ENGINE THROTTLE ADJUSTMENT TEST (continued)

FIGURE F.6 – BLOWER PADDLE MARKED FOR STROBE-TACH METHOD

Blower Paddle

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

TEST PROCEDURE

This test can be conducted by any one of four meth- ods.

Strobe-tach Method:

1.With the 5/16” nut driver, remove the 6 sheet metal screws from the case top.

2.Remove the rubber gasket (cover seal) from the lift bail.

3.Remove the fuel cap. The rubber gasket for the fill tube will come off with the case top.

4.Remove the case top, then replace the fuel cap.

5.Conduct this marking procedure with the gasoline engine OFF.

6.Remove the spark plug wires to prevent accidental engine kickback or starting.

7.With the black or red marking pencil, place a mark on one of the blower paddles. See Figure F.6 for location.

8.Connect the strobe-tach according the manufactur- er’s instructions.

9.Reconnect the spark plug wires and start the engine. Direct the strobe-tach light on the blower paddle and synchronize it to the rotating mark.

10.With the machine at HIGH IDLE the tach should read between 3700 and 3750 RPM.

With the machine at LOW IDLE the tach should read between 2150 and 2400 RPM.

11.If either of the readings is incorrect, adjust the throttle as follows:

Adjust HIGH IDLE: Use the 3/8” wrench to turn the spring-loaded adjustment nut. See Figure F.8 for location of the adjustment nut. Turn the nut clock- wise to increase HIGH IDLE speed. Adjust the speed until the tach reads between 3700 and 3750 RPM.

Adjust LOW IDLE: First make sure there is no load on the machine. Set the IDLE switch to AUTO and wait for the engine to change to low idle speed. Use the 3/8” wrench to adjust the solenoid nut, which changes the amount of throw in the throttle lever arm. See Figure F.8 for location of the adjust- ment nut. Adjust the nut until the tach reads between 2150 and 2400 RPM.

RANGER® 3 PHASE

Image 64
Contents Ranger 3 Phase Safety Ranger 3 PhaseFumes and Gases Welding Cutting Précautions DE Sûreté Safety Methods of Reducing Emissions Mains Supply Master Table of Contents for ALL Sections Table of Contents Installation Section Installation Technical Specifications Ranger 3 Phase K2337-1 & K2337-2Auxiliary Power Height Width Depth WeightSafety Precautions Machine GroundingSpark Arrester TowingPRE-OPERATION Service GasolineVehicle Mounting Can cause fire or explosionWelding Output Cables Total Combined Length of Electrode and Work CablesHigh Altitude Operation Angle of OperationInstructions Auxiliary Power Volt 3 Phase Receptacle with GroundGfci Duplex Receptacles 120/240 Volt Dual Voltage ReceptacleGround Wire Standby Power ConnectionsAuxiliary Power While Welding TABLE A.1 Simultaneous Welding and PowerConnection of Ranger 3 Phase to Premises Wiring Figure A.3USE These Devices with a Ranger 3 Phase Electrical Device USE with the Ranger 3 PhaseDevices Without Addi Tional Resistive Type Loads Table of Contents Operation Section Engine Switch OperationGENERAL DESCRIPTION Welder Controls Function and OperationPolarity Switch Ranger 3 Phase Approximate Fuel ConsumptionRange Switch Control DialWire Feed Welding Processes Constant Voltage Welding ProcessStick Constant Current Welding TIG Constant Current WeldingStick Auto STARTING/SHUTDOWN Instructions BREAK-IN PeriodStarting the Engine Stopping the EngineTable of Contents Accessories Section Accessories K1745-1 Welding GAS Cylinder LPG Tank HolderWIRE FEED RECOMMENDED EQUIPMENTStick TIGRanger 3 Phase Table of Contents Maintenance Section Maintenance Safety PrecautionsGfci Receptacle Testing and RESET- Ting Procedure AIR Cleaner and Other Maintenance Slip RingsOIL Filter Change Do not attempt to polish slip rings while engine is runningBattery Engine Maintenance Parts KOHLER C23SFram CA79 CHAMPION RC12YCMAINTENANCED-5 Figure D.1 Major Component LocationRanger 3 Phase 1TABLE of CONTENTS-THEORY of Operation Section E-1 General Description Theory of OperationEngine Components and Operation ROTOR, Stator & Control Circuits Figure E.2 ROTOR, Stator and Control CircuitsWeld Circuitry Figure E.2 Weld Circuitry1TABLE of Contents Troubleshooting and Repair F-1 Troubleshooting and Repair HOW to USE Troubleshooting GuidePC Board Troubleshooting Procedures Return to SectionDiagram Perform the Output Bridge Test Gram Wiring Wiring Diagram Troubleshooting and Repair Figure F.4 and/or the Wiring Test Description Rotor Voltage Test ProcedureMaterials Needed Test Procedure Rotor Voltage TestRotor Resistance Test TEST PROCEDURE Figure F.2 Slip RingsAuxiliary and Field Winding Test To test the 480 VAC 3 Phase winding Probes ReadingAuxiliary Windings To test the 120 VAC windingFigure F.4 Control PC Board Field WindingRanger 3 Phase Output Rectifier Bridge Test Figure F.5 OUTPUT RECTIFIER + Meter Lead Meter ReadingToroid Test Toroid Test Charging Circuit Test Voltage Regulator AC Lead DC Lead Engine Throttle Adjustment Test Engine Throttle Adjustment Test Low Idle Adjustment SolenoidNut Housing Figure F.9 115VAC Supply Waveform High IDLE- no Load Normal Open Circuit Voltage Waveform 115 VAC Supply Scope SettingsHigh Idle no Load Output Control AT Maximum Typical DC Weld Output Waveform CV Mode Machine LoadedTypical DC Weld Output Waveform CC Mode Machine Loaded to 200 Amps AT 26 VDCTypical AC Weld Output Waveform Machine Loaded to 225 Amps AT 25 VDCAbnormal Open Circuit Weld Voltage Waveform CV Mode Abnormal Open Circuit DC Weld Voltage Waveform Normal Open Circuit Weld Voltage Waveform CV Mode Normal Open Circuit DC Weld Voltage Waveform CC Mode Normal Open Circuit AC Weld Voltage Waveform Ranger 3 Phase Brush Removal and Replacement Procedure Brush Removal and Replacement Procedure ProcedureBrush Assembly Bracket Bolts Ranger 3 Phase Printed Circuit Board Removal Replacement Procedure Printed Circuit Board Removal Figure F.10 Door RemovalOutput Rectifier Bridge Removal Replacement Procedure Output Rectifier Bridge Removal Figure F.11 OUTPUT RECTIFIERENGINE/ROTOR Removal and Replacement Procedure ENGINE/ROTOR Removal and Replacement Procedure Procedure Rotor Removal Procedure Figure F.13 Engine and Rotor Removed from StatorReassembly Procedure Retest After Repair Table of Contents Diagram Section Ranger 3-PHASE RaNGEr 3 phaSESchEmaTic cOmplETE machiNE l12259 L12259ElEcTrical DiaGramS