set the Maximum Firing Rate7. Set the Minimum Firing Rate Start-UpDirect Gas continuedRegulators and Modulating Valves 8. Set Daytime Temperature10.Program the 7 Day Time Clock 11.Flame Signal Check9. Set Nighttime Temperature Flame Signal Check2.Switch S2 in Winter Mode Without 7-DayTimer1.Switch S2 in Summer Mode 3.Flame Safeguard FSG Sequence2.Switch S2 in Winter Mode Operation - Electrical Sequence With 7-DayTimer1.Switch S2 in Summer Mode 3.Flame Safeguard FSG SequenceTurn Supply Switch S2 On TroubleshootingBlower Does Not Operate ResetReference Blower Start-Up- Step #5 Motor OverampsTroubleshooting Reference Blower Start-Up- Step #2Troubleshooting Insufficient AirflowToo Much Airflow Reference Filters in the Maintenance sectionReference Bearings in the Maintenance section Excessive Noise or VibrationTroubleshooting Turn Heat Switch S4 On Heater Does Not OperateTroubleshooting Wire Heat Switch S4If problems remain, consult the factory TroubleshootingUncross wires and reconnect Heater Does Not OperateHeater Does Not Operate TroubleshootingAdjust drives as needed Reference Direct Gas Start-Up- Step #11Motors Maintenance - RoutineSnow Accumulation WheelsBearings FiltersBurner Maintenance - FallHigh Limit Gas TrainDGX Industrial Space Heating ReferenceTypical Gas Train Layout 400 – 800 MBH Reference Dirty Filter SwitchTypical Control Center Layout 28 DGX Industrial Space HeatingTypical setting varies Start-UpChecklistTypical setting 5 minutes 45ºF ReferenceMaintenance Log Maintenance Log Warranty Copyright 2012 Greenheck Fan Corporation