HP Performance Optimized Data Center (POD) 20cp manual POD heating procedure

Page 72

The EPO system is set to Armed (White) or Bypass (Green).

Site chilled water

1.Open the POD supply chilled water isolation valve.

2.If necessary, vent the air from the chilled water return header.

3.Open the POD return chilled water isolation valve.

4.Verify audible flow noises are present.

IMPORTANT: To allow the POD ambient temperature to be raised in a controlled manner, open the chilled water supply and return isolation valves to enable 454.25 lpm (120 gpm*) at a temperature of 13ºC to 24ºC (55ºF to 75ºF) to flow through the heat exchangers and allow the circulation fans to bring the ambient temperature to >10ºC (50ºF).

Portable heaters can be used to disperse supplemental heat uniformly throughout the POD.

Electric portable heaters must be powered from an outside source.

*Measurement is in US gallons per minute.

POD heating procedure

1.On the ECS touchscreen, verify that all system components are operational (green) and no alarm conditions exist.

2.On the ECS touchscreen, verify that the POD chilled water flow rate is established on the flow rate indicator.

3.Take manual control of the fans to the preferred speed to circulate the warm air in the POD.

4.Determine the hot aisle temperature:

o If the hot aisle temperature is at or above -25ºC (13ºF), continue to the next step.

o If the hot aisle temperature is not at or above -25ºC (13ºF), continue monitoring the hot aisle temperature until it reaches -25ºC (13ºF) and continue this warm up procedure for 60 minutes before proceeding.

5.Record the cold aisle temperature that displays on the ECS. The recorded temperature is the starting temperature of the servers.

IMPORTANT: With non-operating servers, the temperature rate of change should not exceed 20ºC (68ºF) per hour. At higher elevations, the rate of change must be reduced by 1ºC (34ºF) for every 305 m (1,000 ft) above sea level.

6.When the cold aisle temperature reaches a minimum of 10ºC (50ºF), maintain the temperature for at least 60 minutes before proceeding.

CAUTION: Do not continue the start up procedures unless the fans are in AUTO mode.

7.Set all fans to AUTO mode.

POD operation

1.In the hot aisle, close the power drop box breakers for each rack and ensure that the IT equipment is operating.

2.In the cold aisle, monitor the flow control position, chilled water flow, and POD temperatures.

Power up procedure 72

Image 72
Contents Abstract Part Number March EditionPage Contents Fire protection system Humidifier Controlled access Networking Connection portals Demarcation box Fire boxPeriodic maintenance Sample HP POD 20c maintenance schedule Before you contact HP HP contact informationOperator safety Component safetyOverview Before you beginFire detection and suppression Environmental considerationsComponent identification Structural component identificationParts and part number identification Life safety component identification Internal life safety componentsEnd view shown Component Description Page Electrical power component identification Front view shown Component DescriptionMain breaker locations Component identification Front view shown Electrical safety label Description Electrical safety label Description Control cabinet component identification HP POD 20c racks Component DescriptionLife safety systems Life safety overviewEPO system ECS touchscreen and EPO indicators Battery backup during an EPO event Component Indicator Color DescriptionEPO modes EPO accidental activationVesda air sampling smoke detection system Optional Fire protection systemManual fire button Fire alarm indicators Fire suppression systemFire system operator panel Fire suppression sequence of operations Emergency egress Power, electrical, and controls Power safetySite electrical system GroundingLightning protection Power feeders Feature SpecificationCapacities Electrical and mechanical cooling capacitiesArc flash safety Power distribution electrical busway systemElectrical panels Wire color code Front view shown Feature SpecificationWiring system-Critical IT power feeds and main power feeds Panel schedulesWire color Label Description Electrical buswaysDrop boxes Power configurations Rack powerHP POD 20c lighting Using the ECS Environmental control systemEnvironmental control system overview Sensors Humidity sensorsPressure sensors Temperature sensors Environmental control system Connecting to the ECS Facility connections to ECSFacility chilled water sensors Configuring the ECS Managing the ECS from the HP POD 20cEnvironmental control system Logging in remotely to the ECS Enter ipconfig Locating the ECS IP addressesPassword protection Navigating the ECS interfaceLogging in to the ECS touchscreen Button DescriptionEnter your ECS password Click OK Overview screenInformation Description Basic System Configuration screen Status Overview screenCurrent temperature parameters appear on the related buttons Environmental control system Configuring the humidity alarm parameters Configuring the cold aisle temperature alarm parametersConfiguring the hot aisle temperature alarm parameters Configuring the differential pressure alarm parametersAdvanced System Configuration screen Setting the humidifier controlSetting the fan controls for each fan control zone Setting the start-up alarm reset delay Setting the logging configuration Calibrating the flowmeterCalibrating the differential pressure sensors Controller Settings screen Setting the switchboard serial numberSetting the HP POD 20c serial number Loading default settingsPI parameter ECS alarms Fan failureSafety and access control alarms Alarm Meaning SolutionWater supply temperature Cooling systemHP POD 20c cooling system theory of operation Water quality requirements and specifications Cooling system components Fans Condensation management DrainsHot aisle drains Cold aisle drainsLeak detection IT networking and communications NetworkingConnection portals Demarcation boxFire box Controlled access Optional componentsFire protection system HumidifierPower up procedure Standard HP POD 20c power up procedurePower up checklist Cold weather HP POD 20c power up procedure Standard power up procedureCold weather power up checklist POD heating procedure Power down procedure Specifications General HP POD 20c specificationsElectrical specifications Features SpecificationsRack specifications Environmental specificationsWater specifications Standard HP POD 20c racks AT978A Feature SpecificationFeature Specification Maintenance Periodic maintenanceSample HP POD 20c maintenance schedule Contacting HP Before you contact HPHP contact information Safety and IEC compliance Regulatory informationHP POD 20c regulatory compliance Safety and regulatory compliance Warranty informationGlossary Power distribution unit Programmable logic controllerPersonal protective equipment Enclosure of sufficient size to enable entry of personnel Uninterruptible power systemRack units Documentation feedback Environmental specifications EPO accidental activation IndexEPO panel Vesda