Friedrich SH20, SH14 installation manual Section V Shell Installation, Sash Window Installations

Page 11

SECTION V — SHELL INSTALLATION

(A) SASH WINDOW INSTALLATIONS

SHELL (CABINET) INSTALLATION – STANDARD SASH WINDOWS

STEP 1. Check the window sill and frame to be sure they are in good condition and firmly anchored to the wall. Repair if necessary.

STEP 2. CABINET MOUNTING: Raise the lower window sash 1/4" more than the height of the cabinet. Carefully slide the cabinet through the open window until the sill plate channel rests behind the window sill and the top support angle rests against the window (See Figure D). Center the cabinet side to side and drill three (3) 5/32" dia. pilot holes into the window sill using the holes in the cabinet sill plate as a guide. Install three (3) #12A x 2" long screws (Item #4) (See Figure D).

FIGURE D

 

 

Top Support Angle

Center cabinet side to

 

Pull window sash down behind

side in window

 

 

the top support angle

 

 

Drill 3 5/32" pilot holes and install 3

 

 

#12A x 2" long screws (Item #4)

 

 

 

 

Side Support Angle

Window sill

 

 

Locate the sill plate guide channel

 

just back of the window sill.

 

 

 

 

 

 

 

 

FIGURE E

3/8" (10 mm)

 

Down slope

 

 

Support

Support

 

Bracket

 

Bracket

(Item #1)

#12A x 2" Screw (Item #4)

A 1" x 4" or 2" x 4" spacer should be used between the wall and bracket when installed on aluminum, asbestos or vinyl siding.

10 - 24 Flat Weldnut (Item #3)

10 - 24 x 1" Hex Head Screw (Item #2)

STEP 3. OUTSIDE SUPPORT MOUNTING: Assemble the support brackets (Item #1) to the bottom rails of the cabinet with four (4) 10-24 1" long screws (Item #2) and four (4) 10–24 flat nuts (Item #3). Adjust the support brackets to bring the bottom pads in contact with the wall surface. (See Figure E.)

A 1" x 4" or 2" x 4" SPACER SHOULD BE USED BETWEEN THE WALL AND THE SUPPORT BRACKETS WHEN INSTALLED ON ALUMINUM OR VINYL SIDING). Drill 5/32" (4 mm) dia. pilot holes, and secure the brackets to the wall with two (2) #12A x 2" long screws (Item #4). Adjust the support brackets to provide an approximate 3/8" (10 mm) down slope towards the outside for drainage. Tighten all screws. (See Figure E).

Page 11

Image 11
Contents USE, CARE, Installation Manual Table of Contents Page Part 2 Filter Information Part 3 Maintenance ChecklistPart 4 Hazardgard Special Features Hazardgard Unit Special FeaturesPart 6 Exclusive Part 5 Control Panel Function Control PowerTemperature Control Section I Electrical Requirements Installation InstructionsAccessory Detail Hazardgard Window Mount Installation HardwareUnpacking the Unit Chassis Wiring and PreparationSection Before Shell Cabinet PreparationSash Window Installations Section V Shell InstallationSlope down Typical Installation Sill PlateSection B B Section a aWall Preparation THROUGH-THE-WALL InstallationsFigure L Frame Wall Construction Figure O Typical Installation Figure P Chassis InstallationFigure Q Friedrich Hazardgard Room AIR Conditioners Limited Warranty Page Manual DE USO Instalación Y Mantenimiento Seccion Instrucciones Para USO Y MantenimientoInstrucciones Para LA Instalacion PartePage Parte 3 Lista DE Control Para EL Mantenimiento Parte 2 Informacion Sobre EL FiltroParte 4 Caracteristicas Especiales DEL Hazardgard Parte 6 ¡EXCLUSIVA Parte 5 Panel DE ControlSeccion 1 Requerimientos Electricos Instrucciones Para InstalacionNúmero Descripción Cantidad De item Lista DE AccesoriosPreparacion Y Instalacion Electrica DEL Chasis SeccionDesempaque DE LA Unidad Antes Preparacion DEL Armazon GabineteInstalaciones EN Ventanas DE Bastidor Seccion V Instalacion DEL ArmazonPaso Instalacion Tipica DEL Filo DEL AntepechoFigura G Requisitos DE Tamaño DE LOS Huecos Seccion V Instalacion DE LA ArmazonInstalaciones a Traves DE LA Pared Construccion Para Paredes MAS GruesasConstruccion EN Paredes DE Ladrillo Figura L Construccion EN EL Marco DE LA ParedFigura O Instalacion Tipica De la cubierta en la caja de empalme de conexión Instalacion DEL ChasisFigura Q Friedrich AIR Conditioning CO. INC Page Manuel ’UTILISATION Garantie Instructions D’INSTALLATIONInstructions D’UTILISATION ET D’ENTRETIEN ChapitreNettoyer le filtre fréquemment consulter lentretien général Chapitre 3 Dépannage Chapitre 2 Renseignements SUR LE FiltrePage Chapitre 6 Exclusivité Commande DE TempératureSection I Alimentation Électrique Instructions D’INSTALLATIONDétail DES Accessoires Référence N Branchement DU Châssis ET Préparation Déballage DE L’APPAREILAvanta P R È S Préparation DE L’ENVELOPPEInstallation Dans UNE Fenêtre À Guillotine Section V Installation DE L’ENVELOPPEInstallation Typique DE LA Plaque DE Seuil Coupe a a Dimensions Finies DE L’OUVERTURE Section V Installation DE LenveloppeInstallation À Travers UN MUR Figure L Construction Avec UN Cadre EN Bois Figure O Installation Typique Étape Installation DU ChâssisDétail Garantie Limite DUN AN Climatiseurs Hazardgard Friedrich
Related manuals
Manual 56 pages 18.6 Kb

SH14, SH20 specifications

The Friedrich SH15 and SH20 models are exemplary representatives of advanced heating solutions, designed to address the diverse needs in residential and commercial environments. Engineered with a focus on efficiency, performance, and user-friendliness, these heating systems make a strong case for modern heating technology.

One of the standout features of both the SH15 and SH20 is their energy efficiency. These models utilize state-of-the-art heat pump technology, which allows them to extract heat from the environment even in colder temperatures. This results in significantly lower energy consumption compared to traditional heating systems, leading to reduced utility bills and a lower carbon footprint. The SH15 is designed for smaller spaces, while the SH20 offers a bit more power, making it suitable for larger areas or homes with greater heating demands.

Both models incorporate advanced inverter technology, which adjusts the compressor speed depending on the heating requirements. This ensures that the units operate at optimal efficiency, providing consistent temperature control while minimizing energy waste. Inverter-driven systems contribute to quieter operation as well, which is ideal for residential settings where noise can be a concern.

User-friendliness is another hallmark of the Friedrich SH15 and SH20. Equipped with intuitive digital controls, users can easily set their preferred temperatures and schedules, allowing for personalized comfort. Moreover, both models support smart home integration, enabling remote access and control through mobile applications. This feature not only enhances convenience but also allows users to monitor energy usage and make adjustments on the fly.

Durability is a key characteristic of these heating systems. Constructed with high-quality materials, the SH15 and SH20 are designed to withstand harsh environmental conditions, ensuring long-lasting performance. They also feature advanced air filtration systems that improve indoor air quality by effectively removing allergens and other pollutants.

In summary, the Friedrich SH15 and SH20 embody the cutting-edge of heating technology, offering powerful, efficient, and user-friendly solutions for diverse heating needs. With their advanced features, smart technology integration, and robust construction, these models are well-suited for modern living, ensuring comfortable and environmentally responsible heating year-round.