Lenox Elite Series XP16 Units Heat Pumps, P506640-01 Installing New Indoor Metering Device

Page 15

Installing New Indoor Metering Device

This outdoor unit is designed for use in HFC−410A systems that use a check / expansion valve metering device (purchased separately) at the indoor coil.

See the Lennox XP16 Engineering Handbook for approved check / expansion valve kit match−ups. The check / expansion valve device can be installed either internal or external to the indoor coil. In applications where an uncased coil is being installed in a field−provided plenum, install the check / expansion valve in a manner that will provide access for field servicing of the check / expansion valve (see figure 11).

INDOOR EXPANSION VALVE INSTALLATION

TWO PIECE

 

(Uncased Coil Shown)

 

PATCH PLATE

 

 

(UNCASED

 

 

 

STUB

 

 

COIL ONLY)

LIQUID LINE

CHECK /

 

END

 

 

 

ORIFICE

 

 

 

 

 

 

 

 

 

 

EXPANSION

 

 

 

HOUSING

 

DISTRIBUTOR

 

 

VALVE

 

 

 

 

 

 

TUBES

 

 

 

 

 

TEFLON®

 

 

 

 

 

 

 

 

 

 

 

 

RING

 

 

 

 

TEFLON®

 

SENSING

 

 

 

 

RING

 

 

 

 

 

 

LINE

 

 

 

 

 

 

DISTRIBUTOR

 

EQUALIZER

 

 

ASSEMBLY

 

 

LINE

 

 

 

 

 

 

 

LIQUID LINE

ARemove the field−provided fitting that temporarily reconnected the liquid line to the indoor unit’s distributor assembly.

BInstall one of the provided Teflon® rings around the stubbed end of the check / expansion valve and lightly

lubricate the connector threads and expose surface of the Teflon® ring with refrigerant oil.

CAttach the stubbed end of the expansion valve to the liquid line orifice housing. Finger tighten and use an appropriately sized wrench to turn an additional 1/2 turn clockwise as illustrated in the figure above, or 20 ft−lb.

DPlace the remaining Teflon® washer around the other end of the check / expansion valve. Lightly lubricate connector threads and expose surface of the Teflon® ring with refrigerant oil.

EAttach the liquid line assembly to the check / expansion valve. Finger tighten and use an appropriately sized wrench to turn an additional 1/2 turn clockwise as illustrated in the figure above or 20 ft−lb.

1/2 Turn

11 12

1

10

 

2

9

 

43

8 7

6

5

ASSEMBLY WITH

BRASS NUT

SENSING BULB INSTALLATION

MALE EQUALIZER LINE

VAPOR

FITTING (SEE

LINE

EQUALIZER LINE

 

INSTALLATION FOR

LIQUID LINE

FURTHER DETAILS)

 

Sensing bulb insulation is required if mounted external to the coil casing.

AAttach the vapor line sensing bulb in the proper orientation as illustrated to the right using the clamp and screws provided.

NOTE

and expansion bulb before insulating the sensing bulb once installed.

BConnect the equalizer line from the check / expansion valve to the equalizer vapor port on the vapor line. Finger tighten the flare nut plus 1/8 turn (7 ft−lbs) as illustrated below.

 

1/8 Turn

 

11 12

1

10

 

2

9

 

 

43

8

7

6

5

EQUALIZER LINE INSTALLATION

Remove and discard either the flare seal cap or flare nut with copper flare seal bonnet from the equalizer line port on the vapor line as illustrated in the figure to the right.

VAPOR LINE

ON LINES SMALLER THAN

7/8", MOUNT SENSING

 

BULB AT EITHER THE 3 OR

 

9 O’CLOCK POSITION.

 

12

BULB

BULB

FLARE SEAL CAP

OR

FLARE NUT

VAPOR LINE

 

 

 

 

 

ON 7/8" AND LARGER LINES,

 

 

MOUNT SENSING BULB AT

COPPER FLARE

 

EITHER THE 4 OR 8 O’CLOCK

SEAL BONNET

12

POSITION. NEVER MOUNT ON

 

BOTTOM OF LINE.

MALE BRASS EQUALIZER

BULB

BULB

LINE FITTING

 

 

 

VAPOR LINE

NOTE OM OF LINE.

Figure 11. Installing Indoor Check / Expansion Valve

Page 15

XP16 SERIES

Image 15
Contents Table of Contents Shipping and Packing ListGeneral XP16−024 Base Section XP16 Base with Legs Unit Dimensions − inches mmModel Number Identification Side ViewTypical Unit Parts Arrangement Caps and Fasteners Torque RequirementsDetail a To Access Service Port Operating Ball−Type Service Valve Operating Gauge Set and Service ValvesOperating Service Valves Using Manifold Gauge SETMethod Method 2 Limitations Recovering Refrigerant from Existing System1DISCONNECT Power 3RECOVERING RefrigerantNew Outdoor Unit Placement Placement, Slab Mounting and Stabilizing Unit Detail a Outside Unit PlacementRemoving and Installing Panels Louvered Panel InstallationLouvered Panel Removal Adding Polyol Ester OIL Requirements NEW or Replacement Line SET InstallationUsing Existing Line SET Line Set RequirementsRefrigerant Line SET Alling Horizontal Runs Refrigerant Line SET From Vertical to HorizontalBrazing Connections 1CUT and Debur Brazing Procedures7PREPARATION for Next Step Wrap Service ValvesFlow Nitrogen 6BRAZE Line SET2CONNECT Gauges and Equipment for Flushing Procedure Equalizer Line Installation Installing New Indoor Metering DeviceIndoor Expansion Valve Installation Sensing Bulb InstallationTest for Leaks S S S Evacuating Line Set and Indoor Coil24VAC Transformer Size Circuit and Install Disconnect2INSTALL Thermostat Electrical ConnectionsLOW Voltage Connections 4HIGH Voltage Power Supply ConnectionsTypical Field Wiring Typical Unit Wiring Diagram −024, −036 and −048 Only Typical Unit Wiring Diagram −060 Only Unit START−UP Unit Start−UpLeak CHECK, Repair and Evacuate Connect Manifold Gauge SET and Weigh in ChargeCalculating System Charge for Outdoor Unit Void of Charge Indoor Unit Connections for Optimizing System ChargeOptimizing Procedure Adjusting Indoor AirflowOptimizing System Refrigerant Charge SATº LIQºSCº = XP16−036−230 XP16−048−230XP16−060−230 Normal Operating Pressures Temperature PressuresUnit Components System Operation24VAC DelayDS2 Green LED FAN TWO Connectors TestOFF Demand Defrost Control A108 Diagnostic LedsDS2 DS1 SlowSECOND−STAGE Operation Defrost System Overview Defrost Control CONNECTIONS, Jumpers Settings and FeaturesDefrost System Emergency Heat Amber LightCompressor Delay Mode P5 Operational Mode OverviewDefrost Cycle Actuation HOW did Defrost TERMINATE? Demand Mode Thirty 30 Minute TimeTemperature Mode TIME/TEMPERATURE Mode DefrostDegrees Resistance Fahrenheit 136.3 2680 High Discharge Sensor RT28 Temperature / Resistance Range S S Test Pin P1 FunctionsTools Required MaintenanceProcedure Two−Stage Modulation Compressors ChecksHomeowner Pressures TemperatureCompressor Outdoor Unit FAN MotorCooling Mode XP16 Start−Up and PerformanceStart UP Checks