Carrier 48HJD005-007 specifications

Page 47
Image 47
Contents Step 1 - Provide Unit Support CONTENTSSAFETY CONSIDERATIONS INSTALLATION1′-4″ Fig. 1 - Roof Curb DetailsFig. 3 - Condensate Drain Pan Fig. 2 - Unit Leveling TolerancesStep 7 - Make Electrical Connections Table 1 - Physical Data Table 1 - Physical Data cont 3/4″ Fig. 5 - Base Unit Dimensions - 48HJ004-0071/2″ Fig. 6 - Flue Hood Details Step 8 - Adjust Factory-Installed OptionsFig. 7 - Gas Piping Guide With Accessory Thru-the-Curb Service ConnectionsFig. 9 - Low-Voltage Connections With or Without Economizer Fig. 8 - Power Wiring ConnectionsFig. 10 - Field Control Wiring Raceway the percent of voltage imbalance Never operate a motor where a phase imbalance in supply voltage is greater than 2%. Use the following formula to determine Table 2C - 48HJ High-Static Motor Units Without Electrical Convenience Outlet 208/230-V Unit Shown Fig. 11 - Accessory Field-Installed HumidistatFig. 14 - Outdoor-Air Hood Details Fig. 13 - Typical Access Panel LocationsFig. 15 - Durablade Economizer Installed in Unit Fig. 16 - Horizontal Durablade Economizer InstallationFig. 20 - Outdoor-Air Thermostat Enthalpy Control Installation Wiring HarnessFig. 19A - Durablade Economizer Damper Minimum Position Setting Fig. 19B - Durablade Economizer Minimum Position Damper SettingFig. 22 - Durablade Economizer Barometric Relief Damper CharacteristicsFig. 24 - Typical Access Panel Locations Fig. 25 - Exhaust Air Hood AssemblyFig. 29 - EconoMi$er Installed Fig. 28 - Rear EconoMi$er Flange InstallationFig. 26 - Outdoor-Air Hood Assembly Fig. 27 - Completed Hood AssemblyPOWER EXHAUST SYSTEM HIGH VOLTAGE Fig. 31 - EconoMi$er Sensor WiringFig. 33 - Typical Access Panel Locations Fig. 32 - Wiring Diagram for Power Exhaust SystemPotentiometers Factory Settings Fig. 34 - Supply-Air Sensor PlacementTable 4 - Default Potentiometer Settings Fig. 35 - EconoMi$er Control AdjustmentFig. 37 - Belt-Drive Motor Mounting Step 9 - Adjust Evaporator-Fan Speed - AdFig. 38 - Evaporator-Fan Pulley Adjustment Table 7 - Evaporator-Fan Motor Data - High-Static Motors Table 5A - 48HJ Fan Rpm at Motor Pulley Setting With Standard MotorTable 6 - Evaporator-Fan Motor Data - Standard Motor Bels Table 8 - Motor Nominal HorsepowerTable 9 - Outdoor Sound Power Total Unit Table 12 - 48HJ005 Fan Performance - Vertical Discharge Units With Standard Motor 3-Phase Units Single-Phase UnitsTable 16 - 48HJ007 Fan Performance - Vertical Discharge Units With Standard Motor Table 18 - 48HJ004 Fan Performance - Horizontal Discharge Units With Standard Motor Table 20 - 48HJ005 Fan Performance - Horizontal Discharge Units With Standard Motor 3-Phase Units Package Static Pressure Drop in. wg FIOP - Factory-Installed OptionTable 26 - Economizer Static Pressure Drop in. wg Table 27 - FIOP MoistureMiser DehumidificationSTART-UP PRE-START-UPTable 28 - Altitude Compensation HeatingOperating Sequence When the supply-air temperature falls between 57 F and Fig. 39 - MoistureMiser Option Operation Fig. 42 - Separating Coil Sections SERVICELubrication Fig. 40 - Cleaning Condenser Coil Fig. 41 - Propping Up Top PanelFig. 45 - Cooling Charging Chart Standard 48HJ005 Fig. 43 - Condenser-Fan AdjustmentFig. 44 - Cooling Charging Chart Standard 48HJ004 Fig. 47 - Cooling Charging Chart Standard 48HJ007 Fig. 46 - Cooling Charging Chart Standard 48HJ006Fig. 48 - Cooling Charging Chart, 48HJ004 with Optional MoistureMiser Dehumidification Package Fig. 52 - Burner Section Details Fig. 53 - Burner Tray Details Table 29 - LED Error Code Description48HJF005-007 - 150,000 BTUH INPUT Fig. 54 - Spark Gap AdjustmentLOW HEAT 48HJE004, 48HJD005-007 - 72,000 BTUH INPUT MEDIUM AND HIGH HEAT 48HJE005-007, 48HJF004 - 115,000 BTUH INPUTTable 30 - LED Error Code Service Analysis TROUBLESHOOTINGTable 32 - Durablade Economizer Service Analysis Table 31 - Heating Service AnalysisCritical Table 34 - EconoMi$er TroubleshootingTable 33 - EconoMi$er Flash Code Identification Table 35 - MoistureMiser Dehumidification Subcooler Service Analysis Compressor operates continuously Table 36 - Cooling Service Analysis208/230 3-Phase Unit Shown Fig. 55 - Typical Wiring Schematic and Component ArrangementNOTES FOR FIG LEGEND AND NOTES FOR FIGReplaces 48HJ-17SI Page III. START-UP START-UP CHECKLIST Remove and Store in Job FileI. PRELIMINARY INFORMATION II. PRE-START-UP insert checkmark in box as each item is completed