Rinnai RHFE-750ETRA installation manual Air Guide Vanes, Install the Front Panel

Page 29

Final Assembly

Air Guide Vanes

To move the air flow more to the right or to the left, bend the air guide vanes using only light hand pressure.

Do not bend repeatedly (no more than 5 times) or else the vane will break.

Install the Front Panel

1.Install the front panel by hooking the top into the body and rotating the bottom towards the appliance.

Hook top first

Front Panel

then rotate inward

2.Secure the front panel to the appliance using two screws through the front of the warm air discharge louvers.

3.Set the top panel into place. Open the side louvers and on each side attach the top panel with one screw. (Side louvers are opened by pushing

in and releasing.)

Rinnai Corporation RHFE-750ETRA

29

Image 29
Contents RHFE-750ETRA Table of Contents Safety Behavior and Practices Safety Features Natural Gas Propane Gas SpecificationsDimensions FeaturesDescription Part Number Front PanelFront Panel Models Remote Control Care Remote Control FeaturesSequence of Operations Remote Control OperationBasic Fireplace Operations Turning on and OFFFlame Function Adjusting the TemperatureObstruction of Warm Air Discharge Lock FunctionProgramming the clock and timers TimersUsing the Override Pre-heatMaintenance Care and MaintenanceFilters Visual Inspection of FlameCare of Exterior Cleaning Combustion Chamber GlassProblem Possible Solutions or Explanation TroubleshootingCode Fault Remedy Fault CodesReplacement of Thermal Fuse General Instructions Parts Included for InstallationFlue Terminal Clearances Clearances to CombustiblesSide clearances for air vents Clearances for a Mantle or Decorative OverhangDescription Canadian Installations US Installations 28.3 in 720 mm LocationCorrect Floor Venting Flue Manifold InstallationVenting with Flue Manifolds FOT-203 and FOT-204 Drilling Flue and Gas Supply Holes+ c II. Extended Venting Horizontal and Vertical Terminations Maximum Length = 33 feet 10 m and 3 elbows Manufacturer Metal-FabPart Description Number Additional Venting Clearances Vent Length SwitchConnections Mounting points Install the Logs Final AssemblyCondensate Tray Air Guide Vanes Install the Front PanelOperating Instructions For Your Safety Read Before OperatingWiring and Schematic Diagrams Parts List Parts List 109 QTY Description Comments NG Left and Right Packing for AIR Inlet BOX Limited Warranty Warranty InformationWhat is covered? RHFE-750ETRA Direct Vent FireplaceLimitation on warranties How do I get service? What is not covered?What will Rinnai do? Issue G