Rinnai RHFE-750ETRA installation manual Cleaning Combustion Chamber Glass, Care of Exterior

Page 12

Care and Maintenance

The pilot flame should be blue and extend over the flame rod from half to three-fourths of its length. It should not be long, streaky, or yellow.

CORRECT PILOT FLAME APPEARANCE

Cleaning Combustion Chamber Glass

Over time combustion products may leave a film on the combustion chamber glass. Continued use of the appliance may permanently stain the glass. If filming occurs, this glass panel needs to be removed, cleaned, and installed only by a qualified service technician.

Do not clean glass when hot.

Do not clean glass with abrasive cleaners.

1.Open the side louvers and on each side remove one screw attaching the top panel. (Side louvers are opened by pushing in and releasing.)

2.Remove two screws attaching the front panel to the appliance.

3.Remove the front panel by rotating the bottom away from the appliance and lifting upwards to unhook the panel from the top of the appliance.

unhook top

Front Panel

rotate outward first

4.Remove two retaining screws and remove the combustion chamber glass panel.

5.Clean using non-abrasive, non-solvent household cleaner.

6.Install the glass panel. Refer to Final Assembly.

7.Install the front panel with two screws through the louvers. Refer to Final Assembly.

8.Install the top panel with one screw on each side of the side louvers. Refer to Final Assembly.

Care of Exterior

Clean exterior as required using non-abrasive and non-solvent cleaner. Ensure exterior is completely dry before operating.

12

Rinnai Corporation RHFE-750ETRA

Image 12
Contents RHFE-750ETRA Table of Contents Safety Behavior and Practices Safety Features Specifications Natural Gas Propane GasFeatures DimensionsFront Panel Front Panel ModelsDescription Part Number Remote Control Features Remote Control CareRemote Control Operation Sequence of OperationsBasic Fireplace Operations Turning on and OFFAdjusting the Temperature Flame FunctionObstruction of Warm Air Discharge Lock FunctionTimers Programming the clock and timersUsing the Override Pre-heatCare and Maintenance MaintenanceFilters Visual Inspection of FlameCleaning Combustion Chamber Glass Care of ExteriorTroubleshooting Problem Possible Solutions or ExplanationFault Codes Replacement of Thermal FuseCode Fault Remedy Parts Included for Installation General InstructionsClearances to Combustibles Flue Terminal ClearancesSide clearances for air vents Clearances for a Mantle or Decorative OverhangDescription Canadian Installations US Installations Location 28.3 in 720 mmCorrect Floor Flue Manifold Installation VentingVenting with Flue Manifolds FOT-203 and FOT-204 Drilling Flue and Gas Supply Holes+ c II. Extended Venting Horizontal and Vertical Terminations Manufacturer Metal-Fab Part Description NumberMaximum Length = 33 feet 10 m and 3 elbows Vent Length Switch Additional Venting ClearancesConnections Mounting points Final Assembly Install the LogsCondensate Tray Install the Front Panel Air Guide VanesFor Your Safety Read Before Operating Operating InstructionsWiring and Schematic Diagrams Parts List Parts List 109 QTY Description Comments NG Left and Right Packing for AIR Inlet BOX Warranty Information Limited WarrantyWhat is covered? RHFE-750ETRA Direct Vent FireplaceHow do I get service? What is not covered? What will Rinnai do?Limitation on warranties Issue G