Bosch Appliances D7412GV3, D9412GV3 Completing the Installation, Programming the Control Panel

Page 17

D9412GV3/D7412GV3 Operation and Installation Guide

4.0

Installation

 

 

 

4.6Completing the Installation

If not already complete, make the earth ground connection to Terminal 10 and lock the reset pin in the closed position.

4.6.1Charging the Battery

Connect the battery, then the transformer to allow the control panel to charge the battery while you complete the installation. Refer to Section 5.0 Power Supply on page 22 for instructions.

On-board Buzzer Sounds at Power Up and Reset: The system performs a series of self-diagnostic tests of hardware, software, and programming at power up and at reset. The buzzer on the control panel sounds during the tests. The self-diagnostics tests complete in approximately 1 to 3 sec.

If the control panel fails any test, the buzzer continues sounding and a System Trouble message appears at the keypads.

Touch Terminal 10 First: If the on-board buzzer sounds briefly when the control panel is touched, any static charge you carry discharges to the control panel.

Avoid electrostatic discharge. Always touch Terminal 10, the earth ground connection, before beginning work on the control panel.

If the control panel receives an electrostatic discharge, it might generate Watchdog Reset and Param Fail events.

4.6.2Installing and Wiring Detection Devices

Install and wire detection devices and keypads at their locations throughout the premises. Do not connect the control panel yet.

Section 8.0 On-Board Points on page 31 contains instructions for wiring the on-board points to detection devices. Section 11.0 Arming Devices on page 55 contains instructions for wiring the keypads.

Instructions for wiring the off-board point POPIT sensor loops are found in the instructions packaged with the POPIT modules.

4.6.3Installing Modules and Relays

1.Power down the unit by unplugging the transformer and disconnecting the battery.

Always power down the unit when installing modules or relays, or when making wiring connections to the control panel.

2.Install and wire any modules required for the installation as described in the module’s installation instructions.

Instructions for the D8125 POPEX Module, D8128D OctoPOPIT Module, D8129 OctoRelay Module, D811 Arm Status Relay Module, and D928 Dual Phone Line Switcher appear in this guide.

Refer to Section 9.0 Off-Board Points on page 36 for D8125 and D8128D instructions. Refer to Section 10.0 Off-Board Relays on page 50 for D8129 and D811 instructions. Refer to Section

7.11 D928 Dual Phone Line Switcher on page 30 for D928 instructions.

3.If using the power outputs at Terminals 7 or 8, refer to Section 6.4 Programmable Power Output Terminals 6, 7, and 8 on page 27 for instructions.

4.6.4Connecting the On-board Points and Keypads

4.Connect the on-board points and keypad wiring to the system. Refer to Section 8.0 On-Board Points on page 31 and Section 11.0 Arming Devices on page 55 for instructions.

4.6.5Powering Up

Reconnect the battery, then plug in the transformer. The buzzer sounds for two sec when the control panel is powered up. Leave the reset pin in the locked position.

Yellow Charging Status LED Remains Lit: If the yellow charging status LED remains lit after five minutes of powering up the control panel, either the battery is deeply discharged or too many powered devices were connected to the control panel. Combined continuous current draw for Terminals 3, 8, 24, and 32, and the accessory connector cannot exceed 1.4 A. Refer to Section 6.0 Power Outputs on page 26 for help.

4.7Programming the Control Panel

If the control panel is not already programmed, review the D9412GV3/D7412GV3 Program Entry Guide (P/N: F01U170807). Ensure that all accessory modules for desired features are available for installation.

Use RPS to load a custom program into the control panel as needed.

Bosch Security Systems, Inc. 10/10 F01U143070-03

17

Image 17
Contents D9412GV3/D7412GV3 Certifications and Approvals TrademarksListings and Approvals Federal Communications Commission FCC RulesRinger Equivalence 0.0B Service Center in USAFCC Registration Number Contents Appendix B Point Address Charts Programmer and Accessory ConnectionsAppendix a System Wiring Diagrams, Issue a Tables Related Documentation IntroductionEffects Precautions during InstallationLightning Strikes Features D9412GV3 D7412GV3 Configuration and PartsOverview GV3 Series Control Panel DifferencesAssembly Parts ListLiterature Pack Parts Available by Separate OrderModel Title Fire Intrusion AccessoriesCompatible Accessories1 Features in the D9412GV3 and D7412GV3 Access Control KeyswitchGround Fault Detection KeypadsInstallation Preparation InstallationEnclosure Options Mounting EnclosureConnecting Earth Ground Installing the Control PanelGround Fault Detect Enable TerminalGround Fault Specifications Enabling Ground Fault DetectionGround Fault Impedance Specifications Locking the Reset PinProgramming the Control Panel Completing the InstallationTesting the System Installing the Point Chart LabelService Walk Test Service Walk Test ProcedureD9412GV3/D7412GV3 Operation and Installation Guide Text displays for 60 seconds Bosch Security Systems, Inc /10 F01U143070-03Test a device D7412GV3 Service Walk Test Flow Chart Secondary Power Terminals Power SupplyPrimary Power Terminals 1 Non-Power-Limited Wiring D8132 Boost Battery Backup Adding a D8132 Replacing the Battery Charging and Battery LEDsInvestigate Low Battery reports immediately If Battery Charging CircuitCharging Status and Low Battery LEDs Battery Discharge and Recharge ScheduleDischarge Cycle Recharge CycleTotal Available Power Power OutputsContinuous Power Output Terminals 3, 8, 24, Circuit ProtectionVerification and Reset Relay Programmable Power Output Terminals 6, 7,A  NSC current = Alarm current Required Step Available Voltage Output at Terminals 6, 7,Registration Telephone ConnectionsNotification LocationOperation Monitor LED Green Phone LED RedDialing Format Telephone Line MonitorDescription 11 D928 Dual Phone Line SwitcherPoint Sensor Loops On-Board PointsTerminals 11 to 22 Description Loop Voltage Range Point ParametersPoint Parameters Point Response Time 64 mm 1/4 Minimum distance Comm Point Zonex Bus D9412GV3 Terminals and D7412GV3 Off-Board PointsError Condition Result Additional Information Off-Board Point ErrorsD8125 and D9127 Popit Modules 5 D9412GV3/D7412GV3 Responses to Missing Point ConditionsConnecting the D8125 Popex to the D9412GV3 Control Panel Connecting the D8125 Popex to the D7412GV3 Control Panel Installing the D8125 Popex Module Popit Sensor Loops Wiring Data Expansion Loops to Popex ModulesPopit Module Point Assignments Program Record SheetProgram Record Sheet Popit Labels D8128D OctoPOPIT ModuleD8128D OctoPOPIT Layout Requirements for Fire Initiation ApplicationsSetting the OctoPOPIT Switches InstallationAddress Switches D8128D OctoPOPIT Switch Settings for D9412GV3 and D7412GV3Using the Terminal Strip Wiring OctoPOPITsMounting OctoPOPITs Terminal Strip ConnectionsConnecting D8128D OctoPOPITs to the D9412GV3 Connecting D8128D OctoPOPITs to the D7412GV3 Wiring Multiple D8128Ds Using Molex Connectors Using Molex ConnectorsOctoPOPIT Sensor Loops Testing Off-Board Points10.1 D8129 OctoRelay Off-Board RelaysRelay Outputs Configuring the D8129 OctoRelayD8129 OctoRelay Switch Settings Number of D8128Ds Used with D8129s Wiring Connections10.2 D811 Arm Status Relay Module D811 Module Wiring to the D9412GV3 D811 Module Wiring to the D7412GV3 Arming Devices Keypad Address SettingsDescription Keypad Terminals 29 toExtra Power for More Keypads Wire Limits for Individual DevicesD9412GV3 Keypad D7412GV3 Function Wire Terminal Color Keypad ConnectionsOperation Maintained Contact Keyswitch11.3 D279A Independent Zone Control Silencing the Bell Momentary Contact12.3 D9131A Parallel Printer Interface Module InstallationSDI Devices SDI Addresses 88 12.4 D9210B Wiegand Control Interface ModuleSupervision Address SettingsNetwork Interface Modules Programmer Connector Programmer and Accessory ConnectionsInstaller Keypad and Local Programmers Mode Programmer Access ReportsAccessory connector Programming connector Accessory Connector14.1 D9412GV3 Faceplate FaceplatesD7412GV3 Faceplate 14.2 D7412GV3 FaceplateD9412GV3 Control Panel Appendix a System Wiring Diagrams, Issue aD9412GV3 D9412GV3, SDI Devices System Wiring System Wiring D7412GV3 Control Panel D7412GV3, Power Supply Side System WiringD7412GV3 D7412GV3, SDI Devices System Wiring Zonex 1 Point Address Chart Appendix B Point Address ChartsZonex 2, Points 129 to 247 D9412GV3 Only Zonex 2 Point Address ChartPower Supply SpecificationsD9412GV3/D7412GV3 Operation and Installation Guide Notes Bosch Security Systems, Inc
Related manuals
Manual 154 pages 49.97 Kb

D9412GV3, D7412GV3 specifications

The Bosch Appliances D9412GV3 is a perfect blend of functionality and innovation, designed to meet the needs of modern households. This dishwasher is part of Bosch's reputation for creating high-quality, energy-efficient home appliances. With a sleek design and advanced technology, the D9412GV3 stands out in the crowded market of dishwashers.

One of the main features of the D9412GV3 is its remarkable efficiency. With an Energy Star rating, this model is designed to minimize water and energy consumption while still delivering exceptional cleaning performance. The EcoSense technology optimizes water usage, ensuring every wash cycle is both effective and economical, making it a responsible choice for energy-conscious consumers.

The dishwasher offers a spacious interior, capable of accommodating large loads. Its flexible rack system includes adjustable tines and folding platforms, making it easy to fit various dish sizes, from pots and pans to delicate glassware. Additionally, the third rack feature provides extra space for utensils and smaller items, enhancing its capacity and versatility.

In terms of cleaning power, the D9412GV3 is equipped with the PrecisionWash system. This cutting-edge technology features intelligent sensors that continuously scan and check the load, adjusting the wash cycle as needed for optimal results. Coupled with the 40 dBA noise level, it ensures that the dishwasher operates quietly in the background, so you can enjoy your home without disruptive sounds.

Another standout characteristic is the PureDry technology, an integrated drying system that uses a condensation process to gently dry dishes without the need for extra heat. This not only protects sensitive items but also saves energy, further enhancing the appliance's eco-friendly nature.

Ease of use is a priority for Bosch, as seen in the D9412GV3's user-friendly controls. The intuitive interface allows for selecting various wash cycles and options, including Heavy, Auto, and Quick options, catering to different cleaning needs. Additionally, the Time Delay feature provides the flexibility to set the dishwasher to run at a later time, great for aligning with your schedule.

In summary, the Bosch D9412GV3 combines innovative technologies with a user-centered design to deliver a top-tier dishwasher experience. Its energy-efficient operation, spacious interior, and advanced cleaning features make it an excellent choice for any kitchen, ensuring spotless dishes with minimal effort. With Bosch's commitment to quality, the D9412GV3 stands as a reliable and stylish addition to any modern home.