UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL

9.3 Internal Wiring Diagram

L2 L1

FLUE

 

BLOWER

 

 

WHITE

 

GREEN

PRESSURE SWITCH

BLUE

 

 

BLUE

LIMIT SWITCH (UHD 300, 350, 400 ONLY)

ORANGE

 

 

ORANGE

MANUAL RESET LIMIT SWITCH (RESIDENTAL UNITS ONLY)

LIMIT SWITCH

SENSE

BLACK

 

ELECTRODE

BLACK

 

BLACK

24 VAC HOT

ORANGE

FLAME

WHITE

 

WHITE

BLACK

GREEN

 

GREEN

 

GAS VALVE

3

1

BLACK

TRANSFORMER

 

 

 

4

5

 

 

BLUE

 

YELLOW

 

 

 

 

 

YELLOW

 

 

 

 

 

 

BROWN

GROUND

 

 

 

 

 

6

5

4

 

 

 

 

3

2

1

 

 

 

 

 

 

 

R

 

R = 24 VAC TO THERMOSTAT (RED)

 

 

 

 

G

 

G = MANUAL FAN INPUT FROM THERMOSTAT (GREEN)

 

ORANGE

W

 

W = HEAT DEMAND INPUT FROM THERMOSTAT (WHITE)

 

 

 

 

C

 

C = COMMON GROUND TO THERMOSTAT

 

 

 

 

 

 

IGNITION MODULE

THERMOSTAT INPUT: FIELD SUPPLIED

BLACK

CMB BLOWER

ACC

L1

IMPORTANT:

For field wiring into service junction box, or if any of the original wire supplied with the heater

must be replaced, it must be replaced with wiring material having a temperature rating of at least 105 °C (221 °F) and 600 V. For supply connections, use No. 14 AWG or larger wires.

20

Image 26
Contents Combat Page Roberts-Gordon LLC Page Table of Figures Page Heater Safety Manpower RequirementsNational Standards and Applicable Codes Installer ResponsibilityCorrosive Chemicals Wall TagManufactured Units Minimum Required Installation ClearancesCritical Considerations 3.1 Basic Information Clearances to CombustiblesGas Supply VentilationElectrical Supply VentNational Standards and Applicable Codes High Altitude Air Flow and Temperature Rise Ranges Duct Heater Installation 5.1 GeneralTemperature Rise and Pressure Drop Ranges Minimum Inlet Duct LengthShelf Mounting and Suspension Wall MountingShelf-Mounting Methods Changing Vent and Air Intake Orientation Vent InstallationVenting United States RequirementsUnvented Operation Standard Vented Heaters Models Uhdxr 75Separated Combustion Heaters Models Uhdxsr 75 Horizontal VentingReplacing an Existing Heater in a Venting System Maximum Vent LengthsVent Material Vent and Roof Detail Standard Vented Heater Common Vertical Vent Termination Concentric Vent Box UHVK1 AIR Supply Separated Combustion InstallationUnvented Installation Building VentilationGAS Piping ConnectionsPositioning Thermostats WiringLow Voltage Thermostat with One Heater Internal Wiring Diagram L2 L1Ladder Wiring Diagram Flue Blower Transformer GAS Valve Flame Sensor ElectrodeElectrical Connection to the Heater Pre-Start-Up Checks Operation and MaintenanceBegin Start-Up Before Operating the Heater Electrical ChecksEND View Turning Off the Heater Pressure SwitchCheck Gas Rate External ControlsHeater Operation User InstructionsUser Instructions Lighting Instructions 11.4.1 To Turn On HeaterTo Turn Heater Off Simple TroubleshootingSimple Troubleshooting Burner Faults Servicing Vehicles and Other Maintenance ChecklistVicinity of the Heater ObjectsValves When installed DuctworkGas Line and Shut-off Burner ObservationTroubleshooting 13.1 General Troubleshooting For Automatic Ignition Burner Systems Conduct start-up procedure as shown on Page 23, SectionTroubleshooting for Flame Supervision System Troubleshooting for Gas Valves Troubleshooting for Flue BlowerReplacement Parts Burner ComponentsBurner Compartment Burner InjectorsIgnition Electrode and Flame Probe Flue Blower Vertical Installation Top, remove the blower and mounting plate as aboveLimit Switches Removal and Replacement Ignition ControlSpecifications 15.1 Dimension Data TOP ViewGeneral Technical Data Table Technical Data TablePage Roberts-Gordon Warranty is Void ifRoberts Gordon will not PAY for Limitations on Authority RepresentativesPage Owner Warranty Registration Card Page Page Clearances to Combustibles