Southbend SB1001 owner manual Jaw Chuck, Bedways & Slides

Page 54

Model SB1001 8KLathe

S E R V I C E

For Machines Mfg. Since 8/11

3-Jaw Chuck

Oil Type ...... Mobil Vactra 2 or ISO 68 Equivalent

Lubrication Device

Pump-Type Oil Gun

Oil Amount

As Needed

Lubrication Frequency

Daily

Proper lubrication of the chuck ball oiler (see Figure 86) is done with a pump-type oil gun that has a plastic or rubberized cone tip. We do not recommend using metal needle or lance tips as they can push the ball too far into the oiler, break the spring seat, and lodge the ball into the oil galley.

Ball

Oiler

Figure 86. Chuck ball oiler.

Push the rubber or plastic tip of the oil can nozzle against the ball oiler to create a hydraulic seal, then pump the oil can once or twice. If you see sludge and contaminants coming out of the lubrication area, keep pumping the oil gun until clean oil runs out. When finished, wipe away any excess oil.

Use the chuck key to rotate the chuck scroll gear several times to distribute the oil.

Bedways & Slides

Oil Type ...... Mobil Vactra 2 or ISO 68 Equivalent

Oil Amount

As Needed

Lubrication Frequency

Daily

Move the carriage, cross slide, and compound rest (see Figure 87) to reach all surfaces, and pay special attention to the dovetail ways of the slides. Apply a thin coat of oil to them with a lightly-oiled shop rag to prevent rust and corrosion, and to ensure smooth operation.

Cross

Slide

Compound

Rest

Bedway

Figure 87. Bedway and slides.

-52-

Image 54
Contents Variable Speed Lathe Scope of Manual UpdatesCustomer Service Manual FeedbackTable of Contents Adjusting Drive Belts About This Machine Foreword8K Lathe Identification Master Power Switch Basic Controls ComponentsControl Panel Carriage Tailstock Carriage components#$ % 704040%2 140 +70 Basic Machine Safety Understanding Risks of MachineryF E T Y Additional Metal Lathe Safety Additional Chuck Safety Preparation Overview Required for SetupFor Cleaning & Assembly Typical preparation process is as followsFull-Load Current Rating Power Supply RequirementsAvailability Circuit RequirementsGrounding Requirements Extension CordsUnpacking InventoryCleaning & Protecting Before cleaning, gather the followingBasic steps for removing rust preventative Location Mounting Leveling & MountingLeveling Machine Base Work benchDisconnecting Power Power ConnectionConnecting Power Lubricating LatheTest Run To test run your machineEngaged Spindle Break-In Recommended AdjustmentsFactory adjustments that should be verified To perform the spindle break-inOperation Overview Chuck Installation To install the chuckCorrect Chuck Removal Scroll Chuck ClampingTo remove the chuck Jaw Chuck Mounting WorkpieceFaceplate To mount a non-concentric workpiece to the faceplateTo install tooling in the tailstock Using QuillInstalling Tooling TailstockTo offset the tailstock Offsetting TailstockAligning Tailstock to Spindle Centerline To align the tailstock to the spindle centerlineLooking down from above Move tailstock toward Centers Dead CentersLive Centers Removing Center from Spindle Mounting Center in SpindleMounting Center in Tailstock To mount a center in the tailstockCarriage & Slide Locks Mounting Workpiece Between CentersCompound Rest Installing ToolTo install a tool in the tool post Four-Way Tool PostCenter Aligning Cutting Tool with Spindle CenterlineTo align the cutting tool with the tailstock Top ViewManual Feed Spindle SpeedSelecting Spindle Speed Range To Change the Drive Belt PositionTools Needed Qty Timing Belts & Pulleys Power Feed Threading SetupSelecting Spindle Speed Pulley DeflectionSetting Power Feed Rate Setting Power Feed Rate of 0.0041/revSetting Threading Controls Setting Thread Pitch of 12 TPI16 B Thread Dial10, 14, or 18 TPI Thread Dial Chart12, 20, or 28 TPI 16, 24, or 32 TPIChanging Feed Direction To change the position of the feed direction gearsAccessories SB1281-MT#2 High-Performance Live Center SetSB1470-Steady Rest for SB1001 SB1471-Follow Rest for SB1001 SB1245-MT#2 Bull Nose Center SB1391-D1-3 Back PlateSB1354-South Bend Cast-Iron Workbench Legs, 1 Pair Ongoing Maintenance ScheduleDaily, After Operations Daily, Before OperationsLubrication Spindle BearingsOil Gun Feed Direction Gears To lubricate the feed direction gearsGrease Fittings Longitudinal LeadscrewJaw Chuck Bedways & SlidesTo prepare the lathe for storage Leadscrew End Play AdjustmentMachine Storage To remove leadscrew end playGib Adjustment To adjust the saddle gibSaddle Gib Adjusting Drive Belts To adjust the drive beltsCross Slide & Compound Rest Gibs Pulley Deflection Trou B Leshooti NG Trou B Leshooti NG Electrical Safety Instructions Wiring Diagram Color KEYElectrical Cabinet Wiring Diagram A12-30-10 To ON/OFFHeadstock DescriptionBed & Timing-Belt Bed & Timing-Belt Pulleys Parts List Saddle & Cross Slide Compound Rest & Tool Post Tool Post LeverApron Quill Electrical & End Cover 723 701 728 Labels Door Closed LabelPage Page Warranty #TS14279