Raypak 133-4001 manual Inspections Burners, Controls, Suggested Inspection Schedule

Page 29

at once. Pilot burner should ignite after gas reaches the pilot burner.

b.Spark ignition should cut-off when pilot flame is established.

c.Main gas valve should open and main burner should ignite after gas reaches the burner port.

Inspections

Burners

Clean main burners and air louvers of dust, lint and debris. Keep boiler area clear and free from com- bustibles and flammable liquids. Do not obstruct the flow of combustion and ventilation air. Make visual check of burner and pilot flame. Yellow flame indicates clogging of air openings. Lifting or blowing flame indi- cates high gas pressure. Low flame indicates low gas pressure.

Modulating burner flame varies in height from approximately 1/4" at low fire to approximately 4" at high fire.

Fig. 41: Typical Main Burner Flame

Fig. 42: Pilot Burner Flame (IID Units)

Fig. 43: Pilot Burner Flame (Standing Pilot Units)

Controls

Check all controls to see that they are operational. To check electronic safety (IID Models), turn off main burner. Observe pilot burner when shutting off pilot gas. Ignition spark should go on. Main gas valve will also drop out.

To check high limit switch, turn dial setting down to a point slightly below the temperature of the water leav- ing the heater. The reset button should snap out and the burner should shut-off. Reset dial to 30°F to 40°F above desired operating temperature, and push reset button. Burner should light.

Suggested Inspection

Schedule

The boiler should be inspected on the first and third months after initial start-up and then on an annual basis. If problems are found, refer to Troubleshooting Guide for additional directions.

1.Remove top of heater and inspect heat exchanger for soot and examine venting system.

2.Remove rear header and inspect for scale deposits, and/or accelerated erosion.

*3. Inspect pilot and main burner flame and firing rate.

*4. Inspect and operate all controls and gas valve.

*5. Visually inspect system for water leaks.

*6. a. Oil pump motor and bearing assembly, if oil cups are provided.

b. Disconnect pump from header and check condi- tion of pump impeller. Check condition of bearing by attempting to move impeller from side to side.

29

Image 29
Contents Raytherm Heating Boilers Deletions None Contents Are important but not related to personal injury hazards 0 5 1 4 a Model IdentificationReceiving Equipment InstallationCertifications Boiler TypesClearances Installation BaseCombustion and Ventilation Air Indoor Units Only Outdoor BoilersHigh-Wind Conditions Outdoor Units Only Venting Outdoor Installations ModelModels 181-401 Model Sq. InchesModels Indoor InstallationsIndoor Installation-Model Indoor Stack InstallationIndoor Installation-Models 181-401 Vent Piping Drafthood Installation-ModelsCommon Venting Models 133 Through 261 Where Required Location Vent Damper InstallationGas Supply Connections PlumbingVent Damper Normal Operation SummaryGas Pressure Regulator Venting of Diaphragm Gas ComponentsGeneral Pump SelectionRecommended Purge Manifolds for Temperature & Pressure GaugeTypical Hydronic System Hookups Feedwater RegulatorSingle Boiler Primary/Secondary Piping-Models Multiple-Boiler- Reverse Return Hook-Up-Models Economaster Controls ControlsElectronic Ignition Operating ControlsMode H3 2-Stage Firing Mode H2 Motorized ModulationMode H4 On/Off Firing Mode H9 4-Stage FiringAuto-Reset High Limit Manual-Reset High LimitFlow Switch 100% Pilot SafetyLow Water Cut-Off Optional High and Low Gas Pressure Switches OptionalElectrical Connections START-UP START-UP For Models with Manual Gas Valves For Your Safety Read Before OperatingFor Models with Automatic Gas Valves After Start-Up Standing Pilot Checkout ProcedureIntermittent Pilot System Checkout S8600 Lighting InstructionsSuggested Inspection Schedule Inspections BurnersControls Models 181 to Blower AdjustmentOperation Start-Up S8600HService Burner Tray Removal Flame Roll-Out Safety SwitchMain Burner and Orifice Removal Gas Valve RemovalPilot Removal Combustion Fan RemovalIntermittent Pilot System Honeywell S8600 TroubleshootingElectrical-Electronic Ignition IID Electrical-Standing Pilot Typical ON-OFF Intermittent Ignition Control Wiring Diagram Mechanical Problem Possible Cause Corrective Action Pumps Tube Cleaning Procedure Service Repair SectionBurner Tray Removal Gas Valve RemovalHeat Exchanger Removal Pilot Removal and CleaningHigh Limit or Tankstat Removal Control Well Replacement Heat Exchanger Re-AssemblyTube Replacement Procedure Combustion Chamber RemovalEastman Avenue Oxnard, CA Replacement PartsCleaning Flue Gas Passageways Limited Warranty Raytherm Types H and WH

133-4001 specifications

Raypak 133-4001 is a premier heating solution designed for both residential and commercial applications, known for its efficiency and reliability. This high-performance water heater is specifically engineered to meet the demanding requirements of hot water supply while ensuring energy conservation and user convenience.

One of the standout features of the Raypak 133-4001 is its robust construction. Made from high-quality materials, including a corrosion-resistant heat exchanger and durable casing, this unit is designed to withstand harsh environmental conditions. Its compact design allows for easy installation in various locations, making it an ideal choice for homeowners and businesses alike.

The unit operates on natural gas or LP gas, providing versatility in fuel choice. With a heating capacity of 199,000 BTU/hr, it delivers an impressive flow rate that ensures a steady supply of hot water, even during peak demand periods. This capacity makes it suitable for a wide range of applications, from residential water heating to larger facilities requiring substantial hot water output.

Raypak’s advanced technology set ensures that the 133-4001 operates at maximum efficiency. It utilizes a modulating power burner that adjusts the flame based on demand, optimizing fuel consumption. This feature not only helps in reducing energy bills but also minimizes the carbon footprint, making it an environmentally friendly option.

Another notable characteristic of the Raypak 133-4001 is its digital control system. The intuitive interface allows for precise temperature adjustments and easy monitoring of the heating process. Users can set the desired water temperature, and the system will maintain it consistently, ensuring comfort and reducing the risk of scalding.

Safety is a paramount consideration in the design of the 133-4001. It features a built-in high-limit switch, pressure relief valve, and multiple safety sensors to prevent overheating and potential hazards. These safety features provide peace of mind for homeowners and facility managers, knowing that their hot water system is reliable and secure.

In conclusion, Raypak 133-4001 combines advanced technology, robust construction, and user-friendly features, making it a highly effective water heating solution. Its efficiency and dependability cater to a variety of hot water needs, positioning it as a top choice for both residential and commercial use. Whether for a single-family home or a large facility, the Raypak 133-4001 is built to deliver exceptional performance with every use.