Southbend SB1001 owner manual Unpacking, Inventory

Page 18

Model SB1001 8KLathe

P R E P A R A T I O N

For Machines Mfg. Since 8/11

Unpacking

This item was carefully packaged to prevent damage during transport. If you discover any damage, please immediately call Customer Service at (360) 734-1540 for advice. You may need to file a freight claim, so save the containers and all packing materials for possible inspection by the carrier or its agent.

Inventory

 

Tool Box Inventory (Figures 6–7)

Qty

A.

Tool Box

1

B.

Timing-Belt Pulley 28T

1

C.

Timing-Belt Pulley 27T

1

D.

Timing-Belt Pulley 26T

1

A

B C D E F

L M

G H I J K

Figure 6. Toolbox and timing-belt pulleys.

N

OQ

E.

Timing-Belt Pulley 24T

1

F.

Timing-Belt Pulley 22T

1

G.

Timing-Belt Pulley 21T

1

H.

Timing-Belt Pulley 20T

1

I.

Timing-Belt Pulley 19T

1

J.

Timing-Belt Pulley 18T

1

Z

R

P

S

T

X

K.

Timing-Belt Pulley 16T

1

L.

Timing-Belt Pulley 38T

1

M.

Timing-Belt Pulley 32T

1

N.

Power Cord 16G 3C 72" M/F 5-15

1

O.

3-Jaw Chuck External Jaw Set

1

P.

Chuck Key

1

Q.

Wrench 13mm

1

R.

Combo Wrench 14 x 17mm

1

S.

Hex Wrench Set, 2, 3, 4, 5, 6, 8mm ......1 Each

T.

Tapered Spindle Sleeve MT#4.5–MT#3

1

U.

Dead Center MT#2

1

V.

Dead Center MT#3

1

W.

Grease Gun

1

X.

Rubber Mounting Gasket

1

Y.

Timing Belt 140XL

1

Z .

Timing Belt 160XL

1

AA. Fuses Time-Delay15A (T15L250V)

5

Installed & Not Shown

Qty

s

3-Jaw Chuck Assembly 4"

1

YW V U AA

Figure 7. Additional small items.

-16-

Image 18
Contents Variable Speed Lathe Scope of Manual UpdatesCustomer Service Manual FeedbackTable of Contents Adjusting Drive Belts About This Machine Foreword8K Lathe Identification Master Power Switch Basic Controls ComponentsControl Panel Carriage Tailstock Carriage components#$ % 704040%2 140 +70 Basic Machine Safety Understanding Risks of MachineryF E T Y Additional Metal Lathe Safety Additional Chuck Safety Preparation Overview Required for SetupFor Cleaning & Assembly Typical preparation process is as followsFull-Load Current Rating Power Supply RequirementsAvailability Circuit RequirementsGrounding Requirements Extension CordsUnpacking InventoryCleaning & Protecting Before cleaning, gather the followingBasic steps for removing rust preventative Location Mounting Leveling & MountingLeveling Machine Base Work benchDisconnecting Power Power ConnectionConnecting Power Lubricating LatheTest Run To test run your machineEngaged Spindle Break-In Recommended AdjustmentsFactory adjustments that should be verified To perform the spindle break-inOperation Overview Chuck Installation To install the chuckCorrect Chuck Removal Scroll Chuck ClampingTo remove the chuck Jaw Chuck Mounting WorkpieceFaceplate To mount a non-concentric workpiece to the faceplateTo install tooling in the tailstock Using QuillInstalling Tooling TailstockTo offset the tailstock Offsetting TailstockAligning Tailstock to Spindle Centerline To align the tailstock to the spindle centerlineLooking down from above Move tailstock toward Centers Dead CentersLive Centers Removing Center from Spindle Mounting Center in SpindleMounting Center in Tailstock To mount a center in the tailstockCarriage & Slide Locks Mounting Workpiece Between CentersCompound Rest Installing ToolTo install a tool in the tool post Four-Way Tool PostCenter Aligning Cutting Tool with Spindle CenterlineTo align the cutting tool with the tailstock Top ViewManual Feed Spindle SpeedSelecting Spindle Speed Range To Change the Drive Belt PositionTools Needed Qty Timing Belts & Pulleys Power Feed Threading SetupSelecting Spindle Speed Pulley DeflectionSetting Power Feed Rate Setting Power Feed Rate of 0.0041/revSetting Threading Controls Setting Thread Pitch of 12 TPI16 B Thread Dial10, 14, or 18 TPI Thread Dial Chart12, 20, or 28 TPI 16, 24, or 32 TPIChanging Feed Direction To change the position of the feed direction gearsAccessories SB1281-MT#2 High-Performance Live Center SetSB1470-Steady Rest for SB1001 SB1471-Follow Rest for SB1001 SB1245-MT#2 Bull Nose Center SB1391-D1-3 Back PlateSB1354-South Bend Cast-Iron Workbench Legs, 1 Pair Ongoing Maintenance ScheduleDaily, After Operations Daily, Before OperationsLubrication Spindle BearingsOil Gun Feed Direction Gears To lubricate the feed direction gearsGrease Fittings Longitudinal LeadscrewJaw Chuck Bedways & SlidesTo prepare the lathe for storage Leadscrew End Play AdjustmentMachine Storage To remove leadscrew end playGib Adjustment To adjust the saddle gibSaddle Gib Adjusting Drive Belts To adjust the drive beltsCross Slide & Compound Rest Gibs Pulley Deflection Trou B Leshooti NG Trou B Leshooti NG Electrical Safety Instructions Wiring Diagram Color KEYElectrical Cabinet Wiring Diagram A12-30-10 To ON/OFFHeadstock DescriptionBed & Timing-Belt Bed & Timing-Belt Pulleys Parts List Saddle & Cross Slide Compound Rest & Tool Post Tool Post LeverApron Quill Electrical & End Cover 723 701 728 Labels Door Closed LabelPage Page Warranty #TS14279