Rinnai RHFE-750ETRA installation manual + c

Page 21

Venting

2. Assemble and Adjust the Sleeve Length

Measure wall thickness through previously drilled 3 1/2 inch (90 mm) hole.

The end of the sleeve should protrude 3/16 - 3/8 inch (5-10 mm) from the outside wall.

In the FOT-203 (Vent Kit A) there are 4 parts provided with which to assemble the sleeve. Use the table to determine which pieces to assemble.

In both kits, two parts are threaded for additional adjustment.

Adjust the sleeve length to wall thickness plus 3/16 - 3/8 inch (5-10 mm).

a b c

Sleeve Parts

For wall thickness plus 3/16 - 3/8 in (5-10 mm)

Assemble these parts (“A” Vent Kit)

4 1/3 - 6 1/8 in (110 - 155 mm)

 

a

+

b

 

6 1/8 - 7 3/4 in (155 - 195 mm)

a

+

b

+

c

7 3/4 - 9 1/2 in (195 - 240 mm)

a +

b

+

c

+ c

 

 

 

 

 

 

3.Attach the sleeve

Attach to the inside wall using 3 screws arranging the flange so that the marking “TOP” is at the top.

The flange is offset 2° to allow the condensate to drain to the outside.

3 screws

sleeve should extend 3/16 - 3/8 in (5-10 mm)

4. Install the Terminal

Terminal seal

Check that the terminal seal is in place. For weatherboard or vinyl siding, add the second seal next to the terminal seal to compensate for the angle.

From the outside insert the terminal into the sleeve with the marking “TOP” at the top. The left hand side locking tie should be marked “LEFT”.

Terminal

Locking tie

Rinnai Corporation RHFE-750ETRA

21

Image 21
Contents RHFE-750ETRA Table of Contents Safety Behavior and Practices Safety Features Natural Gas Propane Gas SpecificationsDimensions FeaturesFront Panel Front Panel ModelsDescription Part Number Remote Control Care Remote Control FeaturesSequence of Operations Remote Control OperationBasic Fireplace Operations Turning on and OFFFlame Function Adjusting the TemperatureObstruction of Warm Air Discharge Lock FunctionProgramming the clock and timers TimersUsing the Override Pre-heatMaintenance Care and MaintenanceFilters Visual Inspection of FlameCare of Exterior Cleaning Combustion Chamber GlassProblem Possible Solutions or Explanation TroubleshootingFault Codes Replacement of Thermal FuseCode Fault Remedy General Instructions Parts Included for InstallationFlue Terminal Clearances Clearances to CombustiblesSide clearances for air vents Clearances for a Mantle or Decorative OverhangDescription Canadian Installations US Installations 28.3 in 720 mm LocationCorrect Floor Venting Flue Manifold InstallationVenting with Flue Manifolds FOT-203 and FOT-204 Drilling Flue and Gas Supply Holes+ c II. Extended Venting Horizontal and Vertical Terminations Manufacturer Metal-Fab Part Description NumberMaximum Length = 33 feet 10 m and 3 elbows Additional Venting Clearances Vent Length SwitchConnections Mounting points Install the Logs Final AssemblyCondensate Tray Air Guide Vanes Install the Front PanelOperating Instructions For Your Safety Read Before OperatingWiring and Schematic Diagrams Parts List Parts List 109 QTY Description Comments NG Left and Right Packing for AIR Inlet BOX Limited Warranty Warranty InformationWhat is covered? RHFE-750ETRA Direct Vent FireplaceHow do I get service? What is not covered? What will Rinnai do?Limitation on warranties Issue G