Rinnai RHFE-750ETRA installation manual Issue G

Page 40

Manufactured by

Rinnai New Zealand LTD

105 Pavilion Drive, Airport Oaks

Mangerg, Manukau City

New Zealand

15237 (Issue G)

Image 40
Contents RHFE-750ETRA Table of Contents Safety Behavior and Practices Safety Features Specifications Natural Gas Propane GasFeatures DimensionsFront Panel Models Front PanelDescription Part Number Remote Control Features Remote Control CareRemote Control Operation Sequence of OperationsBasic Fireplace Operations Turning on and OFFAdjusting the Temperature Flame FunctionObstruction of Warm Air Discharge Lock FunctionTimers Programming the clock and timersUsing the Override Pre-heatCare and Maintenance MaintenanceFilters Visual Inspection of FlameCleaning Combustion Chamber Glass Care of ExteriorTroubleshooting Problem Possible Solutions or ExplanationReplacement of Thermal Fuse Fault CodesCode Fault Remedy Parts Included for Installation General InstructionsClearances to Combustibles Flue Terminal ClearancesSide clearances for air vents Clearances for a Mantle or Decorative OverhangDescription Canadian Installations US Installations Location 28.3 in 720 mmCorrect Floor Flue Manifold Installation VentingVenting with Flue Manifolds FOT-203 and FOT-204 Drilling Flue and Gas Supply Holes+ c II. Extended Venting Horizontal and Vertical Terminations Part Description Number Manufacturer Metal-FabMaximum Length = 33 feet 10 m and 3 elbows Vent Length Switch Additional Venting ClearancesConnections Mounting points Final Assembly Install the LogsCondensate Tray Install the Front Panel Air Guide VanesFor Your Safety Read Before Operating Operating InstructionsWiring and Schematic Diagrams Parts List Parts List 109 QTY Description Comments NG Left and Right Packing for AIR Inlet BOX Warranty Information Limited WarrantyWhat is covered? RHFE-750ETRA Direct Vent FireplaceWhat will Rinnai do? How do I get service? What is not covered?Limitation on warranties Issue G