Roberts Gorden UHD[X][S][R] 75, UHD[X][S][R] 125 service manual END View

Page 30

UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL

Figure 13: Automatic Burner Control Sequence

Burner Sequence for Ignition Control

START

Thermostat 24 V

RUN

SHUT DOWN

Flue Blower

Pressure

 

Switch

C

 

Ignition Spark

Start Gas Valve

Flame Signal

 

30 Seconds Purge*

30 Seconds Post

P

NO

 

 

NC

ts = 10 Seconds

 

 

*Purge time begins at pressure switch change over.

Required Incoming Signals

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

If at any stage the flame fails, the control will retry

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Signals Output By Control

for ignition. The control has four trials for ignition

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

before a one hour lockout.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 14: Gas Valve

END VIEW

TOP VIEW

Regulator

½PSI C

IN

OFF

Gas Inlet

ON

Outlet

Pressure

Inlet Pressure

Description

Part Number

Gas Valve NG

90032505

Gas Valve LP

90032506

24

Image 30
Contents Combat Page Roberts-Gordon LLC Page Table of Figures Page Heater Safety Manpower RequirementsNational Standards and Applicable Codes Installer ResponsibilityCorrosive Chemicals Wall TagManufactured Units Minimum Required Installation ClearancesCritical Considerations 3.1 Basic Information Clearances to CombustiblesGas Supply VentilationElectrical Supply VentNational Standards and Applicable Codes High Altitude Air Flow and Temperature Rise Ranges Duct Heater Installation 5.1 GeneralTemperature Rise and Pressure Drop Ranges Minimum Inlet Duct LengthShelf Mounting and Suspension Wall MountingShelf-Mounting Methods Changing Vent and Air Intake Orientation Vent InstallationVenting United States RequirementsUnvented Operation Standard Vented Heaters Models Uhdxr 75Separated Combustion Heaters Models Uhdxsr 75 Horizontal VentingMaximum Vent Lengths Vent MaterialReplacing an Existing Heater in a Venting System Vent and Roof Detail Standard Vented Heater Common Vertical Vent Termination Concentric Vent Box UHVK1 AIR Supply Separated Combustion InstallationUnvented Installation Building VentilationGAS Piping ConnectionsWiring Low Voltage Thermostat with One HeaterPositioning Thermostats Internal Wiring Diagram L2 L1Ladder Wiring Diagram Flue Blower Transformer GAS Valve Flame Sensor ElectrodeElectrical Connection to the Heater Pre-Start-Up Checks Operation and MaintenanceBegin Start-Up Before Operating the Heater Electrical ChecksEND View Turning Off the Heater Pressure SwitchCheck Gas Rate External ControlsHeater Operation User InstructionsUser Instructions Lighting Instructions 11.4.1 To Turn On HeaterSimple Troubleshooting Simple Troubleshooting Burner FaultsTo Turn Heater Off Servicing Vehicles and Other Maintenance ChecklistVicinity of the Heater ObjectsValves When installed DuctworkGas Line and Shut-off Burner ObservationTroubleshooting 13.1 General Troubleshooting For Automatic Ignition Burner Systems Conduct start-up procedure as shown on Page 23, SectionTroubleshooting for Flame Supervision System Troubleshooting for Gas Valves Troubleshooting for Flue BlowerReplacement Parts Burner ComponentsBurner Compartment Burner InjectorsIgnition Electrode and Flame Probe Flue Blower Vertical Installation Top, remove the blower and mounting plate as aboveLimit Switches Removal and Replacement Ignition ControlSpecifications 15.1 Dimension Data TOP ViewGeneral Technical Data Table Technical Data TablePage Roberts-Gordon Warranty is Void ifRoberts Gordon will not PAY for Limitations on Authority RepresentativesPage Owner Warranty Registration Card Page Page Clearances to Combustibles