Rinnai RHFE-750ETRA installation manual Final Assembly, Install the Logs

Page 27

Final Assembly

Install the Logs

The log set consists of seven pieces as follows:

rear

right hand top

left hand middle

left hand front

right hand middle

right hand front

center top

1.Remove the two retaining screws that secure the combustion chamber glass panel.

2.Rotate and lift the combustion chamber glass clear of the combustion chamber and place in a safe location.

retaining screws

rear

Step 3

locating pins

left hand middle

right hand middle

J

Steps 4 & 5

3.Seat the rear log into the combustion chamber onto its location pins.

4.Seat the left hand middle log onto its location pins.

5.Seat the right hand middle log onto its location pins.

6.Seat the center top log onto the location pins.

7.Seat the right hand top log onto the location pins.

8.Place the left hand front log and the right hand front log on the pins.

9.Install the glass panel with two retainer screws at the top of the panel.

locating pins

center top

right hand top

Steps 6 & 7

locating pins

left hand front

right hand front

Step 8

Rinnai Corporation RHFE-750ETRA

27

Image 27
Contents RHFE-750ETRA Table of Contents Safety Behavior and Practices Safety Features Natural Gas Propane Gas SpecificationsDimensions FeaturesFront Panel Front Panel ModelsDescription Part Number Remote Control Care Remote Control FeaturesTurning on and OFF Remote Control OperationSequence of Operations Basic Fireplace OperationsLock Function Adjusting the TemperatureFlame Function Obstruction of Warm Air DischargePre-heat TimersProgramming the clock and timers Using the OverrideVisual Inspection of Flame Care and MaintenanceMaintenance FiltersCare of Exterior Cleaning Combustion Chamber GlassProblem Possible Solutions or Explanation TroubleshootingFault Codes Replacement of Thermal FuseCode Fault Remedy General Instructions Parts Included for InstallationClearances for a Mantle or Decorative Overhang Clearances to CombustiblesFlue Terminal Clearances Side clearances for air ventsDescription Canadian Installations US Installations 28.3 in 720 mm LocationCorrect Floor Drilling Flue and Gas Supply Holes Flue Manifold InstallationVenting Venting with Flue Manifolds FOT-203 and FOT-204+ c II. Extended Venting Horizontal and Vertical Terminations Manufacturer Metal-Fab Part Description NumberMaximum Length = 33 feet 10 m and 3 elbows Additional Venting Clearances Vent Length SwitchConnections Mounting points Install the Logs Final AssemblyCondensate Tray Air Guide Vanes Install the Front PanelOperating Instructions For Your Safety Read Before OperatingWiring and Schematic Diagrams Parts List Parts List 109 QTY Description Comments NG Left and Right Packing for AIR Inlet BOX RHFE-750ETRA Direct Vent Fireplace Warranty InformationLimited Warranty What is covered?How do I get service? What is not covered? What will Rinnai do?Limitation on warranties Issue G