Carrier 48HJD005-007 START-UP CHECKLIST Remove and Store in Job File, I. Preliminary Information

Page 48
START-UP CHECKLIST

START-UP CHECKLIST

(Remove and Store in Job File)

I. PRELIMINARY INFORMATION

MODEL NO.:________________________________

SERIAL NO.: ________________________________________

DATE:______________________________________

TECHNICIAN: _______________________________________

 

BUILDING LOCATION: _______________________________

II.PRE-START-UP (insert checkmark in box as each item is completed)

VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT

REMOVE ALL SHIPPING HOLDDOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS

CHECK GAS PIPING FOR LEAKS

CHECK THAT RETURN INDOOR-AIR FILTER IS CLEAN AND IN PLACE

￿VERIFY THAT UNIT INSTALLATION IS LEVEL

CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS

III. START-UP

ELECTRICAL

 

 

 

 

 

SUPPLY VOLTAGE

L1-L2

 

L2-L3

 

L3-L1

COMPRESSOR AMPS

L1

 

L2

 

L3

INDOOR-FAN AMPS

L1

 

L2

 

L3

TEMPERATURES

 

 

 

 

 

 

 

 

OUTDOOR-AIR TEMPERATURE

 

 

DB

 

 

RETURN-AIR TEMPERATURE

 

 

DB

WB

COOLING SUPPLY AIR

 

 

 

 

 

 

 

 

GAS HEAT SUPPLY AIR

 

 

 

 

 

 

 

 

PRESSURES

 

 

 

 

 

 

 

 

GAS INLET PRESSURE

 

 

 

IN. WG

 

 

GAS MANIFOLD PRESSURE

 

 

 

IN. WG (HI FIRE)

REFRIGERANT SUCTION

 

 

 

PSIG

 

 

°F

REFRIGERANT DISCHARGE

 

 

 

PSIG

 

 

°F

￿VERIFY REFRIGERANT CHARGE USING CHARGING TABLES

VERIFY THAT 3-PHASE SCROLL COMPRESSOR ROTATING IN CORRECT DIRECTION

Copyright 2000 Carrier Corporation

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Book

1

4

PC 111

Catalog No. 534-767

Printed in U.S.A.

Form 48HJ-18SI

Pg CL-1

9-00

Replaces: 48HJ-17SI

Tab

1a

6a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - CUT ALONG DOTTED LINECUT ALONG DOTTED LINE

Image 48
Contents CONTENTS SAFETY CONSIDERATIONSINSTALLATION Step 1 - Provide Unit SupportFig. 1 - Roof Curb Details 1′-4″Fig. 2 - Unit Leveling Tolerances Fig. 3 - Condensate Drain PanStep 7 - Make Electrical Connections Table 1 - Physical Data Table 1 - Physical Data cont Fig. 5 - Base Unit Dimensions - 48HJ004-007 1/2″3/4″ Step 8 - Adjust Factory-Installed Options Fig. 7 - Gas Piping Guide With AccessoryThru-the-Curb Service Connections Fig. 6 - Flue Hood DetailsFig. 8 - Power Wiring Connections Fig. 10 - Field Control Wiring RacewayFig. 9 - Low-Voltage Connections With or Without Economizer Never operate a motor where a phase imbalance in supply volt age is greater than 2%. Use the following formula to determinethe percent of voltage imbalance Table 2C - 48HJ High-Static Motor Units Without Electrical Convenience Outlet Fig. 11 - Accessory Field-Installed Humidistat 208/230-V Unit ShownFig. 13 - Typical Access Panel Locations Fig. 15 - Durablade Economizer Installed in UnitFig. 16 - Horizontal Durablade Economizer Installation Fig. 14 - Outdoor-Air Hood DetailsWiring Harness Fig. 19A - Durablade Economizer Damper Minimum Position SettingFig. 19B - Durablade Economizer Minimum Position Damper Setting Fig. 20 - Outdoor-Air Thermostat Enthalpy Control InstallationRelief Damper Characteristics Fig. 24 - Typical Access Panel LocationsFig. 25 - Exhaust Air Hood Assembly Fig. 22 - Durablade Economizer BarometricFig. 28 - Rear EconoMi$er Flange Installation Fig. 26 - Outdoor-Air Hood AssemblyFig. 27 - Completed Hood Assembly Fig. 29 - EconoMi$er InstalledFig. 31 - EconoMi$er Sensor Wiring Fig. 33 - Typical Access Panel LocationsFig. 32 - Wiring Diagram for Power Exhaust System POWER EXHAUST SYSTEM HIGH VOLTAGEFig. 34 - Supply-Air Sensor Placement Table 4 - Default Potentiometer SettingsFig. 35 - EconoMi$er Control Adjustment Potentiometers Factory SettingsStep 9 - Adjust Evaporator-Fan Speed - Ad Fig. 38 - Evaporator-Fan Pulley AdjustmentFig. 37 - Belt-Drive Motor Mounting Table 5A - 48HJ Fan Rpm at Motor Pulley Setting With Standard Motor Table 6 - Evaporator-Fan Motor Data - Standard MotorTable 7 - Evaporator-Fan Motor Data - High-Static Motors Table 8 - Motor Nominal Horsepower Table 9 - Outdoor Sound Power Total UnitBels Table 12 - 48HJ005 Fan Performance - Vertical Discharge Units With Standard Motor Single-Phase Units 3-Phase UnitsTable 16 - 48HJ007 Fan Performance - Vertical Discharge Units With Standard Motor Table 18 - 48HJ004 Fan Performance - Horizontal Discharge Units With Standard Motor Table 20 - 48HJ005 Fan Performance - Horizontal Discharge Units With Standard Motor 3-Phase Units FIOP - Factory-Installed Option Table 26 - Economizer Static Pressure Drop in. wgTable 27 - FIOP MoistureMiser Dehumidification Package Static Pressure Drop in. wgPRE-START-UP START-UPHeating Operating SequenceTable 28 - Altitude Compensation When the supply-air temperature falls between 57 F and Fig. 39 - MoistureMiser Option Operation SERVICE LubricationFig. 40 - Cleaning Condenser Coil Fig. 41 - Propping Up Top Panel Fig. 42 - Separating Coil SectionsFig. 43 - Condenser-Fan Adjustment Fig. 44 - Cooling Charging Chart Standard 48HJ004Fig. 45 - Cooling Charging Chart Standard 48HJ005 Fig. 46 - Cooling Charging Chart Standard 48HJ006 Fig. 47 - Cooling Charging Chart Standard 48HJ007Fig. 48 - Cooling Charging Chart, 48HJ004 with Optional MoistureMiser Dehumidification Package Table 29 - LED Error Code Description Fig. 52 - Burner Section Details Fig. 53 - Burner Tray DetailsFig. 54 - Spark Gap Adjustment LOW HEAT 48HJE004, 48HJD005-007 - 72,000 BTUH INPUTMEDIUM AND HIGH HEAT 48HJE005-007, 48HJF004 - 115,000 BTUH INPUT 48HJF005-007 - 150,000 BTUH INPUTTROUBLESHOOTING Table 30 - LED Error Code Service AnalysisTable 31 - Heating Service Analysis Table 32 - Durablade Economizer Service AnalysisTable 34 - EconoMi$er Troubleshooting Table 33 - EconoMi$er Flash Code IdentificationCritical Table 35 - MoistureMiser Dehumidification Subcooler Service Analysis Table 36 - Cooling Service Analysis Compressor operates continuouslyFig. 55 - Typical Wiring Schematic and Component Arrangement 208/230 3-Phase Unit ShownLEGEND AND NOTES FOR FIG NOTES FOR FIGReplaces 48HJ-17SI Page START-UP CHECKLIST Remove and Store in Job File I. PRELIMINARY INFORMATIONII. PRE-START-UP insert checkmark in box as each item is completed III. START-UP