INSTALLATION | ||
| ||
|
|
|
Figure A.3
CONNECTION OF RANGER® 3 PHASE TO PREMISES WIRING
Return to
Return to
| 240 VOLT | |
240 Volt | POWER | |
120 VOLT | ||
60 Hz. | COMPANY | |
120 VOLT | ||
Service | ||
METER | ||
|
GROUNDED CONDUCTOR
NEUTRAL
BUS
N
LOAD
Return to Section TOC
Return to Section TOC
Return to Master TOC
Return to Master TOC
DOUBLE POLE DOUBLE THROW
SWITCH RATING TO BE THE SAME
AS OR GREATER THAN PREMISES
SERVICE OVERCURRENT
PROTECTION.
50 AMP, 120/240
VOLT PLUG240 VOLT NEMA TYPE
40AMP
240VOLT
DOUBLE
POLE
CIRCUIT
BREAKER
GND
N
PREMISES
DISCONNECT AND
SERVICE
GROUNDOVERCURRENT PROTECTION
Return to Section TOC
Return to Master TOC
50 AMP, 120/240 VOLT
RECEPTACLENOTE: No. 6 COPPER CONDUCTOR CABLE SEE NATIONAL ELECTRICAL CODE FOR ALTERNATE WIRE
SIZE RECOMMENDATIONS.
WARNING
Connection of RANGER® 3 PHASE to premises wiring must be done by a licensed electrician and must com- ply with the National Electrical Code and all other applicable electrical codes. See the Installation Section for important information about not using the 480V 3 Phase Receptacle for connection to Single Phase Premises Wiring.