OmniTek 839-1290, 839-1320, 839-1340 owner manual Cathedral Ceiling

Page 18

2. Cathedral Ceiling

Step 1.

Follow installation Steps 1 and 2 under vertical installation section, page 15.

Step 2.

Using the plumb-bob, mark the center line of the venting system on the ceiling, and drill a small hole through the ceiling and roof at this point. From the roof, locate the drill hole and mark the outline of the cathedral ceiling support box.

Step 3.

Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Cut the hole 1/8 in. (3mm) larger than the support box outline.

Step 4.

Lower the support box through the hole in the roof until the bottom of the support box protrudes at least 2 in. (51mm) below the ceiling (Figure 5.17). Align the support box both vertically and horizontally with a level. Temporarily tack the support box in place through the inside walls and into the roof sheathing.

Level

Cathedral Ceiling

Support Box

2 in. (51mm) Min. below finished ceiling

Cut hole 1/8 in. (3mm) greater in size than pattern of support box as it is projected onto roof line

Figure 5.17

Step 5.

Using tin snips, cut the support box from the top corners down to the roofline, and fold the resulting flaps over the roof sheathing (Figure 5.18). Before nailing it to the roof, run a bead of non-hardening mastic around the top edges of the support box to make a seal between it and the roof. Clean out any combustible material from inside the support box.

Figure 5.18

Step 6.

Complete the cathedral ceiling installation by following the same procedures outlined in steps 7 through 9 for vertical installations, pages 16-17.

Step 7.

Place the support clamp (provided with the support box) inside the support box (at the bottom), and secure to the pipe section. The clamp allows the support box to support the weight of the pipe sections. Continue to add pipe sections until you are above the roofline.

Step 8.

Install the black trim collar around the outside of the cathedral ceiling support box (Figure 5.19). The two pieces of the trim collar slide over one another to allow for easy adjustment around the support box. Using the six screws provided, secure the four corners and the overlapping sections of the trim collar to the ceiling. You may want to predrill the holes for the overlapped sections for ease of installation.

Trim Collar

Cathedral

Ceiling

Support Screws

Box

Figure 5.19

18

Quadra-Fire • Topaz • 7009-113 Rev. J • 12/11

Image 18
Contents Do Discardnot Hot glass will cause burnsWelcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Gas Equipment Venting System Provided Requirements for the Commonwealth of MassachusettsManufacturer Requirements Gas Equipment Venting System not ProvidedInspect Appliance & Components Design & Installation ConsiderationsGetting Started Tools and Supplies NeededSelecting Appliance Location ClearancesDesign Purposes only 4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Use of Elbows Vent InformationVenting Components Measuring StandardsVertical Distance How to Use the Vent GraphVenting Guidelines From Appliance toHorizontal Termination Type a Up & Out Installations for Top Vent ConfigurationsType B Rear Installations for Use with Rear Vent Kit StepTop Vent Touching the hot cap Vertical Termination Direct Vent PipeStep Ceiling Joists Framing 2 in mm Long Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Fire Risk Explosion Risk Retro Connector Gas Information Fuel ConversionsConverting to LP Gas Valve Regulator Replacement Propane Natural GASGas Pressures PressureGas Connection Check for GAS LeaksStanding Pilot Ignition System Wiring Recommendation for WireConnecting to the Appliance Wire Size Max. LengthIgnitor Red 28 711mm Switch Red 28Thermocouple Gas Pilot Ignitor Thermopile ON/OFFAppliance Setup Remove Shipping MaterialsTop to Rear Vent Conversion Accessories Leg Leveling SystemFront Installation Fronts shipped attached to face Brick InstallationFor Both Quartet and Solitaire Fronts Positioning the Logs Qty DescriptionMineral Wool Glass Door Assembly Replacement Blower InstallationWhite For TOP or Rear Vent Installations Damper AdjustmentShutter Adjustment Make adjustmentOperating Instructions Before Lighting ApplianceControls For Your Safety Read Before Lighting Lighting ApplianceFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Your Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerAppliance Dimension Diagram Reference MaterialsVent Components Diagram Mm inner pipe 6-5/8 in mm outer pipeSimpson Vent Components ListDescription Dura-VentDescription Dura-Vent HHT SLPSimpson Termination Caps & KitsRD. Service Parts List Log Set Assembly Part number list on followingDirect Vent Gas Stove At Depot Service Parts ListStocked Description Comments Part NumberBRNR-TOPAZ SIDE-TPZ-MBKSIDE-TPZ-POR TOUCHUP-CSB TOUCHUP-CWLStocked WSLG-CSB Description Comments Part Number AccessoriesBK-GAS FastenersLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Topaz Contact InformationDealer Telephone