OmniTek 839-1290, 839-1320, 839-1340 owner manual Vertical Termination, Direct Vent Pipe, Step

Page 15

G.Vertical Termination

1. Direct Vent Pipe

Vertical Termination Cap

Storm Collar

Flashing

Firestop

Support Box

Pipe Length

Figure 5.10

Step 1.

Check the installation instructions for required 1 in. (25mm) clearances (air space) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. See page 16, Figure

5.16.Check the instructions below for maximum vertical rise of the venting system, and any maximum horizontal offset limitations. All offsets must fall within the set parameters of the vent graph (Figure 5.2) located on page 11.

NOTE: Maximum vertical rise allowable is 40 ft. (12m) Figure 5.11).

NOTE: Maximum number of 45° elbows permitted for a vertical installation is eight, provided their installation does not decrease maximum allowable horizontal run (as specified by vent graph, on page 11).

WARNING

Fire Risk. Explosion Risk.

Maintain vent clearance to combustibles as speci- fied.

• Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fire.

40 ft. (12m) Maximum

Figure 5.11

Step 2.

Set the gas appliance in its desired location. Drop a plumb bob down from the ceiling to the position of the appliance flue exit, and mark the location where the vent will penetrate the ceiling. Drill a small hole at this point. Next, drop a plumb bob from the roof to the hole previously drilled in the ceiling, and mark the spot where the vent will penetrate the roof. Determine if ceiling joists, roof rafters, or other framing will obstruct the venting system. You may wish to relocate the appliance, or to offset, as shown in Figure 5.12 to avoid cutting loadbearing members. When location is determined, drill small hole.

Plumber’s Tape connected to Wall Strap

Wall Strap

Two 45˚ Elbows

Figure 5.12

Quadra-Fire • Topaz • 7009-113 Rev. J • 12/11

15

Image 15
Contents Hot glass will cause burns Do DiscardnotWelcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Gas Equipment Venting System not Provided Requirements for the Commonwealth of MassachusettsManufacturer Requirements Gas Equipment Venting System ProvidedTools and Supplies Needed Design & Installation ConsiderationsGetting Started Inspect Appliance & ComponentsSelecting Appliance Location ClearancesDesign Purposes only Vent Termination Minimum Clearances 4Termination LocationsAlcove Applications Measuring Standards Vent InformationVenting Components Use of ElbowsFrom Appliance to How to Use the Vent GraphVenting Guidelines Vertical DistanceStep Type a Up & Out Installations for Top Vent ConfigurationsType B Rear Installations for Use with Rear Vent Kit Horizontal TerminationTop Vent Touching the hot cap Vertical Termination Direct Vent PipeStep Ceiling Joists Framing 2 in mm Long Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Fire Risk Explosion Risk Retro Connector Gas Information Fuel ConversionsConverting to LP Gas Propane Natural GAS Valve Regulator ReplacementPressure Gas PressuresCheck for GAS Leaks Gas ConnectionWire Size Max. Length Recommendation for WireConnecting to the Appliance Standing Pilot Ignition System WiringON/OFF Switch Red 28Thermocouple Gas Pilot Ignitor Thermopile Ignitor Red 28 711mmAppliance Setup Remove Shipping MaterialsTop to Rear Vent Conversion Leg Leveling System AccessoriesFront Installation Fronts shipped attached to face Brick InstallationFor Both Quartet and Solitaire Fronts Qty Description Positioning the LogsMineral Wool Blower Installation Glass Door Assembly ReplacementWhite Make adjustment Damper AdjustmentShutter Adjustment For TOP or Rear Vent InstallationsOperating Instructions Before Lighting ApplianceControls Lighting Appliance For Your Safety Read Before LightingFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing Your ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectReference Materials Appliance Dimension DiagramMm inner pipe 6-5/8 in mm outer pipe Vent Components DiagramDura-Vent Vent Components ListDescription SimpsonTermination Caps & Kits HHT SLPSimpson Description Dura-VentRD. Service Parts List Log Set Assembly Part number list on followingDirect Vent Gas Stove Description Comments Part Number Service Parts ListStocked At DepotBRNR-TOPAZ SIDE-TPZ-MBKSIDE-TPZ-POR TOUCHUP-CWL TOUCHUP-CSBStocked Fasteners Description Comments Part Number AccessoriesBK-GAS WSLG-CSBLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Topaz Contact InformationDealer Telephone