Raypak 1334001 operating instructions Vent Piping

Page 17

Vent Piping

WARNING: Indoor heaters require a drafthood that must be connected to a vent pipe and properly vented to the outside. Failure to follow this procedure can cause fire or fatal carbon monoxide poisoning.

10' OR LESS

2' MIN

VENT PIPE

VENT CAP

2' MIN

5' MIN

Vent piping of the same size as the drafthood outlet is recommended, however, when the total vent height is at least ten (10) feet (drafthood relief opening to vent terminal), the vent pipe size may be reduced as spec- ified in the National Fuel Gas Code, ANSI Z223.1.

Avoid long horizontal runs of vent pipe and too many elbows. If installation requires horizontal non-vertical runs, the vent pipe must have a minimum of 1/4 inch per foot rise and should be supported at not more than five foot intervals. Plumber's tape, crisscrossed, will serve to space both horizontal and vertical piping. Gas vents supported only by the flashing and extending above the roof more than five feet should be securely guyed or braced to withstand snow and wind loads. We recommend use of an insulated vent pipe spacer through the roofs and walls.

For protection against rain or blockage by snow, the vent pipe must terminate with a vent cap which com- plies with the local codes or, in the absence of such codes, to the latest edition of the National Fuel Gas Code, ANSI Z223.1.

The discharge opening must be a minimum of two feet vertically from the roof surface and at least 2 feet high- er than any part of the building or equipment within ten feet. The vent stack shall be at least 5 feet in vertical height above the drafthood outlet. The vent cap loca- tion shall have a minimum clearance of 4 feet horizontally from, and in no case above or below, unless a 4-foot horizontal distance is maintained, from electric meters, gas meters regulators and relief equip- ment.

The weight of the vent stack or chimney must not rest on heater drafthood. Support must be provided in compliance with applicable codes. The heater top and drafthood must be readily removable for maintenance and inspection. Vent pipe should be adequately sup- ported to maintain proper clearances from combustible construction Type "B" double wall or equivalent vent pipe is recommended. However single wall metal vent pipe may be used as specified in the latest edition of the National Flue Gas Code ANSI Z223.1.

DRAFT HOOD

HEATER

Fig. 13: Vent Piping

Manifolds that connect more than one heater to a com- mon chimney must be sized to handle the combined load. Consult available guides for proper sizing of the manifold and the chimney. At no time should the area be less than the area of the largest outlet.

Fig. 14: Common Vent Piping

At the time of removal of an existing heater, the follow- ing steps shall be followed with each appliance remaining connected to the common venting system placed in operation, while the other appliances remain- ing connected to the common venting system are not in operation.

(a)Seal any unused openings in the common venting system.

(b)Visually inspect the venting system for proper size and horizontal pitch and make sure there is no blockage or restriction, leakage, corrosion or other deficiency which could cause an unsafe condition.

(c)Insofar as is practical, close all building doors and windows and all doors between the space in which the appliances remaining connected to the com- mon venting system are located and other spaces of the building. Turn on clothes dryers and any

17

Image 17
Contents Raytherm Hot Water Supply Heaters Page Contents If Propane is Present or Suspected Temperature limiting valves are available, see manual General SafetyTemperature Time to Produce Serious Burn Feel water before bathing or show- eringModel Identification Time/Temperature Relationships in ScaldsReceiving Equipment Installation Model Part Number Installation Clearances All Dimensions are in InchesClearances Models 0182-0400 Specifications and DimensionsModel MBH ModelsMBH GPH High Wind Conditions Outdoor Units Only Outdoor Water HeatersVent Terminal Outdoor Stackless Top Installation Outdoor InstallationsVenting Models 0181-0401Indoor Installations Indoor Top Installation Models 0181-0401 Vent Terminal/Indoor Stack Installation Vent Piping Vent PipingModels 0133 Through 0180 Where Required Vent Damper InstallationLocation MountingVent Damper InstallationGas Supply Connections PlumbingGeneral Venting of Diaphragm Gas Components Gas Pressure RegulatorMaximum and Minimum Flow Rates Flow RatesSoft Medium Hard Piping-Domestic Hot Water Supply HeatersPiping Diagram-Type WH Unitemp 80 System Controls-General Pump Time DelayRelief Valve Electronic IgnitionHigh Limit Flow SwitchLimit Controls High and Low Gas Pressure Switches Optional 100% Pilot SafetyElectrical Connections Low Water Cut-Off OptionalLocation of Controls 0824 Before Start-Up START-UP ProceduresGeneral Initial Start-Up Pump and MotorFor Your Safety Read Before Operating Burners Inspection ProceduresControls After Start-UpStart-Up Procedures S8610b Ignition Module Inspection ProceduresOperation Should be checked monthly. Takes approximately 15 minutesHigh Gas Pressure Switch Burner AdjustmentVisual Inspection ElectricalCombustion Fan Removal Main burner And Orifice RemovalPilot Removal Intermittent Pilot System Honeywell S8600 Electrical-Electronic Ignition IIDMechanical Mechanical Problem Possible Cause Corrective ActionWiring Diagram-W2/WH2 Wiring DiagramsWiring Diagram-WH1 0181/0261 Wiring Diagram-WH1 0331/0401 Wiring Diagram-WH1 Wiring Diagram-WH1 Wiring Diagram-WH1 Wiring Diagram-WH1 Tube Cleaning Service Maintenance ProceduresTroubleshooting-Pumps Combination Flame SENSOR/ Igniter and Pilot Burner Heat Exchanger Re-Assembly Pilot Removal and CleaningHigh Limit or Tankstat Removal Heat Exchanger RemovalControl Well Replacement Replacement PartsTube Replacement Cleaning Flue Gas PassagewaysScope Page