Operation
7.Reverse tip to UNCLOG position. Put prime/pres- sure relief valve DOWN to spray position and trigger sprayer through tip into waste area for 1- 2 seconds.
ti19370a ti19346a
ti19366a
8.Engage trigger lock and put prime/pressure relief valve UP to release pressure.
ti19347a
ti19350a
9.Remove material cup.
10.Disengage trigger lock, put prime/pressure relief valve DOWN to spray position, hold sprayer slightly above material cup and pull trigger to discharge fluid from pump.
ti19403a
11.Put prime/pressure relief valve UP and pull trigger to finish flushing material.
ti19401a
12. Properly discard any material in cup.
Install/Service Filter (if needed)
1.Perform Pressure Relief Procedure, page 9.
2.Unthread front valve housing from sprayer.
ti19362a
3.Filter should come out of pump housing with valve. If filter remains in housing, remove it by hand or with pliers if necessary.
ti19342a
4. Install
ti19349a
5. Reassemble valve housing to pump.
ti19364a
3A2308C | 13 |