Napoleon Fireplaces GDS60N Vertical AIR Terminal Installation Model GDS60, Roof Support, Air

Page 28

28

5.2.4 VERTICAL AIR TERMINAL INSTALLATION - MODEL GDS60

!WARNING

MAINTAIN A MINIMUM 2” SPACE BETWEEN THE AIR INLET BASE AND THE STORM COLLAR.

A.

Fasten the roof support to the roof using the screws provided. The

 

 

 

 

roof support is optional. In this case the venting is to be adequately

 

 

 

 

supported using either an alternate method suitable to the authority

 

 

 

 

having jurisdiction or the optional roof support.

FIGURE 5.2.4a

 

 

 

B.

Stretch the inner flex pipe to the required length. Slip the

 

 

 

 

inner flex pipe a minimum of 2” over the inner pipe of the air

 

 

 

 

terminal connector and secure with 3 #8 screws. Seal using

 

 

 

 

a heavy bead of high temperature sealant W573-0007 (not

 

 

 

 

supplied).

 

 

 

 

C.

Repeat using the outer flex pipe, using a heavy bead of

 

ROOF SUPPORT

 

 

 

 

high temperature sealant W573-0002 (not supplied).

 

 

 

 

D.

Thread the air terminal connector / vent pipe assembly down through

 

 

INNER PIPE

 

 

 

 

the roof. The air terminal must be positioned vertically and plumb.

 

 

FIGURE 5.2.4d

 

Attach the air terminal connector to the roof support, ensuring that the

AIR

 

top of the air terminal is 16” above the highest point that it penetrates

 

 

 

 

TERMINAL

 

 

the roof.

 

CONNECTOR

E.Remove nails from the shingles, above and to the sides of the air terminal connector. Place the flashing over the air terminal connector leaving a min. 3/4” of the air terminal connector showing above

the top of the flashing. Slide the flashing underneath the sides and upper edge of the shingles. Ensure that the air terminal connector is properly centred within the flashing, giving a 3/4” margin all around. Fasten to the roof. Do not nail through the lower portion of the flashing. Make weather-tight by sealing with caulking. Where possible, cover the sides and top edges of the flashing with roofing material.

HIGH TEMPERATURE SEALANT

INNER FLEX PIPE

OUTER FLEX PIPE

F.Aligning the seams of the terminal and air terminal connector, place the terminal over the air terminal connector making sure the vent pipe goes into the hole in the terminal. Secure with the three screws provided.

G.Apply a heavy bead of weatherproof caulking 2” above the

flashing. Install the storm collar around the air terminal and slide down to the caulking. Tighten to ensure that a weather-tight seal between the air terminal and the collar is achieved.

2” AIR INLET BASE

CAULKING

STORM COLLAR

WEATHER SEALANT

FLASHING

H.

If more vent pipe needs to be used to reach the appliance see “HORIZONTAL

FIGURE 5.2.4e

 

AIR TERMINAL INSTALLATION” section.

 

 

 

 

24.1

 

 

 

 

W415-0788 / A / 09.22.09

Image 28
Contents GDS60N & GS60N Table of Contents Installation Overview InstallationIntroduction Dimensions General InstructionsWe suggest that our gas General InformationRating Plate Model Natural GAS/GAZ NaturalCare of Glass Shipping BracketGlass Door Removal Shippingbracket LatchRefer to the section applicable to your installation Venting Model GDS60Venting Lengths and Components Part Supplier WebsiteMinimum Feet Maximum Typical Vent InstallationsTOP Vent Minimum Feet Maximum Rear Vent Rise PlusMinimum Plus Rise Special Vent Installations 3.3.1 Periscope Termination Corner TerminationGrade To Grade MinimumInstallations Canada Vent Terminal ClearancesVenting Application Flow Chart TOP Exit Rear ExitElbow Vent Length Values DefinitionsFeet Inches TOP Exit Horizontal Termination HT VTFormula 1 HT VT Formula 2 HT + VT 40 FT Rear Exit Horizontal Termination Horizontal Vent RUN Plus Offset in Feet HT10c TOP or Rear Exit Vertical Termination 11a11c Orifice Replacement Installation Preparation Model GDS60Rear Vent Termination Changing a TOP Vent to a Rear Vent Minimum Clearance to Combustibles InstallationMaintain These Minimum Clearances to Combustibles Horizontal Installation Wall and Ceiling ProtectionVertical Installation Horizontal AIR Terminal Installation Model GDS60Vertical AIR Terminal Installation Model GDS60 High Temperature Sealant Inner Flex PipeRoof Support Inner PipeMobile Home Installation Model GDS60 GAS InstallationHigh Temperature Sealant Appliance Vent Connection Model GDS60Vent Specifics Model GS60 5.7.1 Chimney Installation Optional Wall Switch / ThermostatWire Size MAX. Length Installing B Vent Combustion AIRAdding Vent Sections More MIN Flat Roof WallInstalling Flashing and Storm Collar Caulking Storm Collar Weather Sealant FlashingGlass Door Installation and Removal FinishingFront Cast Removal Return FlangeGlass / Door Replacement LOG PlacementLogo Placement Switch and Bracket Installation Access Cover PlateOptional Blower Installation Slot Removed ScrewsWiring Diagram Operating Instructions OperationModel GS60 only Venting Action Check Anti Condensation Switch Lighting InstructionsAdjustment Pilot Burner AdjustmentVenturi Adjustment Flame CharacteristicsMaintenance Replacements Common ComponentsGS60 Components Roof Terminal Kits 49 50 Trouble Shooting Symptom ProblemSymptom Problem Test Solution HOT GDS600 onlyGlass Embers only GS600 onlyWarranty Conditions and LimitationsService History Appliance Service History