SECTION 6: VENTING

Vents and air intakes must be adequately supported so that the heater does not bear the weight of the pipes.

For vent termination See Page 13, Figure 6 through Page 16, Figure 11.

6.3.1Standard Vented Heaters (Models UHD[X][R] 75 - 125)

The vent must be fitted with a low resistance terminal. See Page 13, Figure 6 through Page 13, Figure 7. Standard vented heaters do not allow outdoor air intake for combustion air.

6.3.2Separated Combustion Heaters (Models UHD[X]S[R] 75 - 125)

The heaters are designed to be installed as separated combustion heaters. The vent and air intake are run as separate pipes to the wall or roof terminals. See Page 15, Figure 9. As an option, the vent and air intake are run as separate pipes to a concentric vent box and a concentric vent/air intake pipe penetrates the wall or roof. See Page 15, Figure 10 and See Page 16, Figure 11.

For separated combustion installation, the vent and air intake must be fitted with an individual and correctly sized sealed system and the vent and air intake must terminate at approved wall and roof terminals.

Separated combustion units may not be common vented. See Page 10, Section 6.

6.4 Unvented Operation

WARNING

Carbon Monoxide Hazard

Heaters may be installed vented or unvented.

Vented heaters must be vented outdoors.

Unvented heaters must be installed in buildings with ventilation rates as per section 6.4.

Failure to follow these instructions can result in death or injury.

This heater is not approved to be installed in residential buildings.

For unvented operation in commercial installations, sufficient building ventilation must be provided in the amount of 4 cfm per 1000 Btu/h firing rate (United

States); 3 cfm per 1000 Btu/h firing rate (Canada).

WARNING: Combustion by-products contain a chemical known to the State of California to cause cancer and birth defects or other reproductive harm.

6.5 Horizontal Venting

Horizontally vented heaters must be individually vented.

Vent pipe must be sloped ¼" (.6 cm) downward for every 1' (.3 m). For vent lengths greater than 5' (1.5 m), condensation will form. Insulation is recommended and condensation drains may be desired.

In noncombustible walls only, vent terminal (P/N 02537801-1P) may be used.

For 4'' (10 cm) vents in either combustible or noncombustible walls, use vent terminal (P/N 90502100) or equivalent insulated vent terminal. Follow the manufacturer's instructions for proper installation.

Instead of an insulated vent terminal, a listed thimble (with 2" (5 cm) air gap) may be used with a 4" (10 cm) vent cap (P/N 90502102).

6.6 Vertical Venting

Vertically-vented standard-vented heaters can be common vented (up to four heaters).

For vent lengths greater than 5' (1.5 m), condensation will form. Insulation is recommended and condensation drains may be desired. Venting through the top of the heater cabinet is not recommended if vent lengths are longer than

10' (3 m). In this case, vent from the rear of the heater cabinet then run the vent vertically and use a condensate drain at the bottom of the vertical vent. Vent pipe must be sloped 1/4'' (.6 cm) for every

1' (.3 m).

For 4'' (10 cm), an approved vent cap (P/N 90502102) must be used.

For 6'' (15 cm) common vent, an approved vent cap (P/N 90502103) must be used.

For common vertical venting of more than two heaters, See Page 14, Figure 8.

A vent shall not extend less than 2' (.6m) above the highest point where it passes through a flat roof of a building.

6.7 Length Requirements

If using vent lengths greater than 5' (1.5 m), condensation will form in the vent pipe. Insulation

11

Image 17
Contents Combat Page Roberts-Gordon LLC Page Table of Figures Page Manpower Requirements Heater SafetyCorrosive Chemicals Installer ResponsibilityNational Standards and Applicable Codes Wall TagCritical Considerations 3.1 Basic Information Minimum Required Installation ClearancesManufactured Units Clearances to CombustiblesElectrical Supply VentilationGas Supply VentNational Standards and Applicable Codes High Altitude Temperature Rise and Pressure Drop Ranges Duct Heater Installation 5.1 GeneralAir Flow and Temperature Rise Ranges Minimum Inlet Duct LengthWall Mounting Shelf Mounting and SuspensionShelf-Mounting Methods Venting Vent InstallationChanging Vent and Air Intake Orientation United States RequirementsSeparated Combustion Heaters Models Uhdxsr 75 Standard Vented Heaters Models Uhdxr 75Unvented Operation Horizontal VentingReplacing an Existing Heater in a Venting System Maximum Vent LengthsVent Material Vent and Roof Detail Standard Vented Heater Common Vertical Vent Termination Concentric Vent Box UHVK1 Unvented Installation Separated Combustion InstallationAIR Supply Building VentilationConnections GAS PipingPositioning Thermostats WiringLow Voltage Thermostat with One Heater L2 L1 Internal Wiring DiagramFlue Blower Transformer GAS Valve Flame Sensor Electrode Ladder Wiring DiagramElectrical Connection to the Heater Begin Start-Up Before Operating the Heater Operation and MaintenancePre-Start-Up Checks Electrical ChecksEND View Check Gas Rate Pressure SwitchTurning Off the Heater External ControlsUser Instructions User InstructionsHeater Operation Lighting Instructions 11.4.1 To Turn On HeaterTo Turn Heater Off Simple TroubleshootingSimple Troubleshooting Burner Faults Servicing Vicinity of the Heater Maintenance ChecklistVehicles and Other ObjectsGas Line and Shut-off When installed DuctworkValves Burner ObservationTroubleshooting 13.1 General Conduct start-up procedure as shown on Page 23, Section Troubleshooting For Automatic Ignition Burner SystemsTroubleshooting for Flame Supervision System Troubleshooting for Flue Blower Troubleshooting for Gas ValvesBurner Components Replacement PartsBurner Injectors Burner CompartmentIgnition Electrode and Flame Probe Top, remove the blower and mounting plate as above Flue Blower Vertical InstallationIgnition Control Limit Switches Removal and ReplacementTOP View Specifications 15.1 Dimension DataTechnical Data Table General Technical Data TablePage Roberts Gordon will not PAY for Warranty is Void ifRoberts-Gordon Limitations on Authority RepresentativesPage Owner Warranty Registration Card Page Page Clearances to Combustibles