OmniTek 839-1340, 839-1290, 839-1320 owner manual Twist-lock the vent cap and seal

Page 17

Step 9.

Twist-lock the vent cap and seal.

Note: For multi-story vertical installations, a ceiling firestop is required at the second floor, and any subsequent floors (Figure 5.16). The opening should be framed to 10 in. x 10 in. (254mm x 254mm) inside dimensions, in the same manner as shown in Figure 5.13.

Nails

Ceiling Firestop

Minimum 1 in.

(25mm) Clearance

Minimum 1 in.

(25mm) Clearance

Minimum 1 in.

(25mm) Clearance

Minimum 1 in.

(25mm) Clearance

Figure 5.16

WARNING

Fire Risk.

Explosion Risk.

Any occupied areas above the first floor, including closets and storage spaces, which the vertical vent passed through must be enclosed. The enclosure may be framed and sheetrocked with standard construction materials; however, refer to these installation instructions for the minimum allowable clearance between the outside of the vent pipe and the combustible surfaces of the enclosure. Do not fill any of the required air space with insulation.

Quadra-Fire • Topaz • 7009-113 Rev. J • 12/11

17

Image 17
Contents Hot glass will cause burns Do DiscardnotWelcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Manufacturer Requirements Requirements for the Commonwealth of MassachusettsGas Equipment Venting System Provided Gas Equipment Venting System not ProvidedGetting Started Design & Installation ConsiderationsInspect Appliance & Components Tools and Supplies NeededDesign Purposes only Selecting Appliance LocationClearances Vent Termination Minimum Clearances 4Termination LocationsAlcove Applications Venting Components Vent InformationUse of Elbows Measuring StandardsVenting Guidelines How to Use the Vent GraphVertical Distance From Appliance toType B Rear Installations for Use with Rear Vent Kit Type a Up & Out Installations for Top Vent ConfigurationsHorizontal Termination StepTop Vent Touching the hot cap Step Vertical TerminationDirect Vent Pipe Ceiling Joists Framing 2 in mm Long Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Fire Risk Explosion Risk Retro Connector Converting to LP Gas Gas InformationFuel Conversions Propane Natural GAS Valve Regulator ReplacementPressure Gas PressuresCheck for GAS Leaks Gas ConnectionConnecting to the Appliance Recommendation for WireStanding Pilot Ignition System Wiring Wire Size Max. LengthThermocouple Gas Pilot Ignitor Thermopile Switch Red 28Ignitor Red 28 711mm ON/OFFTop to Rear Vent Conversion Appliance SetupRemove Shipping Materials Leg Leveling System AccessoriesFor Both Quartet and Solitaire Fronts Front Installation Fronts shipped attached to faceBrick Installation Qty Description Positioning the LogsMineral Wool Blower Installation Glass Door Assembly ReplacementWhite Shutter Adjustment Damper AdjustmentFor TOP or Rear Vent Installations Make adjustmentControls Operating InstructionsBefore Lighting Appliance Lighting Appliance For Your Safety Read Before LightingAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing Your ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectReference Materials Appliance Dimension DiagramMm inner pipe 6-5/8 in mm outer pipe Vent Components DiagramDescription Vent Components ListSimpson Dura-VentSimpson HHT SLPDescription Dura-Vent Termination Caps & KitsDirect Vent Gas Stove RD. Service Parts ListLog Set Assembly Part number list on following Stocked Service Parts ListAt Depot Description Comments Part NumberSIDE-TPZ-POR BRNR-TOPAZSIDE-TPZ-MBK TOUCHUP-CWL TOUCHUP-CSBStocked BK-GAS Description Comments Part Number AccessoriesWSLG-CSB FastenersLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Dealer Telephone TopazContact Information