Roberts Gorden UHD[X][S][R] 125, UHD[X][S][R] 75 Troubleshooting for Flame Supervision System

Page 39

SECTION 13: TROUBLESHOOTING

13.3 Troubleshooting for Flame Supervision System

To measure flame current, connect a 0 - 50 μA DC meter in series with the flame probe. If the meter reads negative values, then reverse the test leads.

START

Connect a DC ammeter in series with the flame probe.

Is the flame present and at least 1 μA DC flame current?

Yes

Is there a current flowing in the flame probe circuit with no flame present?

No

Does “lockout” occur when there is a flame present?

No

Heater Operating

TROUBLESHOOT ENDS.

 

Use General

 

 

No

Troubleshooting section to

 

 

 

trace the fault.

 

 

 

Is the connecting lead

 

Repair or replace as

Yes

damaged? Is the flame probe

Yes

required.

damaged or touching earthed

 

components?

 

 

 

Is inlet burner gas pressure

 

 

Yes

correct? Is live and neutral

Yes

Replace ignition control.

polarity correct? Is

 

 

 

 

flame probe circuit correct?

 

 

No

Repair or replace as

required.

If problems persist, contact

No

Roberts-Gordon LLC at

www.rg-inc.com

 

NOTE: Minimum flame probe current 1 μA DC. Typical flame probe current 3-5 μA DC.

33

Image 39
Contents Combat Page Roberts-Gordon LLC Page Table of Figures Page Manpower Requirements Heater SafetyWall Tag Installer ResponsibilityCorrosive Chemicals National Standards and Applicable CodesClearances to Combustibles Minimum Required Installation ClearancesCritical Considerations 3.1 Basic Information Manufactured UnitsVent VentilationElectrical Supply Gas SupplyNational Standards and Applicable Codes High Altitude Minimum Inlet Duct Length Duct Heater Installation 5.1 GeneralTemperature Rise and Pressure Drop Ranges Air Flow and Temperature Rise RangesWall Mounting Shelf Mounting and SuspensionShelf-Mounting Methods United States Requirements Vent InstallationVenting Changing Vent and Air Intake OrientationHorizontal Venting Standard Vented Heaters Models Uhdxr 75Separated Combustion Heaters Models Uhdxsr 75 Unvented OperationMaximum Vent Lengths Vent MaterialReplacing an Existing Heater in a Venting System Vent and Roof Detail Standard Vented Heater Common Vertical Vent Termination Concentric Vent Box UHVK1 Building Ventilation Separated Combustion InstallationUnvented Installation AIR SupplyConnections GAS PipingWiring Low Voltage Thermostat with One HeaterPositioning Thermostats L2 L1 Internal Wiring DiagramFlue Blower Transformer GAS Valve Flame Sensor Electrode Ladder Wiring DiagramElectrical Connection to the Heater Electrical Checks Operation and MaintenanceBegin Start-Up Before Operating the Heater Pre-Start-Up ChecksEND View External Controls Pressure SwitchCheck Gas Rate Turning Off the HeaterLighting Instructions 11.4.1 To Turn On Heater User InstructionsUser Instructions Heater OperationSimple Troubleshooting Simple Troubleshooting Burner FaultsTo Turn Heater Off Servicing Objects Maintenance ChecklistVicinity of the Heater Vehicles and OtherBurner Observation When installed DuctworkGas Line and Shut-off ValvesTroubleshooting 13.1 General Conduct start-up procedure as shown on Page 23, Section Troubleshooting For Automatic Ignition Burner SystemsTroubleshooting for Flame Supervision System Troubleshooting for Flue Blower Troubleshooting for Gas ValvesBurner Components Replacement PartsBurner Injectors Burner CompartmentIgnition Electrode and Flame Probe Top, remove the blower and mounting plate as above Flue Blower Vertical InstallationIgnition Control Limit Switches Removal and ReplacementTOP View Specifications 15.1 Dimension DataTechnical Data Table General Technical Data TablePage Limitations on Authority Representatives Warranty is Void ifRoberts Gordon will not PAY for Roberts-GordonPage Owner Warranty Registration Card Page Page Clearances to Combustibles