Roberts Gorden
HE40DL, HE20ST, HE50DL, HE45UT, HE30DL, HE50ST Troubleshooting Flow Chart Multiburner
Troubleshooting
Specification
Install
Parts list
Internal Wiring Diagram
Wiring
Maintenance
Optional Heater Accessories
Coupling and Tube Assembly
Adjust Undershield Height
Page 72
B
LACKHEAT
®
HE I
NSTALLATION
O
PERATION AND
S
ERVICE
M
ANUAL
Troubleshooting Flow Chart (Multiburner)
66 of 73
Page 71
Page 73
Image 72
Page 71
Page 73
Contents
If you smell gas
Owner
Page
Table of Contents
Roberts-Gordon Europe Limited
Page
Bottom and Back Panel Label Placement
Table of Figures
Page
Product Approval
Heater Safety
Control Side Label Placement
Installer Responsibility
Low Level User Instructions
National Standards and Applicable Codes
Clearances to Combustibles
Clearances Data Linear and Double Linear
Model
HE40ST HE45ST HE50ST
HE15ST HE30DL
HE45ST HE50ST
HE15UT
HE20UT
HE25UT
HE30UT
TUBE, Opposite 45 Tilt
TUBE, Protective Grille
Major Component Descriptions
General Suspension Details
Typical Suspension Details
Linear & Double Linear Heater Installation
Linear Standard Parts List
Description
Linear General Assembly Overview
HE15ST f HE20ST HE25ST f
HE35ST HE40ST f
HE45ST HE50ST f
Double Linear Standard Parts List
Double Linear General Assembly Overview
HE30DL f
HE60DL HE70DL f
Burner Tube Installation
Coupling and Tube Assembly
Open
Closed
1 Coupling and Tube Assembly
2 Coupling and Tube Assembly
Tighten slide bar as shown below
Tube Clamp Package Installation
Hanger
Option B
Option a
Fan Tube Weld Spot Coupling Tee
Tube Heater Installation
Tube Standard Parts List
Lockwasher 6mm
Tube Assembly Overview
Blackheat HE
HE15UT g HE20UT g
HE30UT HE35UT g
HE45UT g
U-tube Hanger Placement
Burner Tube and Fan Tube Installation
1 Tube Clamp Package Installation
U-tube Support Bracket Assembly Installation
Tube, Standard Tube, Opposite
Orient coupling so that Impact block is
Tube Installation
U-tube Installation
Reflector 02750303
Reflector Support Strap 03050000 Screw #8 x 3/4
Multiburner Configuration & Installation
Typical Manifold Layout Linear and U-Tube Configuration
Burner & FAN Installation
Burner Installation
Standard Fan Assembly
IP55 Fan Assembly
Linear & U-tube Fan Installation
Double Linear Fan Installation
1 Double Linear Fan Installation
Condensate Drain Assembly
Non-Return Valve
Optional Heater Accessories
Reflector Side Extension Installation 1 Bracket Installation
2 Side Reflector Installation
Tube Cover Installation
Step
2 Frame Shield Installation
Distance a Extension
2 Grille End Cap Installation
3 Grille Installation
Sports Hall Guard Installation
2 Fastener Installation
1 Grille Installation
3 Mesh Guard Connection
Undershield Installation 10.6.1 Hanger Installation
Undershield Installation
Adjust Undershield Height
Hardware Installation
Wall Mounting
Venting and Fresh AIR Supply
Outside Combustion Air Supply
Air Supply Requirements
Air Supply with Flue Configurations
Common Duct
GAS Piping
Incorrect Positions Wrong Installation
Correct Positions
Wiring
Typical External Wiring Diagram Linear or U-Tube
Typical External Wiring Diagram Double Linear Option
Typical External Wiring Diagram Multiburner
Internal Wiring Diagram
Heater Lockout Indicator by Connector
Operation and service
Operation
Tubing may still be hot
Heater Lockout Indicator by Volt Free Connector
Testing
Commissioning Multiburner
System Checks
Servicing Instructions
Pressure Switch
Maintenance Checklist
Electrode
Automatic Flame Control Unit
Vent Pipe
Outside Air Inlet
Tubes
Gas Line
Troubleshooting
Troubleshooting Flow Chart Linear, Double Linear
U-Tube
Troubleshooting Flow Chart Linear, Double Linear and U-Tube
Chart Multiburner
Troubleshooting Flow
Troubleshooting Flow Chart Multiburner
Manifold Gas Pressure Setting
Manometer 4 3 2 1 0 1 2 3 4 5
Replacement Parts
V2 W3
Viewer Window Replacement Package P/N
Door Gasket Replacement Package P/N
Gas Valve Replacement Package P/N
Description Quantity
Specifications
Linear Heater
Double Linear Heater
Tube Heater
Burner Specifications
Standard Burner Specifications
Models HE15 HE20 HE25 HE30 HE35 HE40 HE45 HE50
Page
Page
Maintain Clearance Side Clearance below
Related pages
All Troubleshooting page
Troubleshooting-Camera Dock for Kodak CX6230
Troubleshooting for COBY electronic TFDVD5605
Section IV Troubleshooting for Hubbell Electric Heater Company CE110
Troubleshooting Your Projector for Dell S300W
Troubleshooting for Hamilton Beach 29881
TROUBLESHOOTING for Evo Fitness EVO2
Trouble Shooting for United States Stove 5500XL
Troubleshooting & Maintenance for LG Electronics C Series
Troubleshooting for Kodak PDV-70X
TROUBLESHOOTING for Desa VF-24N-PJD
Where can I find the
Atwood 8940-III-DCLP wiring diagram
?
Top
Page
Image
Contents