OmniTek 839-1340, 839-1290, 839-1320 4Termination Locations, Vent Termination Minimum Clearances

Page 8

4Termination Locations

A. Vent Termination Minimum Clearances

WARNING

Fire Risk. Explosion Risk.

Maintain vent clearance to combustibles as specified.

Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fire.

Measure vertical clearances from this surface.

2FT.

MIN.

GAS DIRECT VENT

TERMINATION CAP

HORIZONTAL

OVERHANG

20 INCHES MIN.

VERTICAL

 

WALL

LOWEST

DISCHARGE

OPENING

X

12

ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

Measure horizontal clearances from this surface. (See Figure 4.4 for specific clearances.)

Figure 4.1 Termination Clearances

A

B

6 in. (minimum) up to 20 in.

18 in. minimum

152 mm/508 mm

457 mm

20 in. and over

0 in. minimum

Gas, Wood or Fuel Oil

Termination Cap

B

A *

Gas

Termination

Cap **

*If using decorative cap cover(s), this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover.

**In a staggered installation with both gas and wood or fuel oil terminations, the wood or fuel oil termination cap must be higher than the gas termination cap.

Figure 4.2 Multiple Vertical Termination

Roof Pitch

H (Min.) Ft.

Flat to 6/12

1.0*

Over 6/12 to .......................................................7/12

1.25*

Over 7/12 to 8/12

1.5*

Over 8/12 to 9/12

2.0*

Over 9/12 to 10/12

2.5*

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4.0

Over 12/12 to 14/12

5.0

Over 14/12 to 16/12

6.0

Over 16/12 to 18/12

7.0

Over 18/12 to 20/12

7.5

Figure 4.3 Minimum Height from Roof to Lowest Discharge Opening

Figure 4.3 specifies minimum vent heights for various pitched roofs.

8

Quadra-Fire • Topaz • 7009-113 Rev. J • 12/11

Image 8
Contents Do Discardnot Hot glass will cause burnsWelcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Manufacturer RequirementsGas Equipment Venting System Provided Gas Equipment Venting System not ProvidedDesign & Installation Considerations Getting StartedInspect Appliance & Components Tools and Supplies NeededDesign Purposes only Selecting Appliance LocationClearances 4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Vent Information Venting ComponentsUse of Elbows Measuring StandardsHow to Use the Vent Graph Venting GuidelinesVertical Distance From Appliance toType a Up & Out Installations for Top Vent Configurations Type B Rear Installations for Use with Rear Vent KitHorizontal Termination StepTop Vent Touching the hot cap Step Vertical TerminationDirect Vent Pipe Ceiling Joists Framing 2 in mm Long Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Fire Risk Explosion Risk Retro Connector Converting to LP Gas Gas InformationFuel Conversions Valve Regulator Replacement Propane Natural GASGas Pressures PressureGas Connection Check for GAS LeaksRecommendation for Wire Connecting to the ApplianceStanding Pilot Ignition System Wiring Wire Size Max. LengthSwitch Red 28 Thermocouple Gas Pilot Ignitor ThermopileIgnitor Red 28 711mm ON/OFFTop to Rear Vent Conversion Appliance SetupRemove Shipping Materials Accessories Leg Leveling SystemFor Both Quartet and Solitaire Fronts Front Installation Fronts shipped attached to faceBrick Installation Positioning the Logs Qty DescriptionMineral Wool Glass Door Assembly Replacement Blower InstallationWhite Damper Adjustment Shutter AdjustmentFor TOP or Rear Vent Installations Make adjustmentControls Operating InstructionsBefore Lighting Appliance For Your Safety Read Before Lighting Lighting ApplianceAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Your Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerAppliance Dimension Diagram Reference MaterialsVent Components Diagram Mm inner pipe 6-5/8 in mm outer pipeVent Components List DescriptionSimpson Dura-VentHHT SLP SimpsonDescription Dura-Vent Termination Caps & KitsDirect Vent Gas Stove RD. Service Parts ListLog Set Assembly Part number list on following Service Parts List StockedAt Depot Description Comments Part NumberSIDE-TPZ-POR BRNR-TOPAZSIDE-TPZ-MBK TOUCHUP-CSB TOUCHUP-CWLStocked Description Comments Part Number Accessories BK-GASWSLG-CSB FastenersLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Dealer Telephone TopazContact Information