OmniTek 839-1290, 839-1320, 839-1340 owner manual Fire Risk Explosion Risk

Page 21

CAUTION

Ensure that existing chimney is functionally sound and clean.

Have inspection done by qualified chimney sweep or professional installer BEFORE converting to direct vent appliance.

Step 1.

Before cutting any holes, assemble the desired sections of direct vent pipe to determine the center of the masonry penetration.

Step 2.

Once the center point of the penetration has been determined, cut a 6 in. (152mm) diameter hole in the masonry. If the hole is too large, the retro connector might not mount properly; if the hole is too small, the appliance might starve for intake air. If there is a frame wall in front of the masonry wall, cut and frame a 10 in. (254mm) square opening in the wall (centered around the 6 in. (152mm) masonry opening). If there is sheet rock only (no studs) in front of the masonry the 10 in. (254mm) opening is still needed, but does not need to be framed. If the hole is framed a round support box/wall thimble is required. This allows the retro connector to mount directly on the masonry and provide the correct clearances to combustibles (Figure 5.25).

Cut and bend flashing as needed to fit

Sealant adhesive

Figure 5.26

Step 4.

To determine the length of flex needed, measure from 3 in. (76mm) above the top of the flashing down to the level of the opening. Add the distance from the center of the chimney out through the wall. Cut a piece of 4 in. (102mm) flex to this length (extended to its nominal length). Be sure to leave 2-3 in. (51-76mm) of flex above the existing chimney to allow for connection to the termination kit.

Step 5.

Connect the flex liner to the top adapter using three sheet metal screws (Figure 5.21 page 19).

Studwall

10 in. x 10 in. (254mm x 254mm)

framed opening in wall

Retro Connector

(4) Masonry Bolts

(Not Included)

Masonry Chimney

Wall Thimble Cover

Step 6.

Feed the flex liner through the flashing into the chimney. Carefully feed the flex liner down the chimney to the bottom and out the opening in the masonry wall, forming an angle to line up the flex liner with the vent opening on the appliance.

WARNING

Fire Risk.

Explosion Risk.

NOTE: For hearth applications refer to page 20, Figure 5.24 for the use of a co-axial to co-linear appliance connector.

Figure 5.25

Do not let the flex liner sag below the level at which it will connect to the appliance or connector. This could allow hot gas to become trapped and potentially become a fire hazard. The flex liner path should always be sloped up toward the termination cap.

Step 3.

Secure the flashing to the top of the masonry chimney using a bead of non-hardening sealant-adhesive. If the flashing is larger than the top of the chimney, cut and fold flashing as needed to fit chimney (Figure 5.26).

Step 7.

If additional lengths of flex liner are needed to span the chimney height, use a flex coupler to connect the pieces of flex liner together. Connect the flex to the coupler by using four sheet metal screws for each side (Figure 5.27, on the next page).

Quadra-Fire • Topaz • 7009-113 Rev. J • 12/11

21

Image 21
Contents Hot glass will cause burns Do DiscardnotWelcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Manufacturer Requirements Requirements for the Commonwealth of MassachusettsGas Equipment Venting System Provided Gas Equipment Venting System not ProvidedGetting Started Design & Installation ConsiderationsInspect Appliance & Components Tools and Supplies NeededSelecting Appliance Location ClearancesDesign Purposes only Vent Termination Minimum Clearances 4Termination LocationsAlcove Applications Venting Components Vent InformationUse of Elbows Measuring StandardsVenting Guidelines How to Use the Vent GraphVertical Distance From Appliance toType B Rear Installations for Use with Rear Vent Kit Type a Up & Out Installations for Top Vent ConfigurationsHorizontal Termination StepTop Vent Touching the hot cap Vertical Termination Direct Vent PipeStep Ceiling Joists Framing 2 in mm Long Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Fire Risk Explosion Risk Retro Connector Gas Information Fuel ConversionsConverting to LP Gas Propane Natural GAS Valve Regulator ReplacementPressure Gas PressuresCheck for GAS Leaks Gas ConnectionConnecting to the Appliance Recommendation for WireStanding Pilot Ignition System Wiring Wire Size Max. LengthThermocouple Gas Pilot Ignitor Thermopile Switch Red 28Ignitor Red 28 711mm ON/OFFAppliance Setup Remove Shipping MaterialsTop to Rear Vent Conversion Leg Leveling System AccessoriesFront Installation Fronts shipped attached to face Brick InstallationFor Both Quartet and Solitaire Fronts Qty Description Positioning the LogsMineral Wool Blower Installation Glass Door Assembly ReplacementWhite Shutter Adjustment Damper AdjustmentFor TOP or Rear Vent Installations Make adjustmentOperating Instructions Before Lighting ApplianceControls Lighting Appliance For Your Safety Read Before LightingFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing Your ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectReference Materials Appliance Dimension DiagramMm inner pipe 6-5/8 in mm outer pipe Vent Components DiagramDescription Vent Components ListSimpson Dura-VentSimpson HHT SLPDescription Dura-Vent Termination Caps & KitsRD. Service Parts List Log Set Assembly Part number list on followingDirect Vent Gas Stove Stocked Service Parts ListAt Depot Description Comments Part NumberBRNR-TOPAZ SIDE-TPZ-MBKSIDE-TPZ-POR TOUCHUP-CWL TOUCHUP-CSBStocked BK-GAS Description Comments Part Number AccessoriesWSLG-CSB FastenersLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Topaz Contact InformationDealer Telephone