Plumber’s Tape connected to Wall Strap

Wall Strap

Two 45˚ Elbows

Figure 5.12

Step 3.

To install the round support box/wall thimble cover in a flat ceiling, cut a 10 in. (254mm) square hole in the ceiling, centered on the hole drilled in Step 2. Frame the hole as shown in Figure 5.13.

Ceiling

Joists

Framing

1 - 1/2 in. (38mm) Long

Wood Screws

Figure 5.13

Step 4.

Assemble the desired lengths of pipe and elbows necessary to reach from the appliance up through the round support box. Ensure that all pipe and elbow connections are in their fully twist-locked position. Assemble as instructed.

Step 5.

Cut a hole in the roof centered on the small drill hole placed in the roof in Step 2. The hole should be of sufficient size to meet the minimum requirements for clearance to combustibles, as

specified. Continue to assemble lengths of pipe and elbows necessary to reach from the ceiling support box/wall thimble up through the roof line. Galvanized pipe and elbows may be utilized in the attic, as well as above the roofline. The galvanized finish is desirable above the roofline, due to its higher corrosion resistance.

NOTE:

(1) If an offset is necessary in the attic to avoid obstructions, it is important to support the vent pipe every 3 ft. (914mm) to avoid excessive stress on the elbows, and possible separation. Wall straps are available for this purpose, Figure 5.12.

(2)Whenever possible, use 45° elbows, instead of 90° elbows. The 45° elbow offers less restriction to the flow of flue gases and intake air.

Step 6.

Slip the flashing over the pipe section(s) protruding through the roof. Secure the base of the flashing to the roof with roofing nails. Ensure the roofing material overlaps the top edge of the flashing as shown in Figure 5.14. Verify that the chimney is the required height above the roof. See roof pitch table, Figure 4.3, on page 8 of this manual.

Shingles overlap on

CAP AND STORM

COLLAR NOT SHOWN

top edge of flashing

FOR CLARITY

 

Figure 5.14

Step 7.

Continue to assemble pipe sections until the height of the vent (before adding the termination cap) meets the minimum code requirements as outlined in the current CAN/CGA-B149 Installation Codes (in Canada), the National Fuel Gas Code NFPA 54/ANSI Z223.1 (in USA), or local codes. Note that for steep roof pitches, the vent height must be increased. See Roof Pitch Table (Figure 4.3, on page 8). In high wind conditions, nearby trees adjoining rooflines, steep pitched roofs, and other similar factors can result in poor draft, or down drafting. In these cases increasing the vent height or switching to the high wind termination cap may solve this problem.

Page 16

Quadra-Fire · Castile Gas Stove · 7023-111E

July 29, 2008

Image 16
Contents What to do if you smell gas Do not Discard this ManualDo Discardnot Hot glass will cause burnsWelcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals BELOW. Keep Clear of ALL Obstructions Requirements for the Commonwealth of MassachusettsManufacturer Requirements Design & Installation Considerations Tools will apply to every installationGetting Started Inspect Appliance & ComponentsSelecting Appliance Location Clearances4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Vent Information Venting ComponentsUse of Elbows Measuring StandardsHow to Use the Vent Graph Venting Guidelines Exceptions for Horizontal InstallationsType a Up and Out Installation Type B Straight Out InstallationType C 45 Elbow in Corner Installation Horizontal Termination203mm Step Vertical Termination Direct Vent PipeStep Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Type C Up & Out Installation Type a & B Co-Axial to Co-LinearExisting Masonry Chimney Type a Type BCut and bend flashing as needed to fit Sealant adhesive Retro Connector Gas Information Fuel ConversionsConverting to LP Gas Propane Natural GASValve Regulator Replacement Screws Rubber Gasket Identification Label FGas Pressures Gas Connection PressureCheck for GAS Leaks Recommendation for Wire Connecting to the ApplianceStanding Pilot Ignition System Wiring Wire Size Max. LengthON/OFF Appliance Setup AccessoriesRemove Shipping Materials Top to Rear Vent ConversionBaf e Installation/Adjustment Leg Leveling SystemMineral Wool Positioning the LogsOpening Front Door Glass Door Assembly Blower Installation 16 nut Snap disc through bracketBlower Damper Adjustment For top or rear vent installations Shutter AdjustmentBefore Lighting Appliance Operating InstructionsControls For Your Safety Read Before Lighting Lighting ApplianceInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Your Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerAppliance Dimension Diagram Reference MaterialsVent Components Diagram SL-D Series Vent ComponentsVent Components List HHT SL-PTermination Caps & Kits Castile GAS Service Parts List cont’d. Castile GAS Nbr DescriptionSKU Part DescriptionAlphabetical Order RV-CG-MBK Accessories Lifetime Warranty Warranty PolicyContact Information Castile GasDealer Telephone