Raypak 1334001 Controls-General, Relief Valve, Pump Time Delay, Electronic Ignition

Page 25

Controls—General

Relief Valve

A new combination temperature and pressure (T&P) relief valve, complying with the Standard for Relief Valves and Automatic Gas Shut-Off Devices for Hot Water Supply Systems, ANSI Z21.22, must be installed in the opening provided on top of the storage tank at the time of installation. No valve is to be placed between the relief valve and the storage tank.

The pressure rating of the relief valve must not exceed the 160 maximum working pressure indicated on the water heater rating plate. The BTUH rating of the relief valve must not be less than the BTUH input of the heater.

Connect the outlet of the relief valve to a suitable open drain. The discharge line must pitch downward from the valve to allow complete draining (by gravity) of the relief valve and discharge line. The discharge line should be no smaller than the outlet of the valve. The end of the discharge line should not be threaded or concealed, and should be protected from freezing. No valve of any type, restriction or reducer coupling, should be installed in the discharge line. Local codes shall govern installation of the relief valve.

Pump Time Delay

There are two versions of the Pump Time Delay. The first is an electronic device that allows the operator to set a variable time (3 to 10 minutes) for the pump to run after the heater shuts off. See Fig. 21 (A). The time is factory-set at 7 minutes and it can be re-adjusted in the field.

The second version is a fully enclosed solid state Time Delay Relay (TDR) with a white jumper that selects one of two time delays. See Fig. 21 (B). If the jumper is on pins 6 and 7 (default) the delay time is 5 minutes. If the jumper is not on pins 6 and 7, the time delay is 10 minutes.

In a conventional system, when the tankstat is satis- fied, the main gas valve closes, but the pump continues operating. With either time delay relay the heater pump is programmed to continue running for an optimum period of time in order to absorb the residual heat from the combustion chamber and use it in the system. The pump then shuts off until the next call for heat is received from the tankstat.

NOTE: Pump will come on when power is first applied to heater.

(A)

(B)

6

1

2

Fig. 21: Economaster Time Delay Relays (TDR)

Electronic Ignition

The intermittent ignition device conserves energy by automatically extinguishing the pilot when desired temperature is reached. When additional heat is need- ed, the pilot re-ignites electrically, eliminating the fuel costs of maintaining a constant pilot. To ensure safe operation, the gas valve cannot open until the pilot relights and is confirmed.

Table J: Electronic Ignition

Operating Controls

On models 0514-1826, models with mechanical mod- ulating controls have one or more Robertshaw Unitrol 7000 Series hydraulic snap on thermostatic combina- tion gas valves. These valves have the pressure regulator and 24-volt operator built-in. The hydraulic actuator will throttle the heater input to adjust the firing rate and meet the required load. This, in effect, pre- vents costly fuel consumption, as compared to an

25

Image 25
Contents Raytherm Hot Water Supply Heaters Page Contents If Propane is Present or Suspected Temperature limiting valves are available, see manual General SafetyTemperature Time to Produce Serious Burn Feel water before bathing or show- eringReceiving Equipment Time/Temperature Relationships in ScaldsModel Identification Installation Clearances Installation Clearances All Dimensions are in InchesModel Part Number Model Specifications and DimensionsModels 0182-0400 MBH ModelsMBH GPH High Wind Conditions Outdoor Units Only Outdoor Water HeatersVent Terminal Outdoor Stackless Top Installation Outdoor InstallationsVenting Models 0181-0401Indoor Installations Indoor Top Installation Models 0181-0401 Vent Terminal/Indoor Stack Installation Vent Piping Vent PipingModels 0133 Through 0180 Where Required Vent Damper InstallationLocation MountingVent Damper InstallationGeneral PlumbingGas Supply Connections Venting of Diaphragm Gas Components Gas Pressure RegulatorMaximum and Minimum Flow Rates Flow RatesSoft Medium Hard Piping-Domestic Hot Water Supply HeatersPiping Diagram-Type WH Unitemp 80 System Controls-General Pump Time DelayRelief Valve Electronic IgnitionLimit Controls Flow SwitchHigh Limit High and Low Gas Pressure Switches Optional 100% Pilot SafetyElectrical Connections Low Water Cut-Off OptionalLocation of Controls 0824 Before Start-Up START-UP ProceduresGeneral Initial Start-Up Pump and MotorFor Your Safety Read Before Operating Burners Inspection ProceduresControls After Start-UpStart-Up Procedures S8610b Ignition Module Inspection ProceduresOperation Should be checked monthly. Takes approximately 15 minutesHigh Gas Pressure Switch Burner AdjustmentVisual Inspection ElectricalPilot Removal Main burner And Orifice RemovalCombustion Fan Removal Intermittent Pilot System Honeywell S8600 Electrical-Electronic Ignition IIDMechanical Mechanical Problem Possible Cause Corrective ActionWiring Diagram-W2/WH2 Wiring DiagramsWiring Diagram-WH1 0181/0261 Wiring Diagram-WH1 0331/0401 Wiring Diagram-WH1 Wiring Diagram-WH1 Wiring Diagram-WH1 Wiring Diagram-WH1 Troubleshooting-Pumps Service Maintenance ProceduresTube Cleaning Combination Flame SENSOR/ Igniter and Pilot Burner Heat Exchanger Re-Assembly Pilot Removal and CleaningHigh Limit or Tankstat Removal Heat Exchanger RemovalControl Well Replacement Replacement PartsTube Replacement Cleaning Flue Gas PassagewaysScope Page