Step 8.

Slip the storm collar over the pipe, and push it down to the top of the flashing (Figure 5.15). Use non-hardening sealant above and below the joint between the storm collar and the pipe.

Optional High Wind Termination Cap

Secure Flashing with Non-Hardening

Sealant and Roofing Nails

Figure 5.15

Step 9.

Twist-lock the vent cap and seal.

Note: For multi-story vertical installations, a ceiling firestop is required at the second floor, and any subsequent floors (Figure 5.16). The opening should be framed to 10 in. x 10 in. (254mm x 254mm) inside dimensions, in the same manner as shown in Figure 5.13.

Nails

Ceiling Firestop

Minimum 1 in.

(24mm) Clearance

Minimum 1 in.

(24mm) Clearance

Minimum 1 in.

(24mm) Clearance

Minimum 1 in.

(24mm) Clearance

Figure 5.16

WARNING

Fire Risk.

Explosion Risk.

Any occupied areas above the first floor, including closets and storage spaces, which the vertical vent passed through must be enclosed. The enclosure may be framed and sheetrocked with standard construction materials; however, refer to these installation instructions for the minimum allowable clearance between the outside of the vent pipe and the combustible surfaces of the enclosure. Do not fill any of the required air space with insulation.

July 29, 2008

Quadra-Fire · Castile Gas Stove · 7023-111E

Page 17

Image 17
Contents Do not Discard this Manual What to do if you smell gasDo Discardnot Hot glass will cause burnsWelcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Manufacturer Requirements Requirements for the Commonwealth of MassachusettsBELOW. Keep Clear of ALL Obstructions Tools will apply to every installation Design & Installation ConsiderationsGetting Started Inspect Appliance & ComponentsClearances Selecting Appliance LocationVent Termination Minimum Clearances 4Termination LocationsAlcove Applications Venting Components Vent InformationUse of Elbows Measuring StandardsExceptions for Horizontal Installations How to Use the Vent Graph Venting GuidelinesType B Straight Out Installation Type a Up and Out InstallationType C 45 Elbow in Corner Installation Horizontal Termination203mm Step Direct Vent Pipe Vertical TerminationStep Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Type a & B Co-Axial to Co-Linear Type C Up & Out InstallationExisting Masonry Chimney Type a Type BCut and bend flashing as needed to fit Sealant adhesive Retro Connector Fuel Conversions Gas InformationConverting to LP Gas Propane Natural GASScrews Rubber Gasket Identification Label F Valve Regulator ReplacementPressure Gas Pressures Gas ConnectionCheck for GAS Leaks Connecting to the Appliance Recommendation for WireStanding Pilot Ignition System Wiring Wire Size Max. LengthON/OFF Accessories Appliance SetupRemove Shipping Materials Top to Rear Vent ConversionLeg Leveling System Baf e Installation/AdjustmentOpening Front Door Positioning the LogsMineral Wool 16 nut Snap disc through bracket Glass Door Assembly Blower InstallationBlower Shutter Adjustment Damper Adjustment For top or rear vent installationsControls Operating InstructionsBefore Lighting Appliance Lighting Appliance For Your Safety Read Before LightingAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing Your ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectReference Materials Appliance Dimension DiagramSL-D Series Vent Components Vent Components DiagramHHT SL-P Vent Components ListTermination Caps & Kits Castile GAS Nbr Description Service Parts List cont’d. Castile GASAlphabetical Order Part DescriptionSKU RV-CG-MBK Accessories Warranty Policy Lifetime WarrantyDealer Telephone Castile GasContact Information