STARTING/SHUTDOWN INSTRUCTIONS

STARTING THE ENGINE

WARNING

Do not touch electrically live parts of electrode with skin or wet clothing.

Keep flammable material away.

Insulate yourself from work and ground. Wear eye, ear, and body protection.

• Keep your head out of the fumes.

• Use ventilation or exhaust to remove fumes from breathing zone.

Be sure all Pre-Operation Maintenance has been per- formed. Also, read the Engine Owner’s Manual before starting for the first time.

Remove all loads connected to the AC power recepta- cles. Use the choke control as follows:

KOHLER ENGINE - Always pull the choke control out when starting the engine; cold, warm or hot.

Turn the engine switch to the “start” position and crank the engine until it starts. Release the switch as soon as the engine starts, slowly return the choke control to the full “in” position (choke open),

and turn the switch to the Auto Idle( / ) position. Do not turn the switch to the “start” position while the engine is running because this will cause damage to the ring gear and/or starter motor

After running at high engine speed for 10-14 seconds, the engine will go to low idle. Allow the engine to warm up by letting it run at low idle for a few minutes.

STOPPING THE ENGINE

Remove all welding and auxiliary power loads and allow engine to run at low idle speed for a few minutes to cool the engine.

Stop the engine by placing the Engine switch in the

“OFF” position.

A fuel shut off valve is not required on the RANGER® 3 PHASE because the fuel tank is mounted below the engine.

BREAK-IN PERIOD

It is normal for any engine to use a greater amount of oil until the break-in is accomplished. Check the oil level twice a day during the break-in period (approxi- mately 50 running hours).

IMPORTANT: IN ORDER TO ACCOMPLISH THIS- BREAK-IN, THE UNIT SHOULD BE SUBJECTED TO MODERATE LOADS, WITHIN THE RATING OF THE MACHINE. AVOID LONG IDLE RUNNING PERIODS. REMOVE LOADS AND ALLOW ENGINE TO COOL BEFORE SHUTDOWN.

The engine manufacturer’s recommendation for the running time until the first oil change is 5 Hours .

The oil filter is to be changed at the second oil change. Refer to the Engine Owner’s Manual for more informa- tion.

RANGER® 3 PHASE

Image 24
Contents Ranger 3 Phase Safety Ranger 3 PhaseFumes and Gases Welding Cutting Précautions DE Sûreté Safety Methods of Reducing Emissions Mains Supply Master Table of Contents for ALL Sections Table of Contents Installation Section Installation Technical Specifications Ranger 3 Phase K2337-1 & K2337-2Auxiliary Power Height Width Depth WeightSafety Precautions Machine GroundingSpark Arrester TowingPRE-OPERATION Service GasolineVehicle Mounting Can cause fire or explosionWelding Output Cables Total Combined Length of Electrode and Work CablesHigh Altitude Operation Angle of OperationInstructions Auxiliary Power Volt 3 Phase Receptacle with GroundGfci Duplex Receptacles 120/240 Volt Dual Voltage ReceptacleGround Wire Standby Power ConnectionsAuxiliary Power While Welding TABLE A.1 Simultaneous Welding and PowerConnection of Ranger 3 Phase to Premises Wiring Figure A.3Electrical Device USE with the Ranger 3 Phase USE These Devices with a Ranger 3 PhaseDevices Without Addi Tional Resistive Type Loads Table of Contents Operation Section Engine Switch OperationGENERAL DESCRIPTION Welder Controls Function and OperationPolarity Switch Ranger 3 Phase Approximate Fuel ConsumptionRange Switch Control DialWire Feed Welding Processes Constant Voltage Welding ProcessStick Constant Current Welding TIG Constant Current WeldingStick Auto STARTING/SHUTDOWN Instructions BREAK-IN PeriodStarting the Engine Stopping the EngineTable of Contents Accessories Section Accessories K1745-1 Welding GAS Cylinder LPG Tank HolderWIRE FEED RECOMMENDED EQUIPMENTStick TIGRanger 3 Phase Table of Contents Maintenance Section Maintenance Safety PrecautionsGfci Receptacle Testing and RESET- Ting Procedure AIR Cleaner and Other Maintenance Slip RingsOIL Filter Change Do not attempt to polish slip rings while engine is runningBattery Engine Maintenance Parts KOHLER C23SFram CA79 CHAMPION RC12YCMAINTENANCED-5 Figure D.1 Major Component LocationRanger 3 Phase 1TABLE of CONTENTS-THEORY of Operation Section E-1 Theory of Operation General DescriptionEngine Components and Operation ROTOR, Stator & Control Circuits Figure E.2 ROTOR, Stator and Control CircuitsWeld Circuitry Figure E.2 Weld Circuitry1TABLE of Contents Troubleshooting and Repair F-1 Troubleshooting and Repair HOW to USE Troubleshooting GuidePC Board Troubleshooting Procedures Return to SectionDiagram Perform the Output Bridge Test Gram Wiring Wiring Diagram Troubleshooting and Repair Figure F.4 and/or the Wiring Rotor Voltage Test Procedure Test DescriptionMaterials Needed Test Procedure Rotor Voltage TestRotor Resistance Test TEST PROCEDURE Figure F.2 Slip RingsAuxiliary and Field Winding Test To test the 480 VAC 3 Phase winding Probes ReadingAuxiliary Windings To test the 120 VAC windingFigure F.4 Control PC Board Field WindingRanger 3 Phase Output Rectifier Bridge Test Figure F.5 OUTPUT RECTIFIER + Meter Lead Meter ReadingToroid Test Toroid Test Charging Circuit Test Voltage Regulator AC Lead DC Lead Engine Throttle Adjustment Test Engine Throttle Adjustment Test Low Idle Adjustment SolenoidNut Housing Figure F.9 115VAC Supply Waveform High IDLE- no Load Scope Settings Normal Open Circuit Voltage Waveform 115 VAC SupplyHigh Idle no Load Output Control AT Maximum Typical DC Weld Output Waveform CV Mode Machine LoadedTypical DC Weld Output Waveform CC Mode Machine Loaded to 200 Amps AT 26 VDCTypical AC Weld Output Waveform Machine Loaded to 225 Amps AT 25 VDCAbnormal Open Circuit Weld Voltage Waveform CV Mode Abnormal Open Circuit DC Weld Voltage Waveform Normal Open Circuit Weld Voltage Waveform CV Mode Normal Open Circuit DC Weld Voltage Waveform CC Mode Normal Open Circuit AC Weld Voltage Waveform Ranger 3 Phase Brush Removal and Replacement Procedure Brush Removal and Replacement Procedure ProcedureBrush Assembly Bracket Bolts Ranger 3 Phase Printed Circuit Board Removal Replacement Procedure Printed Circuit Board Removal Figure F.10 Door RemovalOutput Rectifier Bridge Removal Replacement Procedure Output Rectifier Bridge Removal Figure F.11 OUTPUT RECTIFIERENGINE/ROTOR Removal and Replacement Procedure ENGINE/ROTOR Removal and Replacement Procedure Procedure Rotor Removal Procedure Figure F.13 Engine and Rotor Removed from StatorReassembly Procedure Retest After Repair Table of Contents Diagram Section Ranger 3-PHASE RaNGEr 3 phaSESchEmaTic cOmplETE machiNE l12259 L12259ElEcTrical DiaGramS