Southbend SB1001 owner manual Grounding Requirements, Extension Cords

Page 17

For Machines Mfg. Since 8/11

P R E P A R A T I O N

Model SB1001 8KLathe

Grounding Requirements

This machine must be grounded! In the event of certain types of malfunctions or breakdowns, grounding provides a path of least resistance for electric current in order to reduce the risk of electric shock.

This machine is equipped with a power cord that has an equipment-grounding wire and a grounding plug (see Figure 5). The plug must only be inserted into a matching receptacle (outlet) that is properly installed and grounded in accordance with all local codes and ordinances.

GROUNDED

5-15 RECEPTACLE

Grounding Prong

5-15 PLUG

Current Carrying Prongs

Figure 5. Typical 5-15 plug and receptacle.

SHOCK HAZARD!

Two-prong outlets do not meet the grounding requirements for this machine. Do not modify or use an adapter on the plug provided—if it will not fit the outlet, have an electrician or qualified service personnel install the proper outlet with a verified ground.

Extension Cords

We do not recommend using an extension cord with this machine. If you must use an extension cord, only use it if absolutely necessary and only on a temporary basis.

Extension cords cause voltage drop, which may damage electrical components and shorten motor life. Voltage drop increases as the extension cord size gets longer and the wire gauge size gets smaller (higher gauge numbers indicate smaller sizes).

Any extension cord used with this machine must contain a ground wire, match the required plug and receptacle, and meet the following requirements:

Minimum Gauge Size............................14 AWG

Maximum Length (Shorter is Better) ....50 ft.

-15-

Image 17
Contents Variable Speed Lathe Customer Service UpdatesScope of Manual Manual FeedbackTable of Contents Adjusting Drive Belts 8K Lathe About This MachineForeword Identification Control Panel Master Power SwitchBasic Controls Components Carriage components Carriage Tailstock#$ % 704040%2 140 +70 Understanding Risks of Machinery Basic Machine SafetyF E T Y Additional Metal Lathe Safety Additional Chuck Safety For Cleaning & Assembly Required for SetupPreparation Overview Typical preparation process is as followsAvailability Power Supply RequirementsFull-Load Current Rating Circuit RequirementsExtension Cords Grounding RequirementsInventory UnpackingBasic steps for removing rust preventative Cleaning & ProtectingBefore cleaning, gather the following Location Leveling Leveling & MountingMounting Machine Base Work benchConnecting Power Power ConnectionDisconnecting Power Lubricating LatheTo test run your machine Test RunEngaged Factory adjustments that should be verified Recommended AdjustmentsSpindle Break-In To perform the spindle break-inOperation Overview To install the chuck Chuck InstallationCorrect To remove the chuck Chuck RemovalScroll Chuck Clamping Mounting Workpiece Jaw ChuckTo mount a non-concentric workpiece to the faceplate FaceplateInstalling Tooling Using QuillTo install tooling in the tailstock TailstockAligning Tailstock to Spindle Centerline Offsetting TailstockTo offset the tailstock To align the tailstock to the spindle centerlineLooking down from above Move tailstock toward Live Centers CentersDead Centers Mounting Center in Tailstock Mounting Center in SpindleRemoving Center from Spindle To mount a center in the tailstockMounting Workpiece Between Centers Carriage & Slide LocksTo install a tool in the tool post Installing ToolCompound Rest Four-Way Tool PostTo align the cutting tool with the tailstock Aligning Cutting Tool with Spindle CenterlineCenter Top ViewSpindle Speed Manual FeedTools Needed Qty Selecting Spindle Speed RangeTo Change the Drive Belt Position Selecting Spindle Speed Power Feed Threading SetupTiming Belts & Pulleys Pulley DeflectionSetting Power Feed Rate of 0.0041/rev Setting Power Feed RateSetting Thread Pitch of 12 TPI Setting Threading ControlsThread Dial 16 B12, 20, or 28 TPI Thread Dial Chart10, 14, or 18 TPI 16, 24, or 32 TPITo change the position of the feed direction gears Changing Feed DirectionSB1470-Steady Rest for SB1001 SB1471-Follow Rest for SB1001 AccessoriesSB1281-MT#2 High-Performance Live Center Set SB1354-South Bend Cast-Iron Workbench Legs, 1 Pair SB1245-MT#2 Bull Nose CenterSB1391-D1-3 Back Plate Daily, After Operations Maintenance ScheduleOngoing Daily, Before OperationsOil Gun LubricationSpindle Bearings To lubricate the feed direction gears Feed Direction GearsLongitudinal Leadscrew Grease FittingsBedways & Slides Jaw ChuckMachine Storage Leadscrew End Play AdjustmentTo prepare the lathe for storage To remove leadscrew end playSaddle Gib Gib AdjustmentTo adjust the saddle gib Cross Slide & Compound Rest Gibs Adjusting Drive BeltsTo adjust the drive belts Pulley Deflection Trou B Leshooti NG Trou B Leshooti NG Wiring Diagram Color KEY Electrical Safety InstructionsA12-30-10 To ON/OFF Electrical Cabinet Wiring DiagramDescription HeadstockBed & Timing-Belt Bed & Timing-Belt Pulleys Parts List Saddle & Cross Slide Tool Post Lever Compound Rest & Tool PostApron Quill Electrical & End Cover 723 701 728 Door Closed Label LabelsPage Page Warranty #TS14279