Quadra-Fire 7046-137C warranty ACC Wood Insert Tube Channel Assembly Replacement

Page 24

2700-I ACC Wood Insert

R

F. Tube Channel Assembly Replacement

Removing Tube Channel Assembly

1.Remove the 3 bottom bricks first and then remove the 3 right side bricks.

2.Remove the baffle protection channel by bending back the tabs using needle nose pliers located at the right and left side of the protection cover. Lift the cover up slightly and pull toward the front and out of the firebox. Figure 24.1.

3.Locate the 2 channel nuts inside of chamber and remove using a 7/16 socket wrench. Figure 24.2.

NOTE:Soak the bolts with penetrating oil for at least 15 minutes before trying to remove them.

4.Slide the tube channel assembly all the way to left until it is off the threads. Drop the right side down, then slide the assembly back to right. Figure 24.3.

5.The ceramic blanket and both baffle boards can be removed at the same time you remove the tube channel assembly.

6.When the tube channel assembly is free of the left side sup- port, rotate clockwise and pull assembly, blanket and baffles out through the front opening.

7.Re-install in reverse order.

Bend Back Tabs

Baffle Protection

Channel

Figure 24.1

Use 7/16 Socket Wrench

and Remove Channel Nuts

Figure 24.2

2 Tube Channel Nuts

 

1

 

 

 

3

2

 

 

Tube Channel

4

Rotate and

Assembly

 

remove from

 

firebox

 

 

1

 

 

 

1

 

2

1

 

3

 

 

Baffle Boards

4

 

Ceramic Blanket

 

 

Baffle Protection Channel

 

 

Figure 24.3

Page 24

7046-137C

December 15, 2009

Image 24
Contents ACC Wood Insert Hot glass will cause burnsACC Wood Insert Serial NumberTable of Contents ACC Wood Insert Warranty Policy ACC Wood Insert BTU & Efficiency Specifications Glass SpecificationsListing and Code Approvals Appliance CertificationOperating Instructions Your Wood ApplianceACC Wood Insert Fire Safety Combustible/Non-combustible MaterialsOverfiring Seasoned WoodACC Wood Insert Burning Process Kindling or First StageSecond Stage Final StageManual Timer Over-Ride ACC Wood Insert Automatic Combustion Control ACCAir Controls Start-Up Air ControlBurn Rates and Operating Efficiency Correct Baffle and Blanket Positions Incorrect Baffle and Blanket PositionsACC Wood Insert Building a Fire ACC Wood Insert Wood Fuel Do not USE Chemicals or Fluids to Start a FireBlower Operating Instructions Frequently Asked Questions ACC Wood Insert Clear SpaceOpacity Smoke Maintenance and Service Chimney and Chimney Connector Inspection/CleaningCleaning Plated Surfaces Disposal of AshesACC Wood Insert Glass Cleaning Inspect Firebrick Cont’dInspect Firebrick Baffle & Blanket Placement Troubleshooting Guide Start Fire Problems Possible Cause SolutionService Parts Replacement Glass Replacement Snap Disc ReplacementACC Wood Insert Blower Replacement Shock RiskACC Wood Insert Door Handle Assembly Baffle & Ceramic Blanket RemovalACC Wood Insert Tube Channel Assembly Replacement Design and Installation Considerations Getting StartedDraft ACC Wood Insert Negative Pressure ACC Wood Insert Locating Your Stove & Chimney Chimney Termination RequirementsACC Wood Insert Rule Flat RoofACC Wood Insert Tools And Supplies Needed Inspect Appliance and ComponentsPre-Use Check List Dimensions and Clearances Appliance DimensionsSideWall Build On-Site Hearth Support Accessory ACC Wood Insert Zero Clearance Floor ProtectionFull Reline RequiredACC Wood Insert Calculating Alternate Floor Protection Chimney Systems Venting SystemsInspections Masonry ChimneyACC Wood Insert Masonry Chimney Cont’d ACC Wood Insert Metal Heat Circulating Masonry Prefabricated Metal Chimney36.1 ACC Wood Insert Prefabricated Metal Chimney Cont’d Securing Chimney ComponentsAltering the Fireplace ACC Wood Insert Zero-Clearance Fireplace Ovalizing Round Stainless Steel LinersChimney Height / Rise and Run Outside Air Kit Installation Items Needed for Installation not suppliedOption One Installation Instructions Option Two Installation InstructionsLeveling Legs Flue AdapterSlide ACC Wood Insert Surround & Trim Kit Installation Cont’d Top Installation InstructionsACC Wood Insert Blower Cord Installation on Left Side InstructionsACC Wood Insert Zero Clearance Adjustable Trim Support Adjustable from 2 inches to 10 inchesShears, Measuring Tape, Gloves Mobile Home Installation Reference Materials Exploded DrawingsFigure a ACC Wood Insert Service Parts & Accessories Important this is Dated Information HOW to OrderStocked At Depot Description Comments Part Number Stocked Description Comments Part NumberFasteners ACC Wood Insert Service And Maintenance Log Date of Service Performed By Description of ServiceContact Information