Quadra-Fire CASTILE-GAS-MBK 4Termination Locations, Vent Termination Minimum Clearances

Page 8

4Termination Locations

A. Vent Termination Minimum Clearances

WARNING

Fire Risk.

Explosion Risk.

Maintain vent clearance to combustibles as specifi ed.

• Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fi re.

Measure vertical clearances from this surface.

2FT.

MIN.

GAS DIRECT VENT

TERMINATION CAP

HORIZONTAL

OVERHANG

20 INCHES MIN.

VERTICAL

 

WALL

LOWEST

DISCHARGE

OPENING

X

12

ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

Measure horizontal clearances from this surface. (See Figure 4.4 for specifi c clearances.)

Figure 4.1 Termination Clearances

GAS, WOOD OR FUEL

 

OIL TERMINATION

B

 

 

 

 

 

GAS

 

 

 

 

 

 

 

 

 

 

 

C

TERMINATION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

Gas

Wood & Fuel Oil

Comments

 

Termination

Termination

 

 

 

 

 

 

A

6 in.

20 in. min.

Horizontal distance between terminations

 

 

 

 

B

20 in.

24 in. min.

Distance to perpendicular wall

 

 

 

 

C

18 in.

18 in.

Vertical distance between terminations

 

 

 

 

Figure 4.2 Multiple Vertical Termination

Roof Pitch

H (Min.) Ft

Flat to 6/12

1.0*

Over 6/12 to .......................................................7/12

1.25

Over 7/12 to 8/12

1.5*

Over 8/12 to 9/12

2.0*

Over 9/12 to 10/12

2.5*

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4.0

Over 12/12 to 14/12

5.0

Over 14/12 to 16/12

6.0

Over 16/12 to 18/12

7.0

Over 18/12 to 20/12

7.5

Over 20/12 to 21/12

8.0

* 3 foot minimum in snow regions

Figure 4.3 Minimum Height from Roof to Lowest Discharge Opening

Figure 4.3 specifi es minimum vent heights for various pitched roofs.

Page 8

Quadra-Fire · Castile Gas Stove · 7023-111E

July 29, 2008

Image 8
Contents What to do if you smell gas Do not Discard this ManualDo Discardnot Hot glass will cause burnsWelcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Manufacturer Requirements Requirements for the Commonwealth of MassachusettsBELOW. Keep Clear of ALL Obstructions Design & Installation Considerations Tools will apply to every installationGetting Started Inspect Appliance & ComponentsSelecting Appliance Location Clearances4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Vent Information Venting ComponentsUse of Elbows Measuring StandardsHow to Use the Vent Graph Venting Guidelines Exceptions for Horizontal InstallationsType a Up and Out Installation Type B Straight Out InstallationType C 45 Elbow in Corner Installation Horizontal Termination203mm Step Vertical Termination Direct Vent PipeStep Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Type C Up & Out Installation Type a & B Co-Axial to Co-LinearExisting Masonry Chimney Type a Type BCut and bend flashing as needed to fit Sealant adhesive Retro Connector Gas Information Fuel ConversionsConverting to LP Gas Propane Natural GASValve Regulator Replacement Screws Rubber Gasket Identification Label FGas Pressures Gas Connection PressureCheck for GAS Leaks Recommendation for Wire Connecting to the ApplianceStanding Pilot Ignition System Wiring Wire Size Max. LengthON/OFF Appliance Setup AccessoriesRemove Shipping Materials Top to Rear Vent ConversionBaf e Installation/Adjustment Leg Leveling SystemOpening Front Door Positioning the LogsMineral Wool Glass Door Assembly Blower Installation 16 nut Snap disc through bracketBlower Damper Adjustment For top or rear vent installations Shutter AdjustmentControls Operating InstructionsBefore Lighting Appliance For Your Safety Read Before Lighting Lighting ApplianceAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Your Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerAppliance Dimension Diagram Reference MaterialsVent Components Diagram SL-D Series Vent ComponentsVent Components List HHT SL-PTermination Caps & Kits Castile GAS Service Parts List cont’d. Castile GAS Nbr DescriptionAlphabetical Order Part DescriptionSKU RV-CG-MBK Accessories Lifetime Warranty Warranty PolicyDealer Telephone Castile GasContact Information