
Installation | 31 | |
|
| |
Safety Information on Installation | 31 | |
Preparation | 33 | |
Step 1.1 | Choosing the installation location |
|
Step 1.2 | Checking and preparing accessories and tools |
|
Step 1.3 | Drilling a hole through the wall |
|
Step 1.4 | Taping the pipes, cables, and drain hose |
|
Indoor Unit Installation | 37 | |
Step 2.1 | Connecting the power and communication cables (assembly cable) |
|
Step 2.2 | Optional: Extending the power cable |
|
Step 2.3 | Installing and connecting the drain hose |
|
Step 2.4 | Optional: Extending the drain hose |
|
Step 2.5 | Optional: Changing the direction of the drain hose |
|
Step 2.6 | Installing and connecting the assembly pipes to the refrigerant pipes (assembly pipe) |
|
Step 2.7 | Shortening or extending the refrigerant pipes (assembly pipe) |
|
Step 2.8 | Fixing the installation plate |
|
Outdoor Unit Installation | 43 | |
Step 3.1 | Fixing the outdoor unit in place |
|
Step 3.2 | Connecting the power and communication cables and the refrigerant pipes |
|
Step 3.3 | Evacuating the air |
|
Step 3.4 | Adding refrigerant |
|
Installation Inspection | 46 | |
Step 4.1 | Performing the gas leak tests |
|
Step 4.2 | Performing final check and trial operation |
|
English 3