Roberts Gorden
UHD[X][S][R] 75, UHD[X][S][R] 125
service manual
Troubleshooting
Install
Internal Wiring Diagram
Wiring
Warranty
Maintenance
Replacement Parts
Safety
General Technical Data Table
Pressure Switch
Page 50
Page 49
Page 51
Image 50
Page 49
Page 51
Contents
Combat
Page
Roberts-Gordon LLC
Page
Table of Figures
Page
Heater Safety
Manpower Requirements
National Standards and Applicable Codes
Installer Responsibility
Corrosive Chemicals
Wall Tag
Manufactured Units
Minimum Required Installation Clearances
Critical Considerations 3.1 Basic Information
Clearances to Combustibles
Gas Supply
Ventilation
Electrical Supply
Vent
National Standards and Applicable Codes
High Altitude
Air Flow and Temperature Rise Ranges
Duct Heater Installation 5.1 General
Temperature Rise and Pressure Drop Ranges
Minimum Inlet Duct Length
Shelf Mounting and Suspension
Wall Mounting
Shelf-Mounting Methods
Changing Vent and Air Intake Orientation
Vent Installation
Venting
United States Requirements
Unvented Operation
Standard Vented Heaters Models Uhdxr 75
Separated Combustion Heaters Models Uhdxsr 75
Horizontal Venting
Replacing an Existing Heater in a Venting System
Maximum Vent Lengths
Vent Material
Vent and Roof Detail
Standard Vented Heater Common Vertical Vent Termination
Concentric Vent Box
UHVK1
AIR Supply
Separated Combustion Installation
Unvented Installation
Building Ventilation
GAS Piping
Connections
Positioning Thermostats
Wiring
Low Voltage Thermostat with One Heater
Internal Wiring Diagram
L2 L1
Ladder Wiring Diagram
Flue Blower Transformer GAS Valve Flame Sensor Electrode
Electrical Connection to the Heater
Pre-Start-Up Checks
Operation and Maintenance
Begin Start-Up Before Operating the Heater
Electrical Checks
END View
Turning Off the Heater
Pressure Switch
Check Gas Rate
External Controls
Heater Operation
User Instructions
User Instructions
Lighting Instructions 11.4.1 To Turn On Heater
To Turn Heater Off
Simple Troubleshooting
Simple Troubleshooting Burner Faults
Servicing
Vehicles and Other
Maintenance Checklist
Vicinity of the Heater
Objects
Valves
When installed Ductwork
Gas Line and Shut-off
Burner Observation
Troubleshooting 13.1 General
Troubleshooting For Automatic Ignition Burner Systems
Conduct start-up procedure as shown on Page 23, Section
Troubleshooting for Flame Supervision System
Troubleshooting for Gas Valves
Troubleshooting for Flue Blower
Replacement Parts
Burner Components
Burner Compartment
Burner Injectors
Ignition Electrode and Flame Probe
Flue Blower Vertical Installation
Top, remove the blower and mounting plate as above
Limit Switches Removal and Replacement
Ignition Control
Specifications 15.1 Dimension Data
TOP View
General Technical Data Table
Technical Data Table
Page
Roberts-Gordon
Warranty is Void if
Roberts Gordon will not PAY for
Limitations on Authority Representatives
Page
Owner Warranty Registration Card
Page
Page
Clearances to Combustibles
Related pages
Troubleshooting for Samsung BN59-00977A-00
Specifications for ASRock H61 Pro
HDD error code and status for Toshiba A65
Electrical Schematic Kawasaki for Hustler Turf 928168
HOW to Maintain for Eureka 7600 SERIES
Installazione della rete for Samsung AR12KSWSBWKNET
Parts List for Desa V36N-A
Language Code List for Panasonic PV-27DF4
Configuration Network for VBrick Systems VB6000
Warranty for Lumiscope 2216
Top
Page
Image
Contents