Rinnai RHFE-750ETRA installation manual Clearances to Combustibles, Flue Terminal Clearances

Page 16

Clearances to Combustibles

The clearances to combustibles as stated on the rating plate and as shown in the figures must be followed. Also refer to the Safety Behaviors and Practices section.

Clearance from concentric vent system: zero in/mm

Side clearances for air vents

Interior wall

1”

2”

3”

 

 

 

 

 

 

 

 

 

 

3” Minimum

 

 

 

4”

 

 

Top view

 

 

 

 

5”

 

 

 

 

 

 

 

 

 

 

 

 

 

45º

 

 

 

 

 

 

 

 

 

 

Clearances for a

 

 

5”

 

 

 

 

 

mantle or

 

 

 

4”

 

 

 

 

45

 

 

 

 

 

 

decorative

 

 

 

 

3”

 

 

overhang

 

 

 

 

 

 

2”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1”

3” Minimum

Side view

Interior wall

Flue Terminal Clearances

TERMINATION

Clearance in Ref. A also applies to anticipated snow line

INSIDE

CORNER DETAIL

G

H

SNOW

D

E

B

L

A

C

FIXED

CLOSED

OPERABLE

F

B

 

 

B

B

 

FIXED

 

CLOSED

 

OPERABLE

 

B

J

 

 

 

 

B

X

 

A

 

 

V

I M

K

AIR SUPPLY INLET

VENT TERMINAL

AREA WHERE TERMINAL IS NOT PERMITTTED

16

Rinnai Corporation RHFE-750ETRA

Image 16
Contents RHFE-750ETRA Table of Contents Safety Behavior and Practices Safety Features Specifications Natural Gas Propane GasFeatures DimensionsFront Panel Models Front PanelDescription Part Number Remote Control Features Remote Control CareRemote Control Operation Sequence of OperationsBasic Fireplace Operations Turning on and OFFAdjusting the Temperature Flame FunctionObstruction of Warm Air Discharge Lock FunctionTimers Programming the clock and timersUsing the Override Pre-heatCare and Maintenance MaintenanceFilters Visual Inspection of FlameCleaning Combustion Chamber Glass Care of ExteriorTroubleshooting Problem Possible Solutions or ExplanationReplacement of Thermal Fuse Fault CodesCode Fault Remedy Parts Included for Installation General InstructionsClearances to Combustibles Flue Terminal ClearancesSide clearances for air vents Clearances for a Mantle or Decorative OverhangDescription Canadian Installations US Installations Location 28.3 in 720 mmCorrect Floor Flue Manifold Installation VentingVenting with Flue Manifolds FOT-203 and FOT-204 Drilling Flue and Gas Supply Holes+ c II. Extended Venting Horizontal and Vertical Terminations Part Description Number Manufacturer Metal-FabMaximum Length = 33 feet 10 m and 3 elbows Vent Length Switch Additional Venting ClearancesConnections Mounting points Final Assembly Install the LogsCondensate Tray Install the Front Panel Air Guide VanesFor Your Safety Read Before Operating Operating InstructionsWiring and Schematic Diagrams Parts List Parts List 109 QTY Description Comments NG Left and Right Packing for AIR Inlet BOX Warranty Information Limited WarrantyWhat is covered? RHFE-750ETRA Direct Vent FireplaceWhat will Rinnai do? How do I get service? What is not covered?Limitation on warranties Issue G